Claim Missing Document
Check
Articles

Analisis Konsumsi Energi Listrik dan Identifikasi Peluang Penghematan pada Gedung Pusat Kebugaran Galih Tri Prawira Harja; I Wayan Suriana; I Wayan Sukadana; I Wayan Sugara Yasa
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5438

Abstract

Electrical energy is essential for supporting the operational activities of commercial buildings. Fitness centers have relatively high electricity consumption due to the use of air conditioning (AC), lighting, sports equipment, and other electrical devices that operate for long hours. LPD GYM Pemogan was selected as the study object because it operates daily with extended hours and various electrical loads. This study aims to determine the Energy Consumption Intensity (ECI), evaluate electrical energy use by comparing the ECI with applicable standards, and identify Energy Saving Opportunities (ESO). The research uses a quantitative descriptive method with an initial energy audit approach, using primary and secondary data on building conditions, electrical equipment, installed power capacity, building area, operating hours, electricity consumption, and electricity bills over six months. The analysis was conducted by calculating electricity consumption and ECI and comparing the results with reference standards. The average electricity consumption was 14,850 kWh/month, with a building area of 764.62 m². The ECI was 19.42 kWh/m²/month or 233.06 kWh/m²/year. Based on the ECI standard for air-conditioned buildings, the value is categorized as inefficient (wasteful), while it remains below the ASEAN-USAID benchmark. Energy savings can be achieved by optimizing AC temperature set points, regulating AC operation, and adjusting schedules according to room usage.
Analisis Tekno-Ekonomi Uprating Jaringan Tegangan Menengah Akibat Interkoneksi Pembangkit Listrik Minihidro Warnasi-Warkapi Pada Sistem Manokwari I Putu Duta Satya Prananda; I Wayan Sutama; I Wayan Sukadana; I Wayan Suriana
Science and Education Journal (SICEDU) Vol 5 No 3 (2026): Science and Education Journal 2026
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/sicedu.v5i3.1655

Abstract

PLTM Warnasi-Warkapi berkapasitas 2 × 2,30 MW direncanakan terinterkoneksi dengan Penyulang Seruni menuju GH Maruni pada sistem kelistrikan Manokwari. Integrasi ini meningkatkan arus jaringan hingga 156,2242 A pada penghantar eksisting AAAC 70 mm², sehingga berpotensi menyebabkan penurunan tegangan dan peningkatan susut teknis. Penelitian ini menganalisis dampak interkoneksi terhadap kualitas tegangan dan rugi-rugi daya, serta mengevaluasi kelayakan investasi uprating penghantar berdasarkan penghematan biaya energi, NPV, IRR, dan Payback Period. Hasil menunjukkan bahwa penghantar AAAC 70 mm² mengalami drop tegangan 16,68% dan rugi energi 3.860.084 kWh/tahun. Setelah uprating, AAAC 150 mm² menurunkan nilai tersebut menjadi 10,87% dan 1.982.920 kWh/tahun, sedangkan AAAC 240 mm² menghasilkan 8,41% dan 1.225.004 kWh/tahun. Meskipun kedua alternatif belum memenuhi batas drop tegangan 5% berdasarkan SPLN 72:1987 akibat dominasi reaktansi, AAAC 240 mm² menjadi pilihan paling ekonomis dengan penghematan Rp4.222.162.438 per tahun, NPV Rp41.690.640.946, IRR 72,28%, dan Payback Period 1 tahun 5 bulan. Dengan demikian, AAAC 240 mm² direkomendasikan sebagai alternatif uprating terbaik, disertai kebutuhan mitigasi tambahan untuk memenuhi standar kualitas tegangan PLN.