Claim Missing Document
Check
Articles

Found 12 Documents
Search

ANALISIS PERBANDINGAN EFEKTIVITAS STRATEGI GREEN SUPPLY CHAIN MANAGEMENT : STUDI KASUS PADA SEKTOR PERTANIAN DAN MANUFAKTUR Puspitasari, Anis Fadila; Chanafi, Galih Tri; Prasojo, Arjuna Juan Dwi; Dicasani, Alifta
Jurnal Inovasi Teknik Industri Vol 4, No 2 (2025): JURNAL INOVASI TEKNIK INDUSTRI
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Universitas Muhammadiyah Gombong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26753/jitin.v4i2.1711

Abstract

Dalam era keberlanjutan, Green Supply Chain Management (GSCM) menjadi pendekatan penting untuk mengurangi dampak lingkungan dari aktivitas industri. Penelitian ini bertujuan membandingkan efektivitas strategi GSCM antara sektor manufaktur dan pertanian, khususnya di Kabupaten Kebumen. Metode penelitian yang digunakan adalah studi literatur kualitatif dengan pendekatan analisis isi terhadap enam sumber utama. Hasil menunjukkan bahwa sektor manufaktur lebih banyak mengandalkan teknologi dan sistem terstandarisasi, sedangkan sektor pertanian mengedepankan pendekatan komunitas dan teknologi sederhana. Hambatan utama mencakup keterbatasan akses teknologi, biaya investasi, dan rendahnya kesadaran lingkungan. Studi ini menyimpulkan bahwa integrasi strategi GSCM lintas sektor dapat meningkatkan efisiensi dan keberlanjutan jika didukung oleh kebijakan dan peningkatan kapasitas SDM.
PERANCANGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU PLYWOOD FALCATA DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) (Studi Kasus PT. Prima Parquet Indonesia Cabang Sukoharjo) Ardiyansah, Reza; Dicasani, Alifta; Betanursanti, Ida; Widyastuti, Widyastuti
Jurnal Inovasi Teknik Industri Vol 4, No 2 (2025): JURNAL INOVASI TEKNIK INDUSTRI
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Universitas Muhammadiyah Gombong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26753/jitin.v4i2.1941

Abstract

PT Prima Parquet Indonesia is a manufacturing company engaged in wood processing, particularly in the production of Falcata Plywood. The company faces challenges in managing raw material inventory, such as procurement delays, overstock, and material shortages, which can disrupt the production process and increase operational costs. This study aims to design a raw material planning and inventory control system using the Material Requirement Planning (MRP) method to ensure the availability of raw materials in a timely, efficient, and production-oriented manner. The research stages include developing a Master Production Schedule (MPS), creating a Bill of Material (BOM), collecting lead time data, and calculating net requirements using the lot sizing technique. The results show that the implementation of the MRP method, particularly with the Lot for Lot (LFL) technique, is more optimal than the company’s conventional method because it can reduce inventory costs and prevent both shortages and excesses of raw materials. The application of the MRP system also improves operational efficiency, supports structured production planning, and ensures smoother production processes at PT Prima Parquet Indonesia. Therefore, the MRP method can serve as a strategic solution for raw material inventory control in the wood processing industry.