cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surakarta,
Jawa tengah
INDONESIA
Jurnal Ilmiah Teknik Industri
ISSN : 14126869     EISSN : 24604038     DOI : -
Core Subject : Engineering,
Jurnal Ilmiah Teknik Industri is a scientific journal that aims to participate in developing the scientific field of Industrial Engineering, contains the results of research and theoretical study from lecturers, researchers and industry practitioners. Jurnal Ilmiah Teknik Industri is administered by the Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta and published by the Muhammadiyah University Press (MUP).
Arjuna Subject : -
Articles 30 Documents
Search results for , issue "Vol. 15, No. 1, Juni 2016" : 30 Documents clear
Perancangan dan Pengukuran Kinerja Program Inisiatif Perspektif Proses Bisnis Internal Qurtubi, Qurtubi
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper discusses the design and performance measurement initiative internal business process perspective balanced scorecard, a case study at CV. Fateha Compunet, a company engaged in the trade of computers and official equipments. Research carried out by identifying a problem with the method of observation, formulating business process problems that lead to complaints, collecting primary data and secondary data such as key performance indicators and other supporting data. Survey methods used in the study is the importance analysis. In this technique, the respondents were asked to rank various attributes of a subprogram initiative is based on the degree of importance of each of these attributes. The results showed that based on the monitoring and evaluation of programs key performance indicator value initiatives classified as well so that the target company would potentially be achieved.
Application of FTA and SPAR-H Method to Control Work Accident at PG. Krebet Baru Wijaya, Yedija Prasetya; Noya, Sunday Alexander Theophilus
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research is conducted because a high number of accidents occured during the workplace in PG. Krebet Baru. There were about 45 accidentsin 2013 and 32 out of 45 accidentscame from the Maintenance Division.  This research is needed for the purpose of decreasing the number of accidents. The methods used in this research are hierarchycal task analysis (HTA), standarized plant risk analysishuman reliability assessment (SPAR-H), and fault tree analysis (FTA). In this research, there are 4 stations. They are milling station, purification, maturation, and spinning. Based on this research, there are 5 accidents. They are damaged muscle, damaged bone, graze, damaged eye, and injuries from a fall. Based on this research, it can be concluded that the workplace conditions and the lack of worker awareness on the importance of protective equipment usage are the main causes of these work accidents. Based on these causes, the suitable solution is to change several work methods and instruct the workers about using protective equipment.
Aplikasi Analytical Hierarchy Process Pada Pemilihan Metode Analisis Zat Organik Dalam Air Rimantho, Dino; Rachel, Marrie; Cahyadi, Bambang; Kurniawan, Yan
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Water is one of the food products analyzed in water chemistry and environmental laboratories. One of the parameters analyzed are organic substances. The number of samples that were not comparable with the analytical skills can cause delays in test results. Analytical Hierarchy Process applied to evaluate the analytical methods used. Alternative methods tested include titrimetric method, spectrophotometry, and total organic carbon (TOC). Respondents consisted of deputy technical manager, laboratory coordinator, and two senior analysts. Alternative results obtained are methods of TOC. Proposed improvements alternative analytical method based on the results obtained, the method of the TOC with a 10-15 minute analysis time and use of CRM to the validity of the analysis results.
Penentuan Permintaan dan Nilai Tambah Produk Industri Kreatif Pada Pasar Lokal Dwiputranti, Made Irma; Oktora, Andriyani; Permadi, Dodi
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Recently, creative industries growth significantly. However, this growth is still constrained by various factors, one of which is the funding. This aspect has not been solved well although there has full government support. This is due among other things: 1) there is no form of financing schemes in accordance with the creative industries; 2) the amount of commitments lending by financial institutions is not adequate. 3) have not been socialized and performing well. This constraint requires more detailed analysis of the aspects most and very influential on the growth of the creative industries. This research was conducted through analysis of the logical framework approach as well as industrial cluster approach to the object in the fashion and design , which is well established in Bandung. Outcomes were include: 1) identification of critical success factors (CSF) in small industry based on the demand and the potential of the locality; 2) the mapping capitalization model of stimulus and treatment of the CSF; 3) analysis of products value-added based on demand and market; 4) analysis of capital policy for the creative industry.
Optimisasi Waktu Tempuh Pada Multi-AGV Menggunakan Particle Swarm Optimization Pamosoaji, Anugrah Kusumo
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

An algorithm for velocity planning on a continuous-curvature path of a pair of automated guided vehicles (AGVs) that minimizing its travelling time is presented. A class of 3-degree Bezier curves is used as basic form of the path. In addition, constraints of maximum allowable linear and radial accelerations are considered. The velocity plan algorithm is generated based on the characteristics of the path’s control points and maximum allowable radial velocity on some the path’s points. A set of properties of the allowable radial velocity is discussed. The verification of the new algorithm is revealed in the simulation results.
Kriteria Yang Berpengaruh Dalam Penilaian Kinerja Karyawan Menggunakan Anaytical Hierarchy Process Hariyanto, Krisnadhi; Satoto, Eko Budi
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Employee performance is the result of work that is achieved or the results that have been done or worked by an employee within the chores that are charged to the employee. The problem is a priority weighting of the factors and sub factors to get the solution in advance in accordance with the order of priority. In this study the data collected is done by direct observation, interviews, questionnaires and literature. The data are processed to determine the priority weight of the components that affect employee performance. From the calculation by AHP method can be obtained by order of priority as follows: The first is the human resources with priority weight 0.558. The second is working environmental conditions with priority weight 0.312. Last is managerial with priority weight 0.131. Thus the factors that require attention and consideration of the company to increase work performance is a factor of human resource with the greatest priority weight.
Penentuan Lot Size Pemesanan Bahan Baku Dengan Batasan Kapasitas Gudang Utama, Dana Marsetiya
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper explains the problem of determining the lot size of ordering raw materials with warehouse capacity limitation in order to minimize inventory costs. Generally, the lot size of ordering raw materials determined without considering warehouse capacity. The algorithm that used is Wagner Within (WW) which is modified by adding a warehouse capacity as a constraint. The result shows the minimum of total inventory cost is 24,100 and the ordering raw materials at the week 3, 5 and 7.
Pengukuran Kinerja Perpustakaan Dengan Pendekatan Balanced Scorecard Devani, Vera
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research aims to investigate, identify and describe the performance level and the factor which impacts to the performance of the Perpustakaan Tun Seri Lanang (PTSL) using Balanced Scorecard approach. The descriptive analysis was used to proceed data on 4 perspectives, were financial, customer, internal business process and learning and growth, respestively. The questionnaires were distributed to 24 employees and 120 questionnaires were distributed to customers. The finding shosw that performance level of PTSL is in good category by the total score 41.75. Performance level of another perspective shows financial performance is very good by the total score 9, customer performance is good by the total score 3.62, internal business process performance is very good by the total score 8.79 and learning and growth performance is good by the total score the 19.34. Based on findings recommendation is formulated in order that PTSL should focus on employee productivity and customer satisfaction.
Simulasi Model Sistem Kerja Pada Departemen Injection Untuk Meminimasi Waktu Work-In-Process Riyanto, Ong Andre Wahyu
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The smooth process of manufacturing and production requires the operating machine in good condition. If the machine breakdown happened then the production process will be stopped, the production target was not achieved, due date can not be met. So that the costumer will become dissatisfied, and so on. The purpose of this study is to evaluate the work system of the injection department. Also reduce the waiting time for repair the broken machine at existing production system. This study propose the method of modeling and simulation for examine the working system object using the simulation software of Arena. Based on the experiment, it can be seen that the simulation model repair in scenario 1 give impact on the level of activity of technicians up to 20.2% without any reduction in processing time. From the simulation model, the scenario 2 give  impact of changes in the levels of technicians  activity decline by 5.56% and can decrease the processing time up to 8.33%.
Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing Utama, Dana Marsetiya; Dewi, Shanty Kusuma; Mawarti, Veronika Indah
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).

Page 1 of 3 | Total Record : 30


Filter by Year

2016 2016


Filter By Issues
All Issue Vol. 22, No. 2, December 2023 Vol. 22, No. 1, June 2023 Vol. 21, No. 2, December 2022 Vol. 21, No. 1, June 2022 Vol. 20, No. 2, December 2021 Vol. 20, No. 1, June 2021 Vol. 19, No. 02, December 2020 Vol. 19, No. 1, June 2020 Vol. 18, No. 2, Desember 2019 Vol. 18, No. 1, Juni 2019 Vol. 18, No. 1, Juni 2019 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 2, Desember 2018 Vol. 17, No. 1, Juni 2018 Vol. 17, No. 1, Juni 2018 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 2, Desember 2017 Vol. 16, No. 1, Juni 2017 Vol. 16, No. 1, Juni 2017 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 2, Desember 2016 Vol. 15, No. 1, Juni 2016 Vol. 15, No. 1, Juni 2016 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 2, Desember 2015 Vol. 14, No. 1, Juni 2015 Vol. 14, No. 1, Juni 2015 Vol. 13, No.2, Desember 2014 Vol. 13, No.2, Desember 2014 Vol. 13, No. 1, Juni 2014 Vol. 13, No. 1, Juni 2014 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 2, Desember 2013 Vol. 12, No. 1, Juni 2013 Vol. 12, No. 1, Juni 2013 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 2, Desember 2012 Vol. 11, No. 1, Juni 2012 Vol. 11, No. 1, Juni 2012 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 2, Desember 2011 Vol. 10, No. 1, Juni 2011 Vol. 10, No. 1, Juni 2011 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 2, Desember 2007 Vol. 6, No. 1, Agustus 2007 Vol. 6, No. 1, Agustus 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 3, April 2007 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 2, Desember 2006 Vol. 5, No. 1, Agustus 2006 Vol. 5, No. 1, Agustus 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 3, April 2006 Vol. 4, No. 2, Desember 2005 Vol. 4, No. 2, Desember 2005 Vol. 4, No.1, Agustus 2005 Vol. 4, No.1, Agustus 2005 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 2, Desember 2004 Vol. 3, No. 1, Agustus 2004 Vol. 3, No. 1, Agustus 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 3, April 2004 Vol. 2, No. 2, Desember 2003 Vol. 2, No. 2, Desember 2003 Vol. 1, No. 3, April 2003 Vol. 1, No. 3, April 2003 More Issue