cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Peningkatan Pencapaian KPI Timeliness Pada Human Resource Department PT. X Cahyono, Ruth Yolanda Patricia; Aysia, Debora Anne Yang
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X is an international manufacturing company. In October 2015, the work system at Human Resource Department (HRD) PT X has been changed. There are two new Key Performance Indicators (KPIs) as the impact of the changes. One of the new indicators is timeliness, which must be achieved by the specialist team at HRD. The target of timeliness indicator is 97% while the average achievement is still about 62.6%. This research aims is increasing the achievement of timeliness indicator. There are two suggestions that have been made. They are providing a reminder tool for specialist team and changing specialist team’s work system. Reminder tool is useful as a job reminder for specialist team. Specialist work system is changed by dividing the role of each specialist based on the type of existing processes, so specialist will be more focus with their task. The reminder tool has been implemented for three months, and as a result the timeliness indicator achievement is increase to 93%.
PERHITUNGAN WAKTU BAKU DENGAN BERBAGAI VARIASI PRODUK DI PT X Susanti, Eni; Palit, Herri Christian; Aysia, Debora Anne Anne Yang
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Abstract: PT X is karoseri companies that produce box of trucks in general and particular design (Customized design). There are many delays in the fulfillment of customer order. This is caused by a high variety type and size of the vehicles and the company didn’t know time period that is needed to make a product with certain specifications. The purpose of this research is to find the time that is needed to make single product with a specific car size and type (especially for a new type that hasn’t been requested before). Aluminium box type can be classified in 11 different type of cars. Based on 11 types of car there are 6 work process which contain of 342 work process elements.  The data collection is perfomed using a stopwatch time study. As a result, the working element can be divided into 2 kind of time calculation. They are work element which is based on the quntity of the product component and work element which is based on the dimension of the product component.
Evaluasi Supplier Kawat Ulir di CV. Jaya Koil dengan Metode Max-Min Sebastian, Edwin; Widyadana, I Gede Agus
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

A Firm occasionaly has more than one supplier to fulfill their raw material needs. It happened because the firm is confused in choosing the good and the bad one. Supplier evaluation is conducted to figure it out. This evaluation is based on each supplier performance. The purpose of this reserach is to find out the suppliers performance at CV. Jaya Koil. The method used in this research is max-min method. The result of this research is that there’s no dominant difference between one supplier with others, so company may allocate its budget on any supplier
Analisis dan Perancangan Perbaikan Sistem Perencanaan Produksi di PT. X Karyahastana, Robert; Widyadana, I Gede Agus
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X is an company that focus on timber export production. PT. X suffers problem that there is no production planning document that can be checked which cause some delay in order to fulfill the due date of production activities. Besides, the company wants to establish PPIC Department and expects to standardize in all PPIC activities.Production planning system includes creating PPIC Department’s system, procedure and job description, making production planning module, making container setting module, and making production planning format.
Reduction Effort of Motion Waste in a Test Room of Component Products Hadisurya, Kevin; Sutapa, I Nyoman
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The research’s goal is to reduce non-value-added motion or activity of a production process, which can be classified as a waste in a production process. The research is done in test room. Non-value-added motion or activity can reduce productivity and slowing production process. Improvement proposal of this research consist of re-layout proposal of test room and implementation of kaizen in test room. Improvement of re-layout in test room resulting in a better design of layout, showing result of reducing total travel distance of material in testing process. The new layout showing moment calculation result of 107196 meters, while the old layout’s result is 153856 meters. Based on the result, the new layout implemented in test room. Kaizen implementation in test room is done by creating visual control, improvement implemented by creating boundary line of object in test room’s workplace. Improvement also done by creating a place for storing any tools and equipment that support testing process, with refers to the concept of kaizen foam.
Minimalisasi Kegagalan Sirkulasi Pengembalian Feed pada Mesin Pellet di PT Charoen Pokphand Indonesia Feedmill Linardi, Stefanie Mariana; Octavia, Tanti
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

One of the most common problem happened at PT. Charoen Pok­phand Indonesia is the failure in feed collection systems on pellet machine. This failure should be minimized since it creates huge loss in terms of downtime in the working process of the pellet machine. The failure is analysed using 5 Why’s and Failure Mode Effect Analysis (FMEA) to find the source of the failure. From the analysis, the proposed improvements are to change the parts of feed collection systems and to create a guidance in maintaining and monitoring feed collection systems. The failure in feed collection systems did not happen anymore after the proposal is implemented with the saving costs of manufacturing as Rp472.500.000,00 per month.
Penurunan Persentase Kecacatan di PT Injaplast Tanzil, Carolin -; Bendatu, Liem Yenny
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT Injaplast is one of the manufacturing company that produces weaving plastic bags (sacks). PT Injaplast had received customers’ complaint related to its quality, which are tear apart, sacks were broken, logo weren’t centered, sloping cutting, and miscolors. DMAIC (define, measure, analyze, improve and control) is one of the methods that are used to fix the problem. This final project is using cause and effect diagram as a tool to find the root cause of the problem. The proposed improvements are optimalizing the reject sacks with trial and error, using aid instruments, using work instruction, placing poster, maintenance scheduling, string addition, and additonal task to the operator. Quality plan is also given to improve the quality control. Implementation is performed on some of the proposed improvements which are placing poster on putting thread at creel, adding working instruction on loom process and using reject sacks. The result of this implementation showed that the defect percentage after cutting sacks is reduced by 0,39% and the defect percentage after the sacks have been printed is reduced by 0,25%.
Perancangan Lembar Evaluasi Komunikasi Antar Internal Departemen Demi Tercapainya Umpan Balik Di PT. XYZ Gunawan, Cinthia; Rahardjo, Jani
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Evaluation communicaton questionnaire has an important role in improving the internal department working performance because it can dig criticisms, suggestions and constructive feedback to each department. PT. XYZ is not currently using any evaluation questionnaire to dig internal department feedback. The purpose of this research is to design communication evaluation questionnaire to  achieve feedback from another department. The technique that used in this study is semi-structured interview to the respondents who selected using judgment sampling method. Analysis techniques and data processing done with the existing coding assistance in Microsoft Excel to generate descriptive data in the form of feedback between departments. Feedback for the department is divided into two types, namely strength and opportunity for improvement point. Strength point is the strength of a department that must be maintained and enhanced, while opportunity for improvement point points should be used as a reflection to improve the department for the better future.
Studi Kelayakan Pendirian Perusahaan OPP di Kota Sidoarjo Rachmadi, ellysa Lucia; bendatu, liem yenny
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This research aimed to determine the feasibility of OPP plastic Company establishment at Sidoarjo. The research consists of market aspect, technical aspect, legal aspect, and financial aspect. Data collection for market analysis is obtained from three plastic stores at Surabaya and interview method is used to get to know the competitor condition. The forecasting result in technical analysis is used as the input to find out the number of the folding and sealing machine. The number of machine is used to calculate how many operator the company should hire. After that, legal analysis is to know the legality of company establishment. The company requires initial investment Rp.670,693,900.00 and will reach break even point after 49 months with the 5 years internal rate of return 16.1%. Hence, this study is feasible by considering the market aspect, technical aspect, legal aspect, and financial aspect.
Perancangan dan Penerapan ISO 9001:2008 di PT. Teno Tract Indonesia Bintoro, Diah Parwati Dewi; Rahardjo, Jani
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Teno Tract Indonesia, a foundation piling company, had dealt with many type of building construction for private sector, and now wants to get government projects. However, the government requires that PT Teno Tract Indonesia has ISO certificate. Hence, PT. Teno Tract Indonesia planned and prepared to implement quality management system based on ISO 9001:2008. PT. Teno Tract Indonesia also want to increase customer satisfication and improve management system. Three stages to get ISO 9001: 2008 certificate are planning stage, implementation stage and also scoring stage. Planning stage consists of mapping, identification, and documentation. The second stage is quality management system implementation. The last stage is scoring via internal audit. Audit has to be done to know compability of system that has been run based on standard requirements of ISO 9001 : 2008.  Based on internal audit simulation, PT Teno Tract Indonesia has been ready to submit the papers to get ISO certification. Â