Claim Missing Document
Check
Articles

Found 18 Documents
Search
Journal : MINERAL

Evaluasi Realiasi Bijih Timah TB 1.42 PT Timah (Persero) Tbk Di Pemali Kabupaten Bangka: Evaluation Of Tin Ore Product Realization In TB 1.42 PT Timah (Persero) Tbk Of Pemali Bangka Regency Epi, Epi; Mardiah, Mardiah; Irvani, Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v3i1.1577

Abstract

TB 1.42 Pemaliwas managed PT Timah (Persero) Tbk. The mining system applied at TB 1.42 Pemali is a mechanical mining system where the mining system activities are conducted by transferring the excavation result of kaksa from work front to stockpile to be wasted using a jig. In terms of mining productivity, the realization of tin ore production was only 80% from the total production that has been planned by the company on November and Desember. Therefore, an evaluation of factors effecting prodution target is essential to do in order to meet unachieved production target. The research was conducted based on the performance coefficient value of load-haluage and transport equipment productivity in November and December assessed from the productivity of the excavators, loaders, and transforting vehicles in March, which is assumed to have the same condition as that in November adn December. An evaluation was conducted to examine the values of mine, effective usage of working time, and the number of bucket loading. The data is then processed using mechanical eatrhmoving formula.The value of performance coefficientin November and December were 0.9 and 0.8, while the performance coefficient of the company are 1.1 – 1.2. After conducting an evaluation, it is found that the factors that lead to failure in achieving the target of production are the long cycle time of the load-haulage equipment, low efficiency of labor, and low match factors. The efforts that should be taken to increase the realization of target achievement are decreasing the cycle time of the load-haulage, increasing the effective usage of working time, and addin in match factor. The cycle time is shortened to 1.159,5 seconds from the initial cycle time of 1.267,8 seconds. The effective usage of working time is increased to 0.75% from 0.727% and the number of load-haulage is increased to 6 from 4 units. After the changes have been done, the production realization in November and December increasing to 156.21 tons of Sn and 128.59 tons of Sn with performance coefficient value of 1.2, thus the production target of the company is achieved.
Perencanaan Kebutuhan Alat Gali-Muat dan Angkut dengan Kapasitas Ore Getting 200 m3/jam pada Rencana Penambangan PT Timah (Persero) Tbk: Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 m3/hr on Mine Plan at PT Timah (Persero) Tbk Nurhadi, Rajandra; Guskarnali, Guskarnali; Irvani, Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v3i1.1579

Abstract

PT Timah (Persero) Tbk is a company engaged in mining especially tin. Tin is one of the most important deposits in the development of world technology. PT Timah (Persero) Tbk has an important role in the procurement of tin in the world. In mining, the mine planning stage is very important before the exploitation stage. At the planning stage of a mine will be planned in such a way as to obtain optimal results. One of the stages of mine planning is the planning of the required load equipment and haul equipment. PT Timah (Persero) Tbk plans to open a mine with open pit system that is using mechanical equipment in Mining Permit Area of West Bangka Regency, Bangka Belitung Islands Province. The mine plan has an ore-gain capacity of 200 m3/hour, requiring the planning of load and haul equipment to meet the ore getting capacity and stripping of overburden and haul geometry in general. Based on the factors that exist in the mine, the load equipment used is the excavator and haul equipment used is Articulared Dumpt Truck. By taking the cycle time as a reference and then converted by the distance of overburden stripping and ore getting activity every year, then can be known the productivity of equipment and the amount of equipment required each activity every year. The number of equipment required is at least 1 load equipment and 4 haul equipment, while the most are 4 load equipment and 13 haul equipment. The geometry of the haul road based on the specification of the haul equipment at the location of the plan has the width of the haul road on a 12 meter straight road, the haul road width at 21 meters, and the 9,1 meter bend radius
Perhitungan Sumberdaya Batu Granit Pada Quarry PT Mandiri Karya Makmur Dengan Metode Cross Section dan Metode Cut And Fill: Calculation of Granit Stone Resource In Quarry PT Mandiri Karya Makmur With Cross Section And Cut And Fill Method Zuhirmanto, Zuhirmanto; Mardiah, Mardiah; Irvani, Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v3i1.1580

Abstract

Resource calculation studies are an important task in evaluating a mining project. Reserve calculation using the method of cross section and method cut and fill in mining area with extensive Active Block 8 hectares, with elevation limit of mining activity 60 m above sea level. The results of the resource volume of granite using method cross section within the cross section 15, 20 and 25 m is 1.436.967,28 m3, 1.435.887,56 m3 and 1.435.162,056 m3 tonnase 3.736.114,927 tons 3.733.307,656 tons and 3.731.421,345 tons, granite stone resource volume using cut and fill method is 1.437.398,157 m3 with 3.737.235,209 tons tonnage. The results of calculations using the method of cross section with a distance of 15 m smaller cross section 430,877 m3 or 0,03% of the cut and fill method, method of cross section with a distance of 20 m smaller cross section 1.510,597 m3, or 0,11% of the cut and fill method , cross section method with cross-sectional distance 25 m smaller 2.236,101 m3 or 0,16% from method cut and fill. The result of the calculation of the life of mine of PT Mandiri Karya Makmur is based on the calculation of the amount of resources used method cut and fill with a mine life of 31,14 years, cross section method sectional distance of 15 m with a mine life of 31,13 years, cross section method sectional distance of 20 m with a mine life 31,11 years and cross section method of cross- sectional distance of 25 m with mine life of 31,09 years.
Analisis Kestabilan Lereng Menggunakan Metode Slope Mass Rating (SMR) dan Software Geoslope/W 2007 pada Tambang Air Laya Selatan Lokasi Suban Di PT Bukit Asam (Persero) Tbk: Slope Stability Analysis using Slope Mass Rating (SMR) method and Software Geoslope/W 2007 at South Tambang Air Laya Location Suban in PT Bukit Asam (Persero) Tbk Faradibah, Nabila; Apriyanti, Yayuk; Irvani, Irvani
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v1i1.1605

Abstract

PT Bukit Asam (Persero) Tbk was one of the Indonesian State Owned Enterprises which conduct tocoal mining. During the process of coal mining, demolition overburden resulted in a change of forceand also set up new structures and caused differences in stress distribution thereby changing thestrength of the rock mass. This result the mining slope becomes unstable and could cause a lot ofharm, therefore the analysis of slope stability was carried out. This study was conducted todetermine the quality of the rock mass slope based on the value SMR (Slope Mass Rating), directionof failure using the analysis of kinematics by Dips software and Safety Factor value (SF) based onMorgenstern Price method using Software Geoslope / W 2007. The data used in this study includesdata UCS, RQD, spacing of discontinuity, discontinuity conditions, groundwater conditions and data ofdiscontinuity orientation. Data retrieval was divided into 9 scanline slopes. The analysis indicatedquality of the rock mass and degree of slope stability based on the SMR for scanline I, VII and IX werevery good with a very stable condition, Scanline II, III, IV, V, VI and VIII had good quality with a steadyslope conditions. The Possibility of slope failure occured only in several blocks for Scanline II, IV, V, VIand VIII. After the analysis of kinematics for Scanline III, IV and V had directions of failure to ScanlineIII was N 490 E, Scanline IV was N 500 E and Scanline V was N 480 E. Values of Safety Factor (SF)single slopes from 9 scanline was estimated to 3.254 - 44.737 (safe condition) and the overall slope of1.85 to 4.09 (safe condition). It was concluded that overall the existing slope on the location Subanwere in a safe condition for SF value >1.25.
Evaluasi Pengaruh Tie-Up Peledakan Terhadap Getaran Pada Penambangan Batu Granit PT Mandiri Karya Makmur Di Desa Tanjung Gunung Kecamatan Pangkalanbaru: The Evaluation Blasting Tie-Up Effect of Vibration in Granite Rock Mining of PT Mandiri Karya Makmur Tanjung Gunung Village Pangkalanbaru District Lenny, Lenny; Irvani, Irvani; Akuan, Abrianto
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v1i1.1607

Abstract

PT Mandiri Karya Makmur is a private mining company that mine granite rock located in CentralBangka Regency Area.The main activity in extracting granite rock was conducted using blastingmethod. Blasting acitivy could influence invironment around mine site, including community.Therefore, it was necessary to evaluate blasting activity, especially tie-up to decrease vibration fromblasting activity itself. The method used to make design of tie-up was using shotplus-i program. Theaims in this research was to set up surface delay and the use of time window in order to determineamounts of similar blasting holes. The data used including sounding data and blast design todetermine PPV value. The value was calculated by using empirical formula of U.S.B of Mine No 656 of1971. The actual geometry used including burdens 1,8 m, spacing 2,3 m and hole depth rate 6 m.Then, determining the measurement of vibration was using Android based vibrometer. The result ofappropriate tie-up evaluation used in blasting was Box cut pattern, surface delay 25 ms and 42 mswith inisiation of left corner using time window 8 ms and similar blasting holes was 3 holes. Thisamount could minimize vibration. Actual PPV value was 0,7 mm/s, PPV recommendation value of 3,3mm/s and SD value of 19,6 m/kg. The cavacity of explosive was 932 kg and minimum safe distance of598 m from blasting point. It was categorised still safe referring to Building type theory of number 2(SNI 7571 : 2010).
Evaluasi Kinerja Pemindahan Overburden Ditinjau Dari Produktivitas Alat Gali- Muat dan Alat Angkut di Front Kerja 2 TB 2.2 Tempilang Kabupaten Bangka Barat Mitra PT Timah (Persero) Tbk: (Performance Evaluation Of Overburden Removal Reviewed From Load Haulage Equipments and Conveyance Productivity in Work Front 2 of TB 2.2 Tempilang West Bangka Regency of PT Timah (Persero) Tbk’s Partner Fatimah, Desi; Tono, E.P.S.B Taman; Irvani, Irvani
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v1i1.1608

Abstract

TB 2.2 Tempilang is managed by partner of PT Timah (Persero) Tbk. Mining system that applied is asystem of mechanical mine, where mining activities carried out by moving the overburden materialprior to mine kaksa layer. The problem that occurs was the productivity of conveyance on the actualcondition only 98.76% of target had been determined, which led to their failure in overburden removalvolume amounted to 1.24%. Therefore, it was necessary to do an evaluation of the performanceaffecting factors of load haul equipment and conveyance in the field. Evaluation was carried out bycalculating the value of productivity, work efficiency and Match factor. The data required includedcycles time data, effective working time, the amount of bucket loading, the type of overburden materialand haul road geometry. Then the data was processed using the formula of mechanical soil removaland analyzed based on the literature related to the problem. The factors causing productivityconveyance has not reached the target after the evaluation due to low efficiency of work, the leastamount of bulk bucket loading, and the low value of match factors. The Alternatives can be done toimprove the productivity of conveyance is to increase the effective work time, additional of bucket loadhaul equipments and additional of conveyances. Effective work time should be increased from 12.34hours to 14.23 hours, so the work efficiency become 79.03% from 68.58% to the achievement ofproduction is 113.80%. Bulk bucket should be added from 15 times to 20 times, so the productivitybecome 131.68 m3/hour of 98.67 m3/hour. Conveyance which is originally 2 units coupled into 3 units,resulting in a change of match factor equipment performance from 0.69 to 1.04 with the achievementof production is 141.14%.
EVALUASI KEMAMPUAN PRODUKSI RIPPING DOZER RIPPER D375 UNTUK MENCAPAI TARGET PRODUKSI BATUBARA 180.000 TON BULAN OKTOBER DI TAMBANG AIR LAYA EXTENTION TIMUR FRONT LIMOA PT BUKIT ASAM (PERSERO) TBK UPTE: Evaluate Performance Production Of Dozer Ripper D375 To Have Coal Production Target Was 180.000 Ton On Month October In East Extention Of Tambang Air Laya Front Limoa Pt Bukit Asam (Persero) Tbk Upte) Fredrick, Gregorius; Tono, E.P.S.B Taman; Irvani, Irvani
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v1i1.1611

Abstract

Coal production target in East extension of TAL Limoa Front was 180.000 ton/month in October2015 but the target achieved only 115.967,59 ton with the percentage achievement of productiontarget at 64,4 %. Therefore it was necessary to evaluate performance of Dozer Ripper D375 numberseries DZ 521. The evaluation conducted by taking primer actual data in mine site such as cycletime, work distance, work effeciency, Ripper penetration and then the collecting data was processedto make reparations of DZ 521 type of D375 Ripper with the aim to meet the production target. Theachieved production after prior evaluation conducted by increasing work time effeciency was162.826,57 ton with the production achievement percentage at 90.45 % and the lack production was17.173,43 ton, a further evaluation was conducted by repairing of Ripper penetration performance andthe production was 206.138,22 ton with the production achievement percentage at 114% and theexceed production was 26138,22 ton. Then work time efficiency and Ripper penetration was improvedto obtain target production of 289.475,83 ton with the production achievement percentage at 160%and exceed production of 109.475,83 ton with time reserve 150 hours/month and 4,8 hours/daymaybe can back up the problems on location production. The evaluation had been met coalproduction target of Limoa Front.
Interpretasi Material Pada Rancang Bak Ukur Skala Laboratorium Dengan Pendekatan Konfigurasi Wenner, Wenner – Schlumberger dan Dipole-dipole: Material Interpretation in Laboratory Scale Measurement Design Using Wenner, Wenner–Schlumberger and Dipole-dipole Configuration Approaches Guskarnali, Guskarnali; Oktarianty, Haslen; Irvani, Irvani; Tono, E.P.S.B. Taman; Andini, Delita Ega
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Program Studi Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.4958

Abstract

Geoelectric measurements have been carried out using multichannel ResistivityMeter (Geores) tools with Wenner, Wenner-Schlumberger, and Dipole-dipole Configuration approaches on the influence of materials arranged in a laboratory-scale measuring tub design with dimensions of 194x184x80 cm. The measured method is the variation in resistivity value against each trajectory of the material. The method used is the variation of resistivity values for each path of the material that has been arranged in a laboratory scale measuring design. Geoelectric measurements were carried out on 7 lines (5 line in the West-East direction and 2 line in the North-South direction). The spacing between the electrodes of each line is 10 cm with 16 electrodes in one line so that each line has a length of 160 cm or 1.6 m which corresponds to the length and width dimensions of a laboratory scale measuring design. The electrode arrangement parameters are constant with respect to changes in the configuration selected from the geores parameters during geoelectric measurements. The measurement results showed that the identified depth reached 31.2 cm. The low resistivity value category has an interval of 374-4,397 ohm.meters at a depth of 0-12.5 cm, which is the influence of building sand material containing water and soil, while the depth interval is 12.5 - 31.2 cm ohm.meters (material category that is influenced by 2 iron rods, tin tailings sand, granite, gravel) with resistivity values ranging from 12,378–67,498 ohm.meters. From experiments on the influence of the resistivity values of the three Wenner, Wenner-Schlumberger, and Dipole-dipole configurations, it was obtained that the smallest absolute error resistivity value in the Wenner configuration was 5.01% against the overall average absolute error resistivity value of 10.16%.