Claim Missing Document
Check
Articles

Found 2 Documents
Search

AKSI PEDULI KEMANUSIAAN PENYALURAN BANTUAN SEMBAKO KEPADAKORBAN BANJIR DUSUN GEMPOL RAWA KELURAHAN TANJUNGPURAKECAMATAN KARAWANG BARAT KABUPATEN KARAWANG Asep Darojatul Romli; Afif Hakim; Aang Solahudin Anwar; Mitra Sasmita; Ajat Sudrajat; Meila Hasanah Amri; Taryadi; Dede Sukendar; Haerudin
JURNAL BUANA PENGABDIAN Vol. 8 No. 1 (2026): JURNAL BUANA PENGABDIAN
Publisher : Lembaga Penelitian dan Pengabdian Kepada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/mq6xqh58

Abstract

Aksi peduli kemanusiaan ini merupakan kegiatan sosial yang bertujuan untuk membantu masyarakat terdampak banjir di Dusun Gempol Rawa, Kelurahan Tanjungpura, Kecamatan Karawang Barat, Kabupaten Karawang. Banjir yang terjadi menyebabkan terganggunya aktivitas warga serta menimbulkan kebutuhan mendesak akan bahan pangan pokok. Oleh karena itu, dilakukan penyaluran bantuan sembako sebagai bentuk kepedulian dan solidaritas terhadap korban bencana. Kegiatan ini meliputi proses pengumpulan bantuan, pendistribusian sembako secara langsung kepada warga terdampak, serta koordinasi dengan pihak setempat agar bantuan tepat sasaran. Melalui kegiatan ini diharapkan dapat meringankan beban masyarakat, memenuhi kebutuhan dasar sementara, serta memperkuat semangat gotong royong dan kepedulian sosial di tengah situasi bencana.
Analisis Efisiensi Kerja Teknisi Maintenance AC Menggunakan Metode Full-Time Equivalent (FTE) dan Time Motion Study Dede Sukendar; Nana Rahdiana; Hilda Tri Yulianti
Jurnal Teknik Mesin, Industri, Elektro dan Informatika Vol. 5 No. 3 (2026): Jurnal Teknik Mesin, Industri, Elektro dan Informatika
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jtmei.v5i3.6446

Abstract

Air conditioning system maintenance is a vital activity to maintain the reliability of production facilities in the manufacturing industry. This study aims to evaluate and balance the workload of eight AC Maintenance technicians operating in tandem in four different work areas. Field observations were conducted using the Stopwatch Time Study approach with the shadowing method to measure the actual work duration, then analyzed using the Full-Time Equivalent (FTE) method. The initial evaluation results showed a significant workload imbalance between operators; two operators in Area 2 (Finishing Area) experienced overload with an average FTE index of 1.49 (149%), while two operators in Area 3 (Cast Coated Area) were underloaded with an average FTE of 0.92 (92%). Through repair simulation scenarios focused on eliminating waste and standardizing standard time per AC unit, activity duration inefficiencies were successfully reduced. Reducing wasted time by 6,452 minutes/month in Area 2 and absorbing the schedule overflow to Area 3 resulted in the normalization of all work areas to inload status (FTE 1.10-1.17). The underload conditions that emerged in Area 1 and Area 3 post-optimization were not directed at reducing the workforce, but rather were optimized through a job enlargement strategy in the form of routine 5S inspection activities, completing preventive maintenance checklists, and cross-area support functions. This study proves that workload balancing based on real-time data is able to produce optimal and balanced manpower allocation without adding or reducing personnel.