cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Perancangan Program Layanan di CV. Sejati Berbasis Hasil Evaluasi Metode Kano Felix Sanders Moelyanto; Kriswanto Widiawan
Jurnal Titra Vol 6, No 1 (2018): Jurnal Online Teknik Industri
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (172.972 KB)

Abstract

CV. Sejati is a service provider company of machinery and electronics repair, located in Jember, East Java. This project focuses on designing service programme. Service quality in CV. Sejati has indicated to be good by pre-research using servqual method. Designing of service programmes is then searched based on the evaluation of Kano method, which is dividing the service programme into Kano’s categories. Result of the Kano method then could be using to modify the service programmes according to the condition and customer’s needs. 
Upaya Peningkatan Output Produksi Pada Fasilitas Kerja Departemen Preparation Di PT. Integra Indocabinet Lim Robby Jayadi; Herry Christian Palit
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (267.725 KB)

Abstract

PT. Integra Indocabinet is a company which produces indoor furniture that is make to order. Problems were discovered on the production floor of Preparation Department, they are in the process of jumping saw and the rotary press. Problem that occurred in the process of jumping saw was inefficient of unloading activities then resulting in the accumulation of wood. On the other hand, problem that occurred in the process of rotary press was overtime process. Regarding of those problems, proposed improvement was given to jumping saw process by redesign its table in order to be more efficient then can speed up the unloading time. While for the rotary press process, it was proposed to add glue spreader roll on each rotary machine so that the clamping process would approach the ideal processing time. Trial of improved jumping saw process has been done and has proven to increase production capacity by 34%, but for the rotary press has not been done yet due to unavailability of spreader roll and unfinished of re-layout process.
Simplifikasi Proses Pengadaan Seragam Tahunan Di PT. X Shandy Alicia Gunawan; Debora Anne Yang
Jurnal Titra Vol 4, No 2 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (945.694 KB)

Abstract

C & B department of PT. X always do continuous improvement as de­part­ment priority. One of the improvement that will be done is simplifying the uniform pro­vision process. The study focused on the provision of an annual uniform. The study be­gins with understanding the stages in annual uniform process. Method that have been used are making a comparison between actual and target time of uniform timeline, ma­king SIPOC charts, and analyzing value added or non-value added activities. Some im­provement suggestions are given in order to support the simplification of the process and re­duce or eliminate non-value added activities. The results of the improvement imple­men­tation is saving the provision time by 5.19 hours or 2 supporting resources.
Analisa Hubungan Faktor Demografis Karyawan dan Lingkungan Kerja terhadap Potensi Penyakit yang Diderita Karyawan PT Ecogreen Oleochemicals Batam Nyoto Hendy Wijaya; I Nyoman Sutapa
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (423.378 KB)

Abstract

This article discuss about correlation between demographic factor of employees and work environment against potential disease suffered by employees. Demographic factor of employees such as job grade, age, weight, and blood pressure. The company wanted to know about description of potential disease suffered by employees based on demographic factor, the correlation between that variables, and know work environment factor which potentially against disease in workplace. Analysis method used Spearman’s Rho Test, Logistic Regression, and Fishbone Diagram. The higher demographic factor cause the disease suffered by employees more dominated by degenerative disease. All demographic factor have a correlation with potential disease suffered by employees, but only 13 from 24 disease have strong correlation. The potential disease suffered by employees also caused by 2 factors from work environment, namely man (employees awareness still lacking) and management (role of company not optimal). This research was ended by doing effectiveness of annual medical check up analysis, namely by eliminating blood glucose test and add USG mammae test. The company should give further attention to employees, such as give a punishment to employees who not wearing PPE, auditing SHE in workspace, improve the infrastructure and provide training for employees about SHE.
Perancangan Quality Plan Daging Ayam Kapas di Peternakan XYZ Michael Eka Putra
Jurnal Titra Vol 7, No 2 (2019): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (254.105 KB)

Abstract

Chicken farm must concern about their production process. Farm XYZ just started selling cotton chicken meat to supermarket in 2019. The problem of farm XYZ is returns from supermarket, because of the quality of the chicken’s meat. Farm XYZ does not have structured quality control system. The aim of this research is making quality plan for farm XYZ so that the number of returns can be reduced. Five why analysis was use to analyze the problem. The final result of the research is the design of quality plan based on the order of the production process.
Perbaikan Temuan Plant Audit Di PT X Dengan Berpedoman ISO 22000:2005 Anggara Jaya; I Gede Agus Widyadana
Jurnal Titra Vol 6, No 2 (2018): Jurnal Titra vol. 6 No. 2, Juli 2018
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (263.432 KB)

Abstract

PT X is agro industry that engaged in animal feed. This research is shown to help the correction of plant audit invention in PT X with guidance of ISO 22000:2005. The correction of plant audit invention is especially for warehouse department. The result of plant audit invention that founded in warehouse department is ten results in total. Correction of plant audit invention is done by obrserving and doing interview to related parties. Correction is done through SOP replacement, procedure addition, cleaniness, checklist creaction, and suitable right place transfer.
Perancangan Sistem Pengendalian Kualitas di PT X Ellen Yunita Puspitasari; Debora Anne Yang Aysia
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (733.63 KB)

Abstract

PT X is a private company, which is manufacturing security and safety protection. There is no quality control system on production process, which cause 100% rework. Quality control system has been design to control the incoming material, production process, and finish goods. Quality control system design done by creating quality characteristics, cheek sheets, and work instructions. Which is obtained by directly observing at production process, and interview with the members of company. Suggested quality control system has been verified by the company and can be seen in the quality plan. 
Panduan Training untuk Operator Test Room di PT “X” Sherly Silvia Dewi; Felecia Felecia
Jurnal Titra Vol 5, No 2 (2017): vol 5 no 2, Juli 2017
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (215.538 KB)

Abstract

This study has been done to create training guide for operator test room AB. There is no clear training guide and only rely on work instruction (WI) during training makes the operator not have clear guidelines. This project use direct observation in the field and Q&A against the parties which have relation with test room AB. And then, the result of the observation will be organized become training guide for operator test room AB. This training guide is expected to get an effective and efficient training which can increase number of competent operators.
Pengurangan Jumlah Produk Setengah Jadi di PT. SEMB-PEL Rizal Setiawan; I Gede Agus Widyadana; Herry Christian Palit
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (231.857 KB)

Abstract

The need for work in process on PCBA production line can be caused by fluctuating demand for PCBA products. Amount of work in process on production line that company wanted is between 3 up to 7 inventory days. Average current amount of work in process before implementation of proposed improvement is 12.03 inventory days. Root causes anaylise uses root cause tree. There are two proposed improvements, which are improvement on work in process update’s system and improvement on material distribution to every work station. Proposed improvement that can be implemented is improvement on material distribution of every work station. Average amount of work in process after implementation the improvement is 6.72 inventory days.
Standarisasi, Monitoring, dan Compliance Kebersihan dan K3 Evan Ganda Santoso
Jurnal Titra Vol 4, No 1 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (318.398 KB)

Abstract

Standarization and monitoring are important to control all activity in a company. The project is focused on making of Standart Operating Procedure (SOP) for hygiene and safety also on 5R applying on daily activity in every PT Warung Indonesia’s outlet is important things to do a business. Work performance measurement have did to find productivity level. This project was using observation method and identification of tool use in determining SOP and 5R and work sampling method to find work performance. The result work performance measurement is 89,93%, it shows that all workers works optimaly. This productivity will be more increasing by assigning SOP and 5R for hygiene and safety.