Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Jurnal Civil Engineering Study

Faktor-Faktor Yang Mempengaruhi Penyedia Jasa Untuk Mengikuti Tender Pekerjaan Konstruksi Di Kota Palangka Raya Larasati; Dewantoro; Nuswantoro, Waluyo
Jurnal Civil Engineering Study Vol. 4 No. 01 (2024): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v4i01.857

Abstract

In the development of Central Kalimantan, the construction sector plays a strategically significant role in providing infrastructure. In 2022, there were 2,082 registered construction companies, with 27.19% of them located in Palangka Raya City. According to data obtained from the Electronic Procurement Service (LPSE) of the Palangkaraya City Government, a total of 155 construction service procurement packages were tendered in 2023. The realization of the participation level of construction job providers and consulting services experienced a decrease compared to 2022. Data collection was conducted through questionnaire distribution and literature review. This research employed the Structural Equation Modeling-Partial Least Squares (SEM-PLS) method for data analysis using SmartPLS 3.0 software. The results of the analysis show that the characteristics of the company, project characteristics, project documents, tender conditions, and economic conditions significantly influence and contribute greatly to influencing service providers to participate in construction job tenders.
Faktor-Faktor Keselamatan dan Kesehatan Kerja (K3) Terhadap Kinerja Pekerja Konstruksi Fransiska Meilani Putri; Veronika Happy Puspasari; Dewantoro
Jurnal Civil Engineering Study Vol. 4 No. 02 (2024): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v4i02.1165

Abstract

Perusahaan akan berhasil mencapai tujuannya dengan baik apabila mampu mengelola sumber daya manusia (SDM) dengan efektif. Salah satu upaya penting dalam manajemen sumber daya manusia adalah memprioritaskan keselamatan dan kesehatan kerja (K3) para pekerjanya. Program K3 menjadi tanggung jawab perusahaan dalam melindungi pekerja selama menjalankan berbagai aktivitas kerja. Program ini dilakukan oleh perusahaan dengan tujuan menjaga kesejahteraan karyawan agar terlindungi dari cedera atau kecelakaan di tempat kerja, dan juga untuk mencegah timbulnya penyakit, baik yang bersifat sementara maupun jangka panjang. Studi literatur ini bertujuan untuk mengidentifikasi faktor-faktor K3 yang memengaruhi kinerja pekerja di proyek konstruksi. Metodologi yang digunakan adalah pencarian literatur melalui pencarian di database seperti Google Scholar, dimana literatur yang relevan diolah dan dijadikan sumber informasi untuk analisis lebih lanjut. Berdasarkan studi literatur yang ada, terdapat 29 faktor K3 yang memengaruhi kinerja pekerja. Lima faktor utama yang paling banyak digunakan pada penelitian sebelumnya adalah: prosedur K3 mudah diterapkan dengan konsisten, perusahaan berusaha membangun komunikasi yang baik dengan seluruh pekerja, perbaikan peraturan K3 secara berkala, peraturan K3 mudah dipahami, dan pekerja mampu menyelesaikan tugas dalam batas waktu yang telah ditentukan.
Pengaruh Fasilitas Infrastruktur Pendukung Keselamatan Dan Kenyamanan Pada Pengguna Jalan Di Bundaran Besar Kota Palangka Raya Najwamuna Norazizah Rahmania; Dewantoro; Veronika Happy Puspasari
Jurnal Civil Engineering Study Vol. 5 No. 01 (2025): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v5i01.1170

Abstract

The Great Roundabout in Palangka Raya City is a significant symbol in Central Kalimantan Province, serving as a traffic intersection and a public space that supports social interaction. With the growing population and number of vehicles, various problems have emerged, such as congestion, accidents, and a lack of pedestrian comfort. This study aims to analyze the influence of infrastructure facilities on the safety and comfort of road users at the Great Roundabout. Using a literature review approach, this study identified 27 variables related to infrastructure, safety, and comfort. Factors affecting comfort are divided into two categories: internal factors, which include attitudes, awareness, and driving experience, and external factors, which include road conditions, the presence of other vehicles, and traffic management. The results of the analysis show that infrastructure, such as pedestrian bridges, wider sidewalks, and green open spaces, has a significant impact on improving the safety and comfort of road users. It is hoped that this study can provide deeper insights into the relationship between infrastructure facilities and road user experiences, and serve as a basis for the development of better policies in the planning and management of road infrastructure in urban areas, especially in Palangka Raya City.
Implementasi Building Information Modelling 3D, 4D, dan 5D pada Pembangunan Masjid Dodik Latpur Amborawang Yosef Metrio; Purwantoro, Almuntofa; Dewantoro
Jurnal Civil Engineering Study Vol. 5 No. 02 (2025): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v5i02.1368

Abstract

This study aims to analyze the implementation of 3D, 4D, and 5D Building Information Modeling (BIM) in the construction project of the Dodik Latpur Mosque in Amborawang, East Kalimantan. The method used is a quantitative approach with data analysis using Graphisoft ArchiCAD, CYPE Open BIM Quantities, and Microsoft Project software. The results of the study indicate that the application of BIM significantly improves the accuracy of planning and cost estimation, with the Cost Estimate (RAB) calculated at Rp. 2,180,960,541.24, showing a difference of 2.54% compared to the conventional method. Additionally, the project duration was reduced by 14 days, with a total time of 168 days. The study concludes that BIM integration not only improves accuracy and efficiency in project management but also strengthens collaboration among stakeholders. These findings are expected to make a significant contribution to the adoption of BIM technology in the Indonesian construction industry.