IDENTIFIKASI RISIKO OLEH PENGEMBANG PERUMAHAN DI KOTA BANDA ACEH DAN KABUPATEN ACEH BESAR hidayat, khuzul; Malahayati, Nurul; Bulba, Alfa Taras
Journal of The Civil Engineering Student Vol 3, No 3 (2021): Volume 3, Nomor 3, Desember 2021
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v3i3.18379

Abstract

Peningkatan pembangunan rumah oleh pengembang perumahan di Kota Banda Aceh dan Kabupaten Aceh Besar terus mengalami kenaikan sebelum terjadinya bencana penyebaran pandemi Corona Virus Disease 2019 (COVID-19). Penelitian bertujuan untuk mengidentifikasi risiko-risiko yang dihadapi oleh pengembang perumahan semasa pandemi covid-19 terhadap kerugian biaya, kerugian waktu, dan menurunnya mutu. Teridentifikasi sebanyak 25 variabel risiko yang dilakukan melalui wawancara kepada 4 orang pengembang perumahan. Jumlah responden dalam penelitian ini sebanyak 20 orang pengembang yang akan mengisi kuisioner. Pengujian instrumen dilakukan dengan menggunakan uji validitas dan realibitas. Sedangkan pengolahan data dilakukan dengan analisis deskriptif, dan analisis frequency index (FI), yang dibantu dengan menggunakan software Microsoft Excel. Hasil analisis frekuensi indek menunjukan 5 variabel risiko dominan yang berdampak terhadap kerugian biaya diantaranya calon pembeli menunda pembelian rumah, penurunan penjualan perumahan, biaya tambahan untuk mendatangkan tenaga kerja dari luar daerah, penurunan permintaan rumah, dan minat pembeli kurang. Sebanyak 7 variabel risiko dominan yang berdampak terhadap kerugian waktu diantaranya kurangnya iklan dalam pemasaran sehingga memperlambat penjualan rumah, hambatan terhadap penyediaan material selama pembangunan rumah, keterlambatan pengiriman material ke lapangan, pemasok tidak dapat memenuhi pesanan material. Sebanyak 1 variabel risiko dominan yang berdampak terhadap menurunnya mutu yaitu ketersediaan tenaga kerja yang kurang.
Kajian Tingkat Risiko Kecelakaan Kerja pada Proyek Peningkatan Jalan Peurelak- Lokop – Batas Gayo Lues Menggunakan Metode FMEA Birrabbah, Bilal; Jamil, Muhammad; Bulba, Alfa Taras
Journal of The Civil Engineering Student Vol 6, No 1 (2024): Volume 6 Nomor 1 Maret 2024
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v6i1.27259

Abstract

Proyek konstruksi merupakan suatu kegiatan yang kompleks dan melibatkan banyak pihak yang terlibat dalam pelaksanaannya. Salah satu upaya untuk meningkatkan kualitas pelaksanaan proyek konstruksi adalah dengan menerapkan Sistem Manajemen Keselamatan Konstruksi. Tingkat kecelakaan kerja konstruksi terbilang cukup tinggi maka harus diterapkan Keselelamatan dan Kesehatan Kerja pada proyek konstruksi bertujuan yang untuk meningkatkan keselamatan dan kesehatan kerja di lokasi konstruksi, sehingga dapat mengurangi risiko kecelakaan dan cedera pada pekerja. Penelitian ini bertujuan untuk mengkaji tingkat risiko kecelakaan kerja pada Proyek Peningkatan Jalan Peurelak Lokop – Batas Gayo Lues  dan menentukan pekerjaan dengan tingkat risiko kecelakaan tertinggi. Metode yang digunakan dalam penelitian ini adalah survei melalui kuesioner, menggunakan sumber data primer dan sekunder. Kuesioner disusun berdasarkan variabel yang terkait dengan penerapan K3. Pengolahan data kuisioner dilakukan dengan menggunakan presentase skala Likert, sedangkan pengolahan data wawancara dilakukan dengan menggunakan metode FMEA ( Failure Mode Effect Analysis ). Hasil yang didapat dari penelitian ini variabel yang paling dominan yaitu variabel operasional dengan skor rata-rata sebesar 89.85%, dan nilai RPN (Risk Priority Number) dari 8 kecelakaan kerja yang berpotensi terjadi didapat pekerjaan pengangkutan material yang memiliki risiko kecelakaan kerja tertinggi yaitu dengan nilai RPN sebanyak 90,64.
ANALYSIS OF THE EFFECTIVENESS OF HSE PLAN ON WORK ACCIDENT CONTROL IN STRUCTURAL WORK AT BSI BANDA ACEH LANDMARK BUILDING CONSTRUCTION PROJECT Rusda, Ikhsan; Abbas, Ibnu; Bulba, Alfa Taras
Journal of The Civil Engineering Student Vol 6, No 4 (2024): Volume 6 Nonor 4 Desember 2024
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v6i4.30746

Abstract

Statistically, work accidents show a significant increase. The Social Security Organizing Agency (BPJS) Employment noted that the number of work accidents continues to increase by 5.65% every year. The purpose of this study is, and find out how the relationship between the effectiveness of HSE plan and risk control on the rate of work accidents. This study used a hypothesis test method, data collection was carried out using questionnaires to respondents of related parties. The closeness of the relationship between the two is included in the very strong (perfect) category, with a Pearson correlation value of 0.884. And it has a positive relationship which means that the higher the level of effectiveness of the HSE plan, the higher the level of work accident control. While the results of the coefficient of determination were obtained that the effectiveness of the HSE Plan affected the control of work accidents by 77.5%, while 22.5% of other things, the results of the hypothesis test simultaneously calculated table with a sig value of 0.05 and tcalculate ttable with a sig value of 0.05. This states that H0 is accepted and Ha is rejected, which means that there is an effect of the effectiveness of the HSE plan on simultaneous and partial control of work accidents. It can be concluded that the effectiveness of HSE Plan has a relationship and influence on work accident control. And it is expected that the next researcher will vary additional variables to be able to get an influence result of more than 80%.
Analisis Faktor Kritis Yang Mempengaruhi Kesuksesan Pada Pelaksanaan Proyek Konstruksi Jalan Di Desa Blang Gapu-Blang Iboih-Lhok Duek Kabupaten Pidie Jaya Bakti, Muhammad Afdhal; Maulina, febriyanti; Bulba, Alfa Taras; Saiful, Khairunnisa Putritami
Journal of The Civil Engineering Student Vol 7, No 2 (2025): Volume 7 Nomor 2 Juni 2025
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v7i2.29104

Abstract

Pidie Jaya adalah salah satu kabupaten yang sedang berkembang di Provinsi Aceh. Infrastruktur jalan menjadi salah satu sektor utama yang dikembangkan di daerah tersebut dimana sudah menjadi prioritas utama bagi pemerintah guna mempercepat pembangunan ekonomi daerah atau regional tertentu. Jalan berfungsi sebagai infrastruktur transportasi tunggal dimana menghubungkan antara wilayah tertentu dengan wilayah lainnya sehingga dibutuhkan peningkatan dalam bidang konstruksi jalan untuk menumbuhkan perekonomian warga setempat. Salah satu proyeknya yaitu peningkatan jalan baru yang berlokasi di Desa Blang Gapu - Blang Iboih - Lhok Duek, Kecamatan Bandar Baru, Kabupaten Pidie Jaya. Tentunya dalam membangun proyek konstruksi jalan banyak permasalah-permasalahan yang akan dihadapi. Maka penelitian ini bertujuan agar dapat menentukan faktor kritikal yang dapat mempengaruhi kesuksesan pada pembangunan proyek konstruksi jalan tersebut, sehingga proyek dapat berjalan sesuai dengan perencanaan. Penelitian ini dilakukan secara deduktif kuantitatif dimana data diperoleh dari hasil menganalisis data persepsi yang diperoleh dari jawaban kuesioner. Metode yang digunakan dalam penelitian ini adalah analisis RII (Relative Importance Index) dengan menimbang faktor tertinggi dari faktor-faktor yang telah ditetapkan dan nantinya akan dirangkingkan berdasarkan penentuan kriteria penilaian dengan rentang nilai RII yang telah di uji. Maka didapati hasil penelitian terdapat 5 faktor kritis yang dapat mempengaruhi kesuksesan pada proyek konstruksi jalan Desa Blang Gapu-Blang Iboih-Lhok Duek yaitu; pertama adalah variabel X10 yaitu mekanisme pengontrolan yang baik, hasil olah data didapatkan nilai sebesar 4,8372, kemudian variabel X15 yaitu x-factor (kurang etika, curang, korupsi, dan sikap pilih kasih), hasil analisa yang didapat berupa nilai sebesar 4,7674, kemudian variabel X8 yaitu mengimplementasikan program K3 yang efektif, hasil olah data didapatkan nilai sebesar 4,7442, lalu ada variabel X13 yaitu peralatan dalam kondisi baik, menurut hasil data analisa didapatkan nilai sebesar 4,6744, lalu diposisi ke-5 ada variabel X12 yaitu tenaga kerja yang terampil dan berpengalaman, hasil olah data didapatkan nilai sebesar 4,6279.