cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Perancangan Manajemen Risiko Proses Certificate of Origin di PT. X Stanley Lorinanto; Karina Agustin
Jurnal Titra Vol 7, No 2 (2019): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (264.297 KB)

Abstract

PT X is a multinational company with many export and import activities for expanding their markets. PT X has a problem in import activities regarding payment for import duty’s penalty and tax’s penalty. PT X never know the root causes that cause a penalty on import duty and that’s why the right actions to solve the problems is never be done. PT. X propose a new method to know the root cause of the problem which called Reconcile. Reconcile method still have so many technical problems that will make the result won’t be accurate. Risk Management method is used to analyze the risk that happened during the COO issuance. Risks that have been analyzed will be sorted based on its handling priority using Risk Matrix method. The result of this research yield to solution which is and direct feedback and refreshment to PT. X to solve the technical problems that happens during the reconciliation process.
Monitoring Penggunaan Energi, Emisi Karbondioksida, dan Air di PT. X Melina Andriani Santoso
Jurnal Titra Vol 6, No 2 (2018): Jurnal Titra vol. 6 No. 2, Juli 2018
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (281.762 KB)

Abstract

PT.X is a company that produces consumer goods located at Rungkut. One of the departments at PT.X is engineering services department. Part of the tasks that this department aware are monitoring energy usage, carbon dioxide emission, and water usage for each year on each factory. There factories are monitored, that is Sukorejo factory, Karawang factory, and SKT factory. The department will receive data of energy, carbon dioxide emission, and water usage performance in the forms of excel template files. The existed problems at the beginning of this project were, for each department they had their templates for recording the data. It was challenging to evaluate the energy usage, carbon dioxide emission, and water usage, and to compare them “apple to apple”. Another problem faced by the department was knowing the sources of higher usage in energy, carbon dioxide emission, and water. Therefore, to solve those problems, in this project we propose a new template that covers all three factories data set. The new template is standardized for all departments level. Additionally, it is constructed using Microsoft excel with macro feature, so that it will be easier for a user to input and evaluate data. The template has two functions, that is for inputting data, and reporting the summary statistics. The summary statistics is reporting in a form of a dashboard.  It is well known that a dashborad can help the management to analyze the data, and to make the performance comparison across all departments level.
Minimalisasi Kegagalan Sirkulasi Pengembalian Feed pada Mesin Pellet di PT Charoen Pokphand Indonesia Feedmill Stefanie Mariana Linardi; Tanti Octavia
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (455.08 KB)

Abstract

One of the most common problem happened at PT. Charoen Pok­phand Indonesia is the failure in feed collection systems on pellet machine. This failure should be minimized since it creates huge loss in terms of downtime in the working process of the pellet machine. The failure is analysed using 5 Why’s and Failure Mode Effect Analysis (FMEA) to find the source of the failure. From the analysis, the proposed improvements are to change the parts of feed collection systems and to create a guidance in maintaining and monitoring feed collection systems. The failure in feed collection systems did not happen anymore after the proposal is implemented with the saving costs of manufacturing as Rp472.500.000,00 per month.
Pengembangan Produk Masker di PT. XYZ Dengan Metode Kansei Engineering OLIVIA GIOVANI THESMAN; JANI RAHARDJO
Jurnal Titra Vol 5, No 1 (2017): JURNAL TITRA
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (295.463 KB)

Abstract

Penelitian ini dilakukan untuk mengetahui kekurangan dari produk masker yang diproduksi oleh PT. XYZ. Kansei word akan digunakan untuk analisis kesenjangan. Hasil analisis kesenjangan menunjukkan atribut-atribut yang belum sesuai dengan keinginan konsumen adalah bahan masker (fabric), pengait, warna dan harga masker. Atribut yang telah teridentifikasi dikembangkan dengan metode Kansei Engineering dan dianalisis menggunakan Analisis Konjoin. Analisis Konjoin akan menunjukkan preferensi konsumen terhadap alternatif atribut. Alternatif terbaik untuk masker berbahan katun, menggunakan bahan karet untuk pengait, pengait berbentuk lurus dan menggunakan velcro, dan berwarna gelap. Atribut ukuran pengait dikembangkan menggunakan Antropometri dan untuk harga dilakukan wawancara. Ukuran pengait masker yang paling sesuai untuk konsumen adalah 16.98 cm. Harga yang paling sesuai untuk produk masker adalah harga pada kisaran Rp.20.000-Rp.30.000.
Perancangan Quality Plan untuk Penurunan Tingkat Kecacatan Produk di PT. Sentosa Alloy Industri Gunedi Susanto; Jani Rahardjo
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (398.88 KB)

Abstract

PT. Sentosa Alloy Industri is a company which engaged in spare part manufacture field of motorcycle. This company produces velg, hub, flange, brake handle. The purpose of this study is to devise improvements proposed and quality plan in die casting process which aims to reduce the level of defects and improve the product quality.The result of this study are: the level of porous defects 4,38%,  the level of imperfect product defects 2,08%, the level of sticky product defects 1,43%, and the smallest level of defects is cracked with 0,04%. Potential problem can be identified and analyzed using fishbone and Failure Mode and Effect Analysis method. The improvements proposed to get are got from the highest Risk Priority Number value (RPN), which occurs in Machine (RPN = 128), Method (RPN = 112), Man (RPN = 112), and Material (RPN = 72)
Perancangan Dokumen Hazard Identification, Risk Assessment and Risk Control untuk Mengurangi Potensi Resiko Bahaya pada PT X Ivan Krisnadinata; I Nyoman Sutapa
Jurnal Titra Vol 7, No 1 (2019): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.22 KB)

Abstract

PT X is a factory that produce roasted peanuts and have in total 110 workers in the production process. Based on the historical data, there are 20-30 work accident that happened every year. Thus, this research aim to fix the OHS system management using Hazard Identification, Risk Assesment, and Risk Control (HIRARC) of OHSAS 18001 : 2007 clause. Based on the results of the Risk Assessment, there are 7 of high risk potentials, 21 of medium risk potentials, and 26 of low risk potentials. Continued by adopting Risk Control which aims to minimize the potential hazards of high and medium risks. The result of risk controls are carried out using 5 methods, which are elimination, substitution, engineering control, administrative control, and PPE, but the most commonly used method are the elimination, administrative control, and PPE.
Kelayakan Investasi Mesin Produksi Paku di PT X Yulianto Adhy Nugroho; I Nyoman Sutapa
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (640.241 KB)

Abstract

PT X produces nails and wires. In the production department, especially in nailproduction, the machineries were aged up to 20 years old. Thus the company need to re-invest new machines. There are eight types of nails to produce. The investment calculation andanalysis were conducted using payback period, NPV, and profitability index. There are two alternative for the investment. The analysis results suggested that the company shall invest a total of 28 machines with a total investment of Rp 84.000.000.000,-, or 29 machines with a total investment of Rp 87.000.000.000,-. The first alternative investment is expected to be back within 6 years and 3 months. The second alternative is expected to be back within 6 years and 4 months. This two alternative investment has a positive NPV cost above zero, as well as the probability index is obtained above 1.
Distribusi Chemical di Finishing Line PT. XYZ Danny Fernando; I Gede Agus Widyadana
Jurnal Titra Vol 5, No 2 (2017): vol 5 no 2, Juli 2017
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (277.216 KB)

Abstract

PT. XYZ is a company that produces shoe. This study is subjected to reduce expired chemicals because it was keep too long in finishing line and to design a safer and ergonomic trolley. The amount of expired chemical due to there is no standard scheduled for distributors to distribute chemical in the finishing line so that many chemicals are stored in line and finally expired. The trolley is now considered less secure because there is no buffer on the front of the trolley thus allowing the jerry can to fall. Chemical distribution schedule will be made based on work measurement method. The result of this work measurement is that chemicals will be distributed for an hour so that distributors will distribute chemicals seven times in one work shift. The number of chemicals allowed to be in the finishing line is also limited by the need for chemical for one hour so that no chemical is wasted due to expired. The new trolley will be made based on anthropometry data to make it more comfortable and safe to use.
Menghitung Eco-efficiency di PT. APIE Indo Karunia William Sutomo Lay; Togar W.S. Panjaitan
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (218.693 KB)

Abstract

PT. APIE Indo Karunia produces is a casting company that produces steel and ironpart such as gear. The casting processes include material melting, mold making process usingsilica sand, moldcoating process, and pouring the melted metal into the mold. These processesuse a huge amount of energy that affect to environment. Thus, the calculation of eco-efficiencyratio for PT. APIE Indo Karunia is needed.The eco-efficiency ratio in months February, March and April are 1,06, 1,15 and 1,09respectively. While, the eco-efficiency of the total production on energy consumption are 1,22, 1,2and 1,226. These values are higher than the Indonesian energy eco-efficiency which valued 0,46.It means that the production process of PT. APIE Indo Karunia is still inefficient in terms ofenergy consumption .
Upaya Penurunan Flow Out di Departemen Extrusion Blow Moulding: Studi Kasus Filia Ikaristi; Debora Anne Yang Aysia
Jurnal Titra Vol 4, No 2 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (265.537 KB)

Abstract

PT. X wants to reduce their flow out, because their flow out rate is bigger than the target. Flow out is a condition where the reject product slip away to customer or the next process. The purpose of this research is identifying flow out’s root cause and giving some improvement suggestions. Fishbone Diagram is used to identify the root cause. FMEA and Pareto chart are used to make improvement priority. The improvements are prioritized in man and machine aspect. The root cause from machine aspect are tooling utilizing and machine performance, meanwhile the root cause from man aspect are technician control and the selector’s inspection. The solutions given are doing the tooling stock opname and giving the workers continual training.