Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Abdimas Universal

Studi Kelayakan Aerasi Bertenaga Micro Hydro Power Plant Pada Sarana Air Bersih Berkah Air Dondang Ahkmad Nurdin; Siska Ayu Kartika; Fransye Joni Pasau; A. Asni B; Mayda Waruni K; Aswadul Fitri; Alex Kisanjani; Misrianto; Dimaz Harits
Abdimas Universal Vol. 3 No. 1 (2021): April
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat Universitas Balikpapan (LPPM UNIBA)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36277/abdimasuniversal.v3i1.93

Abstract

CSR PT. XYZ berencana membangun sebuah fasilitas sistem Aerasi bertenaga Micro Hydro Power Plant di lokasi Sumber Air Berkah Air Dondang. Untuk memastikan kelayakan rencana tersebut, pihak CSR PT. XYZ meminta bantuan kepada Universitas Balikpapan. Ide ini didasari oleh keinginan memanfaatkan sudut elefasi dan jarak antara dua buah kolam penampungan yang telah dibangun sebelumnya. Dalam realitanya, belum ada pengukuran teknik terhadap perencanaan tersebut. Merespon permintaan CSR PT.XYZ, Fakultas Teknologi Industri Universitas Balikpapan segera membentuk Tim untuk melakukan survey dan studi kelayakan. Berdasarkan hasil survey dan analisis Tim, rencana pembangunan fasilitas sistem aerasi bertenaga micro hydro power plant tidak direkomendasikan. Sebab, daya air terpasang lebih kecil dari daya yang dibutuhkan. Hasil survey, temuan lapangan, hasil pembahasan dan masukan alternatif telah dituangkan kedalam laporan studi kelayakan yang diserahkan kepada pihak CSR PT. XYZ selaku pemohon. Diharapkan hasil studi kelayakan ini dapat dipergunakan sebagaimana mestinya oleh pihak CSR PT. XYZ.
Kajian Kawasan Pergudangan di Kabupaten Penajam Paser Utara Dimaz Harits; Surahman Surahman; Afif Bizrie Mardhanie; Thomas Robert Hutauruk; M. Salmani; Mohammad Faisal
Abdimas Universal Vol. 4 No. 1 (2022): April
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat Universitas Balikpapan (LPPM UNIBA)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36277/abdimasuniversal.v4i1.166

Abstract

Penajam Paser Utara Regency is one of the regencies in East Kalimantan that is predicted to be a candidate for the new capital city of the Unitary State of the Republic of Indonesia. Industrial development has changed along with the increasing intensity of development implementation. The designation of the Buluminung Industrial area has been determined, to support its existence, the Penajam Paser Utara Regency Government plans to build a warehousing area. This article briefly reviews the results of spatial analysis, transportation analysis, technical analysis, supply chain management analysis, financial economic analysis, social analysis, environmental risk analysis. The results of this study are expected to provide an overview of the prospects for the development of warehousing areas in Penajam Paser Utara Regency and can be utilized as well as possible by Penajam Paser Utara Regency.
Pelatihan Dasar-Dasar Manajemen Proyek Menggunakan Perangkat Lunak Primavera P6 Bagi Alumni dan Mahasiswa Tingkat Akhir Lintas Universitas Dimaz Harits; Kuswandi Arifin
Abdimas Universal Vol. 5 No. 1 (2023): April
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat Universitas Balikpapan (LPPM UNIBA)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36277/abdimasuniversal.v5i1.277

Abstract

Project management is the management of human and material resources to achieve targets that include quality, scheduling, cost, and stakeholder expectations. Industry 4.0 affects business processes, including in the construction field. The Primavera P6 Professional Project Management Fundamentals training, which is part of the Ministry of Communication and Information Technology's 2022 Digital Talent Scholarship program, aims to improve the productivity of young construction industry talent by enhancing their understanding of technology and automation. The training uses synchronous Zoom-based methods and lasts for four weeks plus one final exam day. Out of a total of 26 participants, five people successfully achieved the passing grade score and followed the international competency test certification for Oracle Primavera P6, which was held by Oracle University.