Claim Missing Document
Check
Articles

Found 11 Documents
Search

Efektivitas Pemanggilan Surat Tercatat dalam Menciptakan Peradilan yang Sederhana, Cepat, dan Biaya Ringan: Pasca Peraturan Mahkamah Agung Nomor 7 Tahun 2022 Dewantoro, Dewantoro
Jurnal Hukum Caraka Justitia Vol. 3 No. 2 (2023)
Publisher : Universitas Proklamasi 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30588/jhcj.v3i2.1684

Abstract

The summons for court summons and notification of court decisions to litigants keep up with the times by keeping up with developments in information and communication technology. The use of registered mail services replaces the role of the bailiff in summoning and notifying the decision. The hope for this change is to create justice that is simple, fast, and low-cost, but in the field, the role of registered mail services is not yet as expected.This research is normative juridical research to find research results that the use of registered mail services has not been effective in helping to create justice that is simple, fast, and low cost. The court needs to carry out socialization, and training in procedural law as well as monitoring and evaluation on cooperation in the use of mail services with PT Pos Indonesia (Persero). Administrative risks can be taken by the interested parties if errors in summons and notification of court decisions and decrees continue to be repeated. 
Analisis Faktor-Faktor yang Mempengaruhi Keterlambatan pada Proyek Konstruksi Jalan di Kota Palangka Raya Yuniarti, Anggraeni Selvia; Dewantoro, Dewantoro; Puspasari, Veronika Happy
Portal: Jurnal Teknik Sipil Vol 16, No 2 (2024): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v16i2.5087

Abstract

Pemerintah telah merencanakan pemindahan Ibu Kota dari Jakarta ke sebuah Kawasan di Kalimantan Timur, yang bisa disebut Ibu Kota Nusantara (IKN). Perpindahan Ibu Kota Nusantara (IKN) tersebut membawa dampak positif dimana akan mendorong investasi di Provinsi tersebut dan sekitarnya. Maka Kota Palangka Raya juga mendapatkan dampak baik dari segi perekonomian maupun dari sektor proyek konstruksi. Saat ini sektor konstruksi di Kota Palangka Raya mengalami peningkatan, yang dapat dilihat dari banyaknya pengadaan paket tender proyek konstruksi, yang bisa dilihat dan terdaftar pada LPSE Kota Palangka Raya, terutama pada paket tender proyek konstruksi jalan. Pembangunan proyek kontruksi jalan sering dilakukan guna meningkatkan kelancaran arus lalulintas. Namun pada pembangunan proyek konstruksi jalan sering mengalami kendala yang mengakibatkan keterlambatan penyelesaian pekerjaan, sehingga waktu penyelesaian pekerjaan tidak sesuai dengan yang telah ditetapkan pada dokumen kontrak kerja. Tujuan dari penelitian ini untuk mengetahui faktor-faktor yang mempengaruhi keterlambatan yang dominan pada proyek konstruksi jalan di Kota Palangka Raya. Data penelitian diperoleh melalui survei penyebaran kuesioner dan wawancara secara langsung ke kontraktor di Kota Palangka Raya yang masih aktif dan terdaftar pada LPSE Kota Palangka Raya. Analisis data dalam penelitian ini menggunakan uji Validitas, uji reliabilitas, dan analisis deskriptif. Berdasarkan analisis faktor terbentuk 28 faktor yang mempengaruhi keterlambatan pada proyek konstruksi jalan di Kota Palangka Raya. Sedangkan faktor dominan yang yang mempengaruhi keterlambatan pada proyek konstruksi jalan di Kota Palangka Raya terdapat 3 faktor yaitu pengaruh cuaca (hujan yang turun berhari-hari), perubahan desain oleh pemilik, dan kondisi lapangan yang berbeda dengan kontrak.
Analisis Kinerja Konsultan Pengawas Konstruksi dalam Pelaksanaan Proyek di Kota Palangka Raya Wulandari, Anggun; Dewantoro, Dewantoro; Puspasari, Veronika Happy
Portal: Jurnal Teknik Sipil Vol 16, No 2 (2024): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v16i2.5086

Abstract

Seiring dengan pesatnya perkembangan konstruksi di Indonesia, peran konsultan pengawas semakin penting dalam menjamin kesuksesan proyek pembangunan. Konsultan pengawas di Kota Palangka Raya harus mampu melakukan tugas pengawasan konstruksi dengan baik, seperti memastikan bahwa proyek dilakukan sesuai dengan spesifikasi, memantau kualitas pekerjaan, memiliki kemampuan manajemen proyek yang baik, dan mampu berkomunikasi dengan baik dengan semua pihak yang terkait dalam proyek. Pada penelitian ini data diperoleh dengan penyebaran kuesioner ke perusahaan konsultan yang terdaftar pada Ikatan Nasional Konsultan Indonesia Provinsi Kalimantan Tengah khususnya berdomisili di Kota Palangka Raya dan studi literatur. Dari penyebaran kuesioner diperoleh sampel sebanyak 41 responden. Analisis data menggunakan Program SPSS untuk mengolah uji validitas instrumen, uji reliabilitas instrumen serta mengetahui nilai Mean dan nilai Standar Deviasi. Penelitian ini bertujuan untuk mengetahui faktor-faktor kinerja konsultan pengawas konstruksi dalam pelaksanaan proyek di Kota Palangka Raya dan untuk mengetahui faktor-faktor dominan kinerja konsultan pengawas konstruksi dalam pelaksanaan proyek di Kota Palangka Raya. Berdasarkan penelitian ini disimpulakan bahwa dari studi literatur yang telah dilakukan diperoleh 30 faktor kinerja konsultan pengawas konstruksi dalam pelaksanaan proyek di Kota Palangka Raya. Hasil penelitian menunjukan bahwa faktor-faktor dominan kinerja konsultan pengawas konstruksi dalam pelaksanaan proyek di Kota Palangka Raya adalah mengendalikan dan memastikan proyek tepat waktu sesuai dengan rencana, melakukan pemeriksaan dan menyatakan kelayakan fungsi bangunan gedung terbangun sesuai dengan PBG, mengendalikan proyek tepat biaya sesuai dengan rencana.
Analisis Pengaruh Kinerja Mandor terhadap Keberhasilan Proyek Konstruksi di Kota Palangka Raya Piotisi, Nadia; Dewantoro, Dewantoro; Puspasari, Veronika Happy; Nuswantoro, Waluyo
Portal: Jurnal Teknik Sipil Vol 16, No 2 (2024): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v16i2.5238

Abstract

Keberhasilan proyek konstruksi merupakan hal yang diharapkan oleh pihak-pihak yang terlibat dalam proyek konstruksi. Untuk mencapai keberhasilan tersebut tidak terlepas dari kinerja  mandor. Dengan mempertimbangkan kualitas proyek, maka kontraktor harus menentukan dan memilih mandor yang memiliki pengetahuan, terampil, berpengalaman serta bertanggung jawab untuk memimpin para pekerja lainnya. Penelitian ini bertujuan untuk menganalisis seberapa besar pengaruh kinerja mandor terhadap keberhasilan proyek konstruksi dan untuk menganalisis apakah kinerja mandor berpengaruh  signifikan secara parsial terhadap keberhasilan proyek konstruksi.hasil analisis menunjukan besarnya pengaruh kinerja mandor sebesar 79,2% dan variabel yang  berpengaruh signifikan secara pasrsial yaitu kemampuan dan pelatihan.Kata Kunci : Mandor, kinerja, proyek konstruksi
DEVELOPMENT OF A WEBSITE-BASED ONLINE LEARNING MODE AS A MEANS OF INCREASING STUDENT INDEPENDENCE IN LEARNING Trisnawati, Trisnawati; Dewantoro, Dewantoro; Mazdiyana, Mazdiyana
JLCEdu (Journal of Learning and Character Education) Vol 2, No 2 (2022): JLCEdu (Journal of Learning and Character Education)
Publisher : STMIK Pringsewu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56327/jlcedu.v2i2.44

Abstract

Now with advances in technology students and teachers alike can learn in the hands of technology. Currently, all countries in the world are facing the Covid-19 pandemic. All activities are restricted to prevent the spread of the Corona virus, including educational activities. In Indonesia, it has been more or less three months, all educational activities, from primary and secondary to tertiary levels, are conducted online. In this research concept, what researchers will do is how to make a website as a learning medium easily and can be understood by students and readers from all walks of life. Features can also be used properly so that students are interested and enthusiastic in independent learning. At the stage of making the website the researcher uses wordpress as a medium for editing the appearance of the theme or other features. So that it really can help researchers in simplifying and accelerating the creation of a website as a learning medium that helps students to learn independently online. At this stage the research model used is the waterfall model. Starting from the level and progress of the system, using this model has a systematic sequential software development method. In developing a website-based online learning mode as a means of increasing student independence in learning, teachers can update subject data, input new subject data, and delete unnecessary data. Subject data whose access time limit has been determined will be deleted by itself at a predetermined time. The teacher only needs to register as a teacher and can immediately become a teacher on the Website-Based Online Learning Mode Development Website as a Means to Increase Student Independence in Learning after passing certain predetermined phases and conditions. After completing teaching and learning activities, users can close the account or Logout from an existing account on the Website. After that, the website can be closed by closing the browser application which is used to open a website-based online learning mode development website as a means of increasing student independence in learning.
Analisis Risiko pada Proyek Konstruksi Perumahan di Kota Palangka Raya Gustian, Gustian; Dewantoro, Dewantoro; Puspasari, Veronika Happy
Portal: Jurnal Teknik Sipil Vol 16, No 2 (2024): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v16i2.5045

Abstract

Peningkatan jumlah penduduk di kota Palangka Raya mengakibatkan proyek pembangunan perumahan juga mengalami peningkatan sehingga berpotensi menimbulkan berbagai jenis risiko. Kegagalan dalam memahami potensi risiko dapat mengakibatkan tidak tercapainya tujuan proyek. Oleh karena itu, analisis risiko penting dilakukan dalam rangka mengurangi dampak risiko. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis risiko-risiko yang paling dominan yang terjadi pada proyek konstruksi perumahan di kota Palangka Raya. Hasil identifikasi risiko menunjukkan bahwa terdapat 45 risiko yang terbagi dalam 11 kategori risiko. Hasil analisis diperoleh 7 risiko yang merupakan risiko dominan pada proyek pembangunan perumahan di kota Palangka Raya, risiko tersebut yaitu: risiko perubahan kebijakan politik pemerintah, birokrasi perijinan, kenaikan harga material, kurangnya kemampuan/keterampilan tenaga kerja, fluktuasi suku bunga kredit bank, kondisi cuaca, dan ketidakstabilan moneter.
AUTENTIKASI ALAT BUKTI ELEKTRONIK DALAM MEMPERLANCAR PEMBUKTIAN DI PERSIDANGAN PADA ERA DISRUPSI Dewantoro, Dewantoro
Jurnal Hukum Progresif Vol 12, No 2 (2024): Volume: 12/Nomor2/Oktober/2024
Publisher : Doctoral of Law Program, Faculty of Law, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/jhp.12.2.135-151

Abstract

Pembuktian di persidangan untuk mencari kebenaran baik materil dan formil tidak sesederhana seperti dahulu lagi. Penggunaan alat bukti elektronik mulai dipergunakan untuk membuktikan fakta-fakta yang rumit, hal ini menjadi dilema bagaimana caranya agar hakim yakin bahwa alat bukti elektronik dapat menjelaskan tentang peristiwa apa yang terjadi sebenarnya, olehkarena itu diperlukan rambu-rambu aturan atau petunjuk teknis agar alat bukti elektronik dapat digunakan dan meyakinkan hakim akan kebenaran suatu peristiwa. Kesimpulan dari penulisan ini pemerintah sudah menyediakan rambu-rambu teknis dan sekarang perlu pengetahuan dan keterampilan masyarakat atau penegak hukum agar dapat mengoperasionalkannya di persidangan dan menghasilkan hasil pembuktian yang autentik dan dapat diterima oleh hakim sebagai bahan pertimbangan pengambilan putusan pengadilan atau penetapan hakim.
Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi pada Program Bantuan Stimulan Perumahan Swadaya (BSPS) (Studi Kasus: Program BSPS di Ponorogo, Jawa Timur) Ridhwan, Muhammad Ariq; Nuswantoro, Waluyo; Dewantoro, Dewantoro
Portal: Jurnal Teknik Sipil Vol 16, No 3 (2024): October Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v16i3.5595

Abstract

Abstrak — Pembangunan infrastruktur, termasuk perumahan, sangat penting bagi kemajuan negara. Di Indonesia, Program Bantuan Stimulan Perumahan Swadaya (BSPS) bertujuan meningkatkan akses perumahan layak bagi masyarakat berpenghasilan rendah. Namun, pelaksanaan proyek sering menghadapi keterlambatan yang berdampak negatif. Penelitian ini menganalisis faktor-faktor penyebab keterlambatan proyek BSPS di Ponorogo, Jawa Timur, dengan tujuan menemukan solusi untuk meningkatkan efisiensi dan kualitas pembangunan rumah swadaya. Pengumpulan data dilakukan melalui kuesioner dan studi literatur, kemudian dianalisis menggunakan program SPSS untuk uji validitas, reliabilitas, analisis deskriptif, dan ranking. Hasil analisis menunjukkan bahwa terdapat enam faktor penyebab yang berpengaruh terhadap keterlambatan, yaitu : Tenaga Kerja (X1), Material (X2), Karakteristik Lokasi Proyek (X3), Keuangan (X5), Waktu dan Kontrol (X6), serta Pengawasan Proyek (X9). Faktor Tenaga Kerja (X1) memiliki pengaruh terbesar dengan nilai mean 3,95, diikuti oleh Faktor Waktu dan Kontrol (X6) dengan nilai mean 3,79 dan Faktor Pengawasan Proyek (X9) dengan nilai mean 3,66.Kata Kunci :  Keterlambatan Konstruksi, Faktor Penyebab, BSPS.
Indonesia Court Performance in Fulfillment the Substantive Justice to the Victims of Human Trafficking Crimes Dewantoro, Dewantoro
CREPIDO Vol 5, No 2 (2023): Jurnal Crepido November 2023
Publisher : Bagian Dasar-Dasar Ilmu Hukum & Hukum dan Masyarakat Fakultas Hukum Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/crepido.5.2.196-206

Abstract

Indonesia is in a state of emergency for the crime of trafficking in persons. The need for employment has caused many Indonesian workers to become victims of human trafficking. The crime of trafficking in persons is a violation of human rights to human freedom to work according to one's own will and not be forced and tortured in doing work. The district court as the executor of judicial power in the field of general crimes plays a role in enforcing the law and providing justice, one of which is by imposing restitution decisions for victims of human crimes. The technical rules for implementing restitution are important so that substantive justice for victims of trafficking in persons can be recovered materially.
Perencanaan Bangunan TPS3R Di Kelurahan Menteng Kota Palangka Raya Ferdy, Muhammad; Dewantoro, Dewantoro; Nuswantoro, Waluyo
Jurnal Basement : Jurnal Teknik Sipil Vol. 3 No. 1 (2025): Jurnal Basement : Jurnal Teknik Sipil
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36873/basement.v3i1.19628

Abstract

Currently, the waste generation in Menteng Subdistrict, Palangka Raya City reaches 30.48 tons per day. This has resulted in waste piling up and scattering at the Temporary Disposal Site (TPS). To address this issue, efforts are needed to sort, process, and reduce waste by providing a Waste Processing Facility for Reduce-Reuse-Recycle (TPS3R). The study was conducted through observations of waste management facilities and an analysis of waste generation and composition data. The design was developed based on the TPS3R Technical Guidelines. The cost estimation was calculated according to the Ministry of Public Works and Housing's Standard Unit Prices (AHSP KemenPUPR) and the local labor and material unit prices. The study produced a design and cost estimate for the construction of TPS3R in Menteng Subdistrict, Palangka Raya City. The TPS3R facility will cover an area of 200 m², consisting of: Sorting, Receiving, and Transporting Residual Waste area: 20 m², Office: 10 m², Storage: 20 m², Processing Area: 100 m², Residual Waste Storage: 10 m², Packaging Area: 30 m², Recyclable Material Storage: 10 m². The estimated construction cost is Rp 799,766,000. A total of three TPS3R buildings are needed to accommodate the waste generation in Menteng Subdistrict, Palangka Raya City