Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Indonesian Development Economics and Localities

Determinants of Female Bamboo Weaving Craftsmen's Labor Force Participation in Taman Sari Village, Gunung Sari District, West Lombok Regency Abu Rizal Kholid; Gusti Ayu Arini; Ahmad Zaenal Wafik
Indonesian Development Economics and Localities Vol. 1 No. 2 (2025): July-December
Publisher : Future Techno-Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59535/85dnnt15

Abstract

This study aims to analyze wages, work experience, age, marital status and the presence of toddlers as determinants that influence the labor force participation of female bamboo weaving craftsmen in Taman Sari village, Gunung Sari sub-district, West Lombok regency. This type of research is quantitative explanatory. The data in this study are primary data with data collection methods using the census method. The population in this study were 34 female bamboo weaving craftsmen in Taman Sari village. The analysis model used in this study was multiple linear regression. The results of the study showed that the wage variable partially had a significant and positive effect on women's work time, the work experience and marital status variables partially did not have a significant and positive effect on women's work time, the age and presence of toddlers variables partially did not have a significant and negative effect on women's work time. The results of the study simultaneously showed that the variables of wages, work experience, age, marital status and the presence of toddlers together had a positive and significant effect on women's work time. It is hoped that the government can facilitate job training programs so that workers, especially female craftsmen, have specific skills and are motivated to develop their capacity.
The Influence of Education Level, Age and Work Experience on the Productivity of Employee Workforce at the Selaparang District Office, Mataram City Dea Farlingga Feny; Gusti Ayu Arini; Ahmad Zaenal Wafik
Indonesian Development Economics and Localities Vol. 1 No. 2 (2025): July-December
Publisher : Future Techno-Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59535/5hbbe297

Abstract

The purpose of this study was to analyze the effect of education level, age, and work experience on employee work productivity at the Selaparang District Office, Mataram City. The population in this study were all employees at the Selaparang District Office, Mataram City, totaling 31 people, consisting of 20 PNS, 1 PPPK, and 10 Non ASN. This study used the census method as a data collection method, with data collection techniques in the form of questionnaires and literature studies. The analysis techniques used were the Likert scale and Eviews 12 software, with multiple linear regression analysis methods, determination coefficient test (R²), t test (partial), and F test (simultaneous). The results showed that the variables of education level, age, and work experience simultaneously had a significant effect on employee work productivity at the Selaparang District Office, Mataram City. The coefficient of determination (R2) value was 0.62, which means that the three independent variables in the model can explain the variation in work productivity by 62%, while the remaining 38% was influenced by other variables outside this research model.
Analysis of the Influence of Education Level, Age, Marital Status and Gender on Waiting Time for Educated Workers in Mataram City Aswaria Aswaria; Gusti Ayu Arini; Ahmad Zaenal Wafik
Indonesian Development Economics and Localities Vol. 1 No. 2 (2025): July-December
Publisher : Future Techno-Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59535/8jt6kf34

Abstract

The imbalance between the number of workforce and the amount of job opportunities has resulted in the emergence of unemployment problems for educated workers. This study aims to analyze the influence of variables of education level, age, marital status and gender on the waiting time for educated workers in Mataram City. Data collection was carried out by means of questionnaires distributed directly to educated workers who had completed D3 and S1 education in Mataram City to a sample of 100 respondents. The analysis method used in this study is multiple regression analysis. The results of the study indicate that the variable of education level has a negative and significant effect on the waiting time for educated workers in Mataram City. The variables of age and gender have a positive and significant effect on the waiting time for educated workers in Mataram City. The variable of marital status does not have a positive and significant effect on the waiting time for educated workers in Mataram City. The variables of education level, age, marital status and gender together have a positive or negative and significant effect on the waiting time for educated workers in Mataram City.