cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
semesta_teknika@umy.ac.id
Editorial Address
Jln. Brawijaya Tamantirto Kasihan Bantul 55183 Indonesia
Location
Kab. bantul,
Daerah istimewa yogyakarta
INDONESIA
Semesta Teknika
ISSN : 1411061X     EISSN : 25025481     DOI : https://doi.org/10.18196/st
Core Subject : Engineering,
SEMESTA TEKNIKA is a reputable refereed journal devoted to the publication and dissemination of basic and applied research in engineering. SEMESTA TEKNIKA is a forum for publishing high quality papers and references in engineering science and technology. The Journal is published by the Faculty of Engineering, Universitas Muhammadiyah Yogyakarta, INDONESIA. Copyright is by the publisher and the authors. The Journal is issued in electronic form and also issued in printed form as annual volume for the contributors only. The journal contains original research papers, review articles, short notes and letters to the editors. The topics of interest include modeling, experimental, analytical and numerical investigations on the mechanical, physical, chemical and mineralogical properties of material, developing the prototype/instrument, technology and construction process. Topic of management in industry and civil construction is also considered. SEMESTA TEKNIKA receives manuscripts from the contributor written in the Indonesian and English. Manuscripts submitted to the journal for publication must not have been previously published or is under consideration simultaneously by any other publication. Manuscripts submitted to SEMESTA TEKNIKA will be reviewed Peer Reviewers local and foreign.
Arjuna Subject : -
Articles 715 Documents
Faktor Penyebab Terjadinya Keterlambatan dan Waste Time pada Proyek Pembangunan Konstruksi Turbine Hall PLTU Tambak Lorok Block 3 Semarang Harsoyo, Yoga Aprianto; Arkan, Muhammad Reza
Semesta Teknika Vol 23, No 2 (2020): NOVEMBER 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam suatu pembangunan proyek konstruksi hampir selalu dipastikan terdapat permasalahan yang dapat menimbulkan keterlambatan dan pemborosan waktu. Baik dari proses perencanaan, pengadaan hingga proses instalasi akan dihadapkan pada berbagai permasalahan teknis dan nonteknis yang harus dapat diminimalisir dengan sebaik-baiknya oleh semua pihak dalam proyek konstruksi. Pekerja pada proyek konstruksi seperti Kontraktor Utama dan Kontraktor SUB merupakan pekerja yang sering menghadapi masalah langsung dalam proyek konstruksi. Begitu pula pada proyek pembangunan Turbine Hall di PLTU Tambak Lorok Blok 3 Semarang ditemukan beberapa kendala yang menjadi faktor keterlambatan dan pemborosan waktu. Penelitian ini dilakukan untuk mengetahui faktor-faktor penyebab keterlambatan dan pemborosan waktu menurut beberapa elemen pekerja kontraktor utama dan sub kontraktor yang mengerjakan proyek dengan cara penyebaran kuisioner. Hasil yang diperoleh dari kedua elemen pekerja tersebut kemudian dianalisis menggunakan analisis deskriptif dengan SPSS untuk penyebab keterlambatan dan analisis dengan metode Borda untuk faktor penyebab waste time. Dari faktor-faktor penyebab keterlambatan dan pemborosan waktu yang didapat dari beberapa elemen pekerja, akan dilakukan analisis perangkingan dan diketahui faktor-faktor utama.In a construction project development is almost always sure to always have problems that can cause delay and waste time. Both of the planning process, procurement even until the installation process will be faced with various technical and nontechnical problems that must be able to be minimized as well as possible by all sides of the construction project. Workers in construction projects such as Main contractors and SUB contractors are workers who often face problems directly in the construction project. Similarly, the Turbine Hall construction project at PLTU Tambak Lorok Block 3 Semarang was found in the project a few obstacles which became a factor of delay and waste time. This research was conducted to determine the factors of the cause of delays and waste time according to some elements of the workers ' main contractors and sub-contractors working on the project by the dissemination of the questionnaire. The results obtained from all two elements of the worker are then analyzed using the descriptive analysis with SPSS for the cause of delays and analysis by Borda method to cause waste time factors. From the factors that cause delays and waste time gained from some elements of the worker, there will be a ranking analysis and known major factors. 
Pemanenan Air Hujan Menggunakan Ground Water Tank untuk Pemenuhan Air Baku Di Lokasi Bangunan Perkuliahan (Lokasi Penelitian : Kampus 3, UM Purworejo) Riyanto, Eko; Setiawan, Agung
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kampus 3 (tiga) Universitas Muhammadiyah Purworejo yang beralamat di Jalan Lingkar Barat Purworejo tepatnya di Desa Sucen, Kecamatan Bayan, Kabupaten Puworejo merupakan gedung perkuliahan untuk Fakultas Ekonomi, Universitas Muhammadiyah Purworejo, dengan demikian kebutuhan air bersih untuk mahasiswa dan dosen di kampus tersebut relatif cukup banyak. Waktu musim hujan volume air berlebih menyebabkan limpasan air permukaan menjadi meningkat  terutama di sekitar kampus sedangkan pada musim kemarau terjadi kekurangan air. Sehingga merancang  tampungan air hujan sangat diperlukan untuk tampungan air sehingga air hujan tidak terbuang sia-sia dan dapat digunakan pada musim kemarau. Penelitian ini menggunakan data perhitungan hujan kawasan  merujuk pada teori Polygon Thiessen  serta menggunakan data curah hujan andalan 80%, kemudian mengenai intensitas hujan digunakan teori tentang mononobe, sedangkan perancangan desain dan elemen pendukung tangki penampung air hujan digunakan standar ketentuan dari Kementerian Pekerjaan Umum dan Perumahan Rakyat tahun 2014, tentang Diseminasi Standar dan Manual Penampung Air Hujan. Hasil penelitian menunjukan potensi volume suplai air hujan didapatkan sebesar  976,99 m³/ tahun, dan penghematan air sebesar 0,76 % dari total kebutuhan air gedung perkuliahan sebesar 86.400 m³/ tahun. Perhitungan RAB tangki didapatkan sebesar Rp. 93.998.000,00 untuk dimensi tangki tampungan air hujan sebesar 8 x 5 x 3 m.                    Campus 3 (three) Muhammadiyah University Purworejo which is located at Jalan Lingkar Barat Purworejo, precisely in Sucen Village, Bayan District, Puworejo Regency is a lecture building for the Faculty of Economics, Muhammadiyah University of Purworejo, thus the need for clean water for students and lecturers on the campus is relatively sufficient. Lots. During the rainy season the excess water volume causes surface water runoff to increase, especially around the campus, while in the dry season there is a lack of water. So that designing rainwater storage is very necessary for water storage so that rainwater is not wasted and can be used in the dry season. This study uses regional rainfall calculation data referring to the Polygon Thiessen theory and using 80% reliable rainfall data, then regarding the rain intensity the mononobe theory is used, while the design design and supporting elements of rainwater storage tanks are used as standard provisions from the Ministry of Public Works and Public Housing. 2014, concerning Dissemination of Standard and Manual of Rainwater Storage. The results showed that the potential volume of rainwater supply was 976.99 m³ / year, and water savings of 0.76% of the total water demand for the lecture building was 86,400 m³ / year. The calculation of the RAB for the tank is Rp. 93,998,000.00 for the dimensions of the rainwater storage tank of 8 x 5 x 3 m. 
Deteksi Cacat Lintasan Luar Bantalan Bola pada Fan Industri Menggunakan Metode Cepstrum Kamiel, Berli Paripurna
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bantalan bola pada sebuah fan (kipas) menerima beban dinamis yang sangat besar ketika beroperasi. Hal ini menyebabkan bantalan mengalami keausan yang harus dapat segera dideteksi untuk mencegah kerusakan/cacat lebih lanjut. Salah satu metode deteksi yang sering digunakan adalah metode analisis spektrum. Namun metode ini menghasilkan harmonik dan sidebands yang rumit jika diaplikasikan pada fan dengan transmisi roda gigi sehingga observasi amplitudo pada spektrum sulit dilakukan. Penelitian ini mengusulkan metode cepstrum ketimbang spektrum karena cepstrum dapat mengelompokkan berbagai harmonik yang berasal dari getaran komponen-komponen fan sehingga amplitudo cacat bantalan dapat diidentifikasi dengan mudah dan jelas. Bantalan yang digunakan dalam penelitian adalah tipe ASB 6209 2RS dengan kondisi normal (tanpa cacat) dan cacat lintasan luar. Cacat pada bantalan sengaja dibuat menggunakan Electrical Discharge Machine (EDM)  dengan kawat kuningan berdiameter 0,25 mm. Hasil penelitian menunjukkan bahwa spektrum dapat mendeteksi frekuensi poros fan  9,11 Hz, frekuensi ball pass frequency outer (BPFO) 36,52 Hz, dan frekuensi poros roda gigi 22,59 Hz.  Namun demikian amplitudo BPFO sulit diidentifikasi pada spektrum karena secara visual bercampur dengan amplitudo harmonik dari komponen-komponen lain yang turut bergetar pada fan. Hasil lebih baik diberikan oleh metode cepstrum dimana amplitudo quefrency BPFO sebesar 0,027 detik, yang bersesuaian dengan BPFO, sangat jelas terlihat karena tidak terganggu oleh amplitudo lain di sekitarnya. A Ball bearing in a fan  experience a very large dynamic load during its operation. This causes wear which must be detected immediately to prevent severe damage. One detection method that is often used is the spectrum analysis. However, this method produces complex harmonics and sidebands when applied to a fan with a gear transmission which makes it difficult to observe amplitude on the spectrum. This research proposes the cepstrum method rather than the spectrum because the cepstrum can classify the various harmonics that come from the vibrations of the fan components so that the amplitude of the bearing defects can be identified easily and clearly. The bearings used in the study are ASB 6209 2RS with normal condition (no fault) and with outer race fault. Defect in the bearings is intentionally made using an Electrical Discharge Machine (EDM) with 0,25 mm brass wire. The results show that the spectrum can detect the fan shaft frequency of 9,11 Hz, the ball pass frequency outer race (BPFO) 36,52 Hz, and the gear shaft frequency of 22,59 Hz. However, the BPFO amplitude is difficult to identify on the spectrum because it is visually mixed with the harmonic amplitude of the other vibrating components. A prominent results are given by the cepstrum method where the quefrency of 0,027 s, which corresponds to the BPFO, is clearly visible because it is not disturbed by other amplitudes. 
Penilaian Keselamatan Divisi Fuel Tank terhadap Perilaku Tidak Aman pada Pekerja Faradilla, Arnes; Awod, Usamah Makky; Safitri, Dian Mardi
Semesta Teknika Vol 23, No 2 (2020): NOVEMBER 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Batarasura merupakan salah satu perusahaan manufaktur yang memproduksi Fuel Tank. Permasalahan yang dihadapi oleh perusahaan yaitu terjadi penurunan produktivitas kerja dan meningkatnya jumlah kecelakaan kerja. Tujuan dari penelitian ini adalah untuk menilai keselamatan di perusahaan dan mengetahui dimensi keselamatan yang paling berpengaruh terhadap tingginya angka kecelakaan kerja. Penelitian ini menggunakan kuisioner NOSACQ-50 untuk menilai iklim keselamatan dan metode Correspondence Analysis untuk menentukan dimensi iklim keselamatan yang berpengaruh terhadap kecelakaan kerja. Hasil penelitian menunjukkan bahwa dimensi iklim keselamatan yang paling berpengaruh yaitu tidak adanya pelatihan tentang bahaya kecelakaan kerja dan kurangnya komunikasi antar pekerja. Pekerja sering mengabaikan keselamatan kerja disebabkan oleh kurangnya pengetahuan tentang pentingnya menerapkan disiplin keselamatan kerja. Selain itu, perusahaan seharusnya memiliki komunikasi yang baik terhadap pekerja dan training yang tepat untuk meningkatkan motivasi pekerja dalam membangun sikap keselamatan kerja yang baik PT Batarasura is one of the factories that produce the Fuel tank. The problems of this factory are decreasing of productivity and increasing of the accident. The purpose of this research is to assess of safety in the factory and knowing of safety dimension which may influencing of high accident. This research uses the NOSACQ-50 questionnaire to assess the safety climate and Correspondence Analysis to determine which dimension that influencing the factory's accident. The result stated that the safety climate dimension, which acts as high as the factory's accident, is there is no learning and lousy communication. The worker often ignores safety because worker doesn't know about the importance of safety. On the other hand, the factory doesn't have any regulations when the worker is ignoring safety. So, the factory must have good communication and proper training, especially in security, to increase worker motivation to do the safety act.
Desain dan Simulasi UPS Multilevel Inverter Dengan Metode Modulasi Phase Disposition PWM Wirsuyana, Gede Patrianaya Margayasa; Habibi, Muhammad Nizar; Windarko, Novie Ayub; Suryono, Suryono
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini memaparkan hasil perancangan dan simulasi Uninterruptible Power Supply (UPS) yang berfungsi sebagai sumber energi cadangan ketika sumber energi utama beban padam. Rangkaian UPS ini terdiri dari baterai sebagai sumber energi, konverter DC-DC boost sebagai penaik tegangan dari baterai yang disertai dengan kontrol PI untuk menstabilkan tegangan keluaran konverter, dan multilevel inverter tipe dioda clamped dengan metode modulasi Phase Disposition PWM (PD-PWM) untuk mengubah tegangan DC menjadi tegangan AC yang dapat disuplai ke beban. Pada penelitian ini akan dibahas performa dari konverter DC-DC boost yang dilengkapi dengan kontrol PI dan diode clamped multilevel inverter dalam aplikasinya sebagai UPS yang digunakan untuk menyuplai beban. Hasil penelitian menunjukkan bahwa konverter boost DC-DC mampu menaikkan dan menstabilkan tegangan DC sebesar 339,71 volt dan multilevel inverter mampu mengubah tegangan DC menjadi tegangan AC sebesar 220,41 volt dan tegangan Total Harmonic Distortion (THD) 0,39222% yang dapat disuplai. ke beban sebagai pengganti sumber energi utama. Sistem UPS ini memiliki waktu peralihan 23 milidetik.This paper presents the results of the design and simulation of an Uninterruptible Power Supply (UPS) that functions as a backup energy source when the main energy source of the load goes out. This UPS circuit consists of a battery as an energy source, a DC-DC boost converter as a voltage booster from a battery that is accompanied by a Proportional-Integral (PI) control to stabilize the output voltage of the converter, and a diode clamped multilevel inverter with the Phase Disposition PWM (PD-PWM) modulation method to change the DC voltage into an AC voltage that can be supplied to the load. This research will discuss the performance of the DC-DC boost converter which is accompanied by PI control and diode clamped multilevel inverter in its application as a UPS that is used to supply loads. The results show that DC-DC boost converter is able to increase and stabilize DC voltages by 339.71 volts and multilevel inverters are able to convert DC voltages to AC voltages by 220.41 volts and Total Harmonic Distortion (THD) voltage of 0.39222% which can be supplied to the load as a substitute for the main energy source. This UPS system has a switching time of 23 milliseconds.
Classification of Student Majors with C4.5 and Naive Bayes Algorithms (Case Study: SMAN 2 Bekasi City) Kuntoro, Antonius Yadi; Hermanto, Hermanto; Asra, Taufik; Syukmana, Ferry; Wahono, Hermanto
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

School majors conducted in high school are based on interests and these have a goal to provide opportunities for learners to develop the competence of attitudes, skills competence of learners in accordance with interests, talents, and academic ability in a group of scientific subjects.In this research, the researcher uses two algorithm models that is a comparison between the C4.5 algorithm and also the Naive Bayes algorithm. In this study, the data used is the results of school entrance test data and also the data from psychological results for students who have been declared passed the entrance test school SMAN 2 Bekasi City academic year 2018/2019. By comparison of two data mining classification algorithm, can be proved with accuracy result and AUC value from each algorithm that is for Naive Bayes accuracy = 76,43% and AUC value = 0,846, while for algorithm C4.5 accuracy = 70,29% and AUC value = 0.738.
Operasional Yogyakarta International Airport, akankah Bandar Udara Adisutjipto Digunakan? Setiawan, Danny
Semesta Teknika Vol 23, No 2 (2020): NOVEMBER 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Telah beroperasinya Yogyakarta International Airport (YIA) menggantikan Bandar Udara Adisutjipto (JOG) sejak tahun 2019, menjadi pertanyaan bagi masyarakat akan digunakan untuk apakah Bandar Udara Adisutjipto? dengan menggunakan metode analisis review kebijakan, maka akan dilihat aspek regulasi dan tata ruang terhadap Bandar Udara Adisutjipto. Hasil penelitian menunjukkan bahwa Bandar Udara Adisutjipto yang terdiri dari 2 Terminal akan direncanakan untuk: Terminal A sebagai heritage kuliner dan Terminal B dioperasikan sebagai aktivitas penerbangan pesawat jenis propeller, sementara itu lahan parkir bandar udara akan digunakan sebagai kawasan peruntukan permukiman, hal ini sesuai dengan struktur Rencana Tata Ruang Wilayah (RTRW) Provinsi Derah Istimewa Yogyakarta (DIY) yang mengamanatkan pengembangan Kawasn Berorientasi Transit (TOD). The operation of Yogyakarta International Airport (YIA) has replaced Adisutjipto Airport since 2019, so the question for the community will be used for what is Adisutjipto Airport? by using the policy review analysis method, the aspects of regulation and spatial planning on Adisutjipto Airport will be seen. The results showed that Adisutjipto Airport consisting of 2 terminals would be planned for Terminal A as culinary heritage and Terminal B being operated as a propeller-type aircraft flight activity, while the airport parking lot would be used as a residential designation area, this was in accordance with the structure Regional Spatial Planning (RTRW) of the Special Region of Yogyakarta (DIY) which mandates the development of Transit-Oriented Development (TOD).
Pengaruh Perlakuan Sebelum Alkalisasi dan Waktu Alkalisasi terhadap Sifat Bending Komposit Serat Sisal/PMMA Rahman, Muhammad Budi Nur; Sosiati, Harini
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian komposit serat alam untuk meningkatkan kekuatan mekanis telah dilakukan, salah satunya memodifikasi permukaan serat. Tujuan penelitian ini adalah mengetahui pengaruh pencucian serat sebelum proses alkalisasi dan waktu alkalisasi terhadap sifat bending komposit serat sisal/PMMA. Serat sisal diberi perlakuan sebelum dicetak menjadi komposit dengan dicuci aquades, deterjen, dan direbus sampai mendidih dilanjutkan perlakuan alkali (6% NaOH) selama 12 jam. Variasi waktu alkalisasi adalah 4, 12, 24, dan 40 jam dengan pencucian aquades. Komposit dicetak menggunakan metode cold press dengan fraksi volume serat 20% dan tekanan 125 kg/cm2 ditahan selama 1 jam. Pengujian tarik dengan ASTM D3379-75, uji bending dengan ASTM D790-03 dan analisa morfologi serat menggunakan mikroskop optik dilakukan dalam penelitian ini. Pencucian serat sisal dengan aquades menghasilkan kekuatan tarik serat tunggal sebesar 4,87 MPa sedangkan pencucian serat menggunakan detergen sebesar 4,38 MPa dan serat yang direbus sebesar 4,00 MPa. Komposit dengan serat dicuci aquades memiliki kekuatan dan modulus bending tertinggi sebesar 136,602 MPa, dan 341,810 MPa sedangkan nilai regangannya terendah sebesar 0,117. Semakin lama perlakuan alkali akan menurunkan nilai kekuatan dan modulus elastisitas sedangkan reganganmya naik. Perlakuan 4 jam alkali, memiliki kekuatan sebesar 132,534 MPa, modulus bending 356,941 MPa, dan regangan 0,117. Struktur serat yang dicuci aquades tetap utuh sedangkan yang dicuci detergen dan direbus terjadi kerusakan. Semakin lama perlakuan alkali menyebabkan lignin terkikis sehingga ikatan serat menjadi lemah.Research on natural fiber composites to increase mechanical strength has been carried out, one of which is modifying the fiber surface. The purpose of this study was to determine the effect of washing the fibers before the alkalization process and the alkalization time on the bending properties of sisal fiber / PMMA composites. Sisal fibers were treated before being molded into a composite by washing with distilled water, detergent, and boiling until boiling followed by alkaline treatment (6% NaOH) for 12 hours. The variations in alkalization time were 4, 12, 24, and 40 hours with distilled water washing. The composites were molded using a cold press method with a fiber volume fraction of 20% and a pressure of 125 kg / cm2 held for 1 hour. Tensile testing with ASTM D3379-75, bending test with ASTM D790-03 and fiber morphological analysis using an optical microscope were carried out in this study. Washing sisal fibers with distilled water produces a single fiber tensile strength of 4.87 MPa, while washing the fibers using detergent is 4.38 MPa and boiled fiber is 4.00 MPa. Composites with distilled water washed fibers had the highest strength and bending modulus of 136.602 MPa and 341.810 MPa, while the lowest strain value was 0.117. The longer the alkaline treatment will decrease the strength and elastic modulus values while the strain increases. The 4 hours treatment is alkaline, has a strength of 132.534 MPa, bending modulus of 356.941 MPa, and strain of 0.117. The structure of the fibers washed with distilled water remains intact, while those washed with detergent and boiled are damaged. The longer the alkaline treatment causes the lignin to be eroded so that the fiber bonds become weak.
Analisa Perbandingan Efisiensi Sistem Struktur Pelat-Balok dengan Sistem Struktur Flat Slab-Drop Panel pada Proyek Jogja Apartment Harsoyo, Yoga Aprianto; Nurfiansyah, Ervan
Semesta Teknika Vol 23, No 1 (2020): MEI 2020
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sistem struktur dalam dunia konstruksi bangunan gedung bertingkat memiliki banyak metode dan system struktur oleh karena itu perencana harus memilih sistem struktur yang sesuai dengan kebutuhannya. Pada proyek Jogja Apartment digunakan sistem flat slab-drop panel, sistem pelat tersebut masih jarang digunakan dalam perancanaan gedung. Penelitian ini dilakukan untuk membandingkan antara sistem flat slab-drop panel dan sistem pelat-balok yang ditinjau dari segi biaya pelaksanaan, waktu pelaksanaan, dan desain strukturnya. Penelitian dilakukan dengan cara mendesain ulang satu denah pelat gedung Jogja Apartment dengan menggunakan sistem flat slab-drop panel dan sistem pelat-balok dengan metode dan pembebanan yang sama. Metode yang digunakan dalam mendesain kedua sistem pelat tersebut adalah metode desain langsung dengan peraturan SNI 03-2847-2013 sebagai dasar perhitungannya. Dari hasil penelitian didapat bahwa sistem flat slab-drop panel memiliki biaya sebesar Rp3.552.429.292 lebih murah 24,52% dibandingkan menggunakan sistem pelat-balok sebesar Rp4.706.334.233. Untuk waktu pelaksanaan sistem flat slab-drop panel memiliki waktu lebih cepat 2 hari dibandingkan dengan sistem pelat-balok. Sistem flat slab-drop panel memiliki tinggi ruang bebas yang lebih tinggi dibandingkan dengan sistem pelat-balokMany types of structural systems in the construction world of a multi-storey building make planners choose a structural system that suits their needs. Jogja Apartment project used a flat slab-drop panel system. It is rarely used in building planning so this study conducted to compare the flat slab-drop panel system and the plate-beam system in terms of implementation costs, implementation time, and structural design. The study was conducted by redesigning one plate layout of the Jogja Apartment building by using the flat slab-drop panel system and the plate-beam system using the same method and loading. The method used in designing the two plate systems is a direct design method based on SNI 03-2847-2013. This study found that the flat slab-drop panel system has a cost of Rp 3.552.429.292, it is 24,52% cheaper than using a plate-beam system (Rp 4.706.334.233). The flat slab-drop panel has a faster time of 2 days to build compared to the plate-beam system in the implementation time. The flat slab-drop panel system has a higher free space compared to the plate-beam system in structural design.
Evaluasi Pengelolaan, Pengawasan dan Pengendalian Sistem Proteksi Kebakaran pada Gedung di Universitas Muhammadiyah Yogyakarta Saugani, Muh Sofyan; Saleh, Fadillawaty; Prayuda, Hakas; Tiyani, Lilis; Al Zakina, Bella Lutfiani
Semesta Teknika Vol 23, No 2 (2020): NOVEMBER 2020
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.v23i2.11917

Abstract

Sistem proteksi kebakaran pada bangunan gedung haruslah dikelola, supervisi dan control dengan baik untuk menghindari bencana yang membahayakan. Pemenuhan dan penyesuaian sistem proteksi kebakaran terhadap syarat dan ketentuan yang berlaku diperlukan untuk mengelola, memantau, dan mengendalikan sistem dengan baik. Gedung kampus Universitas Muhammadiyah Yogyakarta (UMY) berpotensi mengalami kebakaran, karena terdapat material yang mudah terbakar dan komponen penyebab kebakaran, sehingga perlu dilakukan pengkajian terhadap sistem proteksi kebakaran yaitu pada pengelolaan, pengawasan, dan pengendalian sistem proteksi kebakaran di gedung. Penelitian ini dilakukan untuk menindaklanjuti hal tersebut. Jenis penelitian yang digunakan adalah jenis penelitian pendekatan kuantitatif data penelitian diperoleh dari hasil penilaian gedung dan wawancara pemilik/pengelola gedung. Hasil yang diperoleh dari penelitian ini adalah tingkat keandalan pengelolaan, pengawasan, dan pengendalian sistem proteksi pada Gedung E6, E7, Pascasarjana dan F3 di UMY. Analisis yang dilakukan memberikan persentase masing-masing 59,52%, (E6 dan E7), 58,03% (Pascasarjana), dan 56,80% (F3) dalam hal pengelolaan dan tingkat keandalannya kurang, sedangkan dari segi pengawasan dan identifikasi masing-masing gedung mendapat persentase yang sama sebesar 69,07% dan tingkat reliabilitas cukup. Hasil ini dapat disimpulkan bahwa tingkat keandalan sistem proteksi kebakaran masih banyak yang berada dibawah 60% sehingga dikategorikan kurang baik.Fire protection systems in buildings must be managed, supervised, and controlled properly to avoid the risk of disaster. Fulfillment and adjustment to the fire protection system against applicable terms and conditions is required to manage, monitor, and control the system properly. The campus building of Universitas Muhammadiyah Yogyakarta (UMY) has the potential to experience fire, because it there are combustible materials and fire-causing components, so it is necessary to do an assessment on fire protection system that is on the management, supervision, and control of fire protection system in the building. This research is done to follow up the matter. Research type used in this research is with quantitative approach, research data obtained from result of building assessment and interview owner/manager of building. The results obtained from this research are the level of reliability of management, supervision, and control of protection system in Building E6, E7, Postgraduates and F3 at UMY. The analysis performed gives the percentage respectively 59.52% (E6 and E7), 58.03% (Postgraduates), and 56.80% (F3) in terms of management and the reliability level is deficient, while in terms of supervision and identification of each building gets the same percentage of 69.07% and the reliability level is sufficient. Based on the results, it can be concluded that the level of reliability on fire protection management still below 60% or in poor condition.  

Filter by Year

2005 2024


Filter By Issues
All Issue Vol. 27 No. 2 (2024): NOVEMBER Vol 27, No 1 (2024): MEI Vol 26, No 2 (2023): NOVEMBER Vol 26, No 1 (2023): MEI Vol 25, No 2 (2022): NOVEMBER 2022 Vol 25, No 1 (2022): MEI 2022 Vol 24, No 2 (2021): NOVEMBER 2021 Vol 24, No 1 (2021): MEI 2021 Vol 24, No 2 (2021): NOVEMBER Vol 23, No 2 (2020): NOVEMBER 2020 Vol 23, No 1 (2020): MEI 2020 Vol 22, No 2 (2019): NOVEMBER 2019 Vol 22, No 1 (2019): MEI 2019 Vol 21, No 2 (2018): NOVEMBER 2018 Vol 21, No 2 (2018): NOVEMBER 2018 Vol 21, No 1 (2018): MEI 2018 Vol 20, No 2 (2017): NOVEMBER 2017 Vol 20, No 2 (2017): NOVEMBER 2017 Vol 20, No 1 (2017): MEI 2017 Vol 20, No 1 (2017): MEI 2017 Vol 19, No 2 (2016): NOVEMBER 2016 Vol 19, No 2 (2016): NOVEMBER 2016 Vol 19, No 1 (2016): MEI 2016 Vol 19, No 1 (2016): MEI 2016 Vol 18, No 2 (2015): NOVEMBER 2015 Vol 18, No 2 (2015): NOVEMBER 2015 Vol 18, No 1 (2015): MEI 2015 Vol 18, No 1 (2015): MEI 2015 Vol 17, No 2 (2014): NOVEMBER 2014 Vol 17, No 2 (2014): NOVEMBER 2014 Vol 17, No 1 (2014): MEI 2014 Vol 17, No 1 (2014): MEI 2014 Vol 16, No 2 (2013): NOVEMBER 2013 Vol 16, No 2 (2013): NOVEMBER 2013 Vol 16, No 1 (2013): MEI 2013 Vol 16, No 1 (2013): MEI 2013 Vol 15, No 2 (2012): NOVEMBER 2012 Vol 15, No 2 (2012): NOVEMBER 2012 Vol 15, No 1 (2012): MEI 2012 Vol 15, No 1 (2012): MEI 2012 Vol 14, No 2 (2011): NOVEMBER 2011 Vol 14, No 2 (2011): NOVEMBER 2011 Vol 14, No 1 (2011): MEI 2011 Vol 14, No 1 (2011): MEI 2011 Vol 13, No 2 (2010): NOVEMBER 2010 Vol 13, No 2 (2010): NOVEMBER 2010 Vol 13, No 1 (2010): MEI 2010 Vol 13, No 1 (2010): MEI 2010 Vol 12, No 2 (2009): NOVEMBER 2009 Vol 12, No 2 (2009): NOVEMBER 2009 Vol 12, No 1 (2009): MEI 2009 Vol 12, No 1 (2009): MEI 2009 Vol 11, No 2 (2008): NOVEMBER 2008 Vol 11, No 2 (2008): NOVEMBER 2008 Vol 11, No 1 (2008): MEI 2008 Vol 11, No 1 (2008): MEI 2008 Vol 10, No 2 (2007): NOVEMBER 2007 Vol 10, No 2 (2007): NOVEMBER 2007 Vol 10, No 1 (2007): MEI 2007 Vol 10, No 1 (2007): MEI 2007 Vol 9, No 2 (2006): NOVEMBER 2006 Vol 9, No 2 (2006): NOVEMBER 2006 Vol 9, No 1 (2006): MEI 2006 Vol 9, No 1 (2006): MEI 2006 Vol 8, No 2 (2005): NOVEMBER 2005 Vol 8, No 2 (2005): NOVEMBER 2005 Vol 8, No 1 (2005): MEI 2005 Vol 8, No 1 (2005): MEI 2005 More Issue