Claim Missing Document
Check
Articles

Found 17 Documents
Search
Journal : Journal of Green Science and Technology

MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY Dian Indra Rosdiana; Saihul Anwar
Journal of Green Science and Technology Vol 1 No 1 (2017): Journal of Green Science and Technology
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1033

Abstract

Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety.This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow.          The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.
TRAFFIC PLANNING IN KUNINGAN CITY CENTER Diky Irdianto Pratama Pratama; Saihul Anwar
Journal of Green Science and Technology Vol 1 No 1 (2017): Journal of Green Science and Technology
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1035

Abstract

This research was conducted to improve the performance of service of Siliwangi Road which decreased. The data obtained from the Department of Transportation brass form LHR data brass city, road length, and the average speed of the vehicle, Then in if the degree of saturation of the Road in order to know the success of the New Planning. To facilitate the research and also because it has different problems Siliwangi road for 2 parts cut off by crossing, Siliwangi Street 1 which starts from Cijoho roundabout Until the intersection near Smpn 1 Kuningan has LHR 2563 smp with degree of saturation 0,97 at level Service E and Jalan Siliwangi 2 starting from intersection of Smpn 1 Kuningan Until the junction of Jalan Veteran has LHR 1761 smp with degree of saturation 0,67 level of service C. After in doing traffic engineering level of road service go up, Siliwangi Street 1 become C with degree of saturation 0.57 also Jalan Siliwangi 2 level service C with degree of saturation 0,51.
Comparison of Pile Bearing Capacity Based on Standard Penetration Test (SPT), Hydraulic Static Pile Driven (HSPD), and Pile Driving Analyzer (PDA) Test in The Project of Flyover Antapani – Bandung Retno Wulansari; Saihul Saihul Anwar
Journal of Green Science and Technology Vol 2 No 1 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i1.1172

Abstract

ABSTRACTThe pile foundation is one of a kind of deep foundation that serves to funnel structural loads to hard soil layers that have a high carrying. The purpose of this study was to calculate the bearing capacity of piles.Based on SPT data obtained and calculated by Mayerhoff method at point BH-01 Qult = 259,992 tons, at point BH-02 Qult = 258,234 tons, and at point BH-03 Qult = 279.586 tons, with HSPD data obtained based on reading dial pressure manometer tool is approximately from 178,365 tons - 186,120 tons, whereas with PDA obtained based on RMX value on PDA test is about 124 tons - 225 tons.The results of the calculation of bearing capacity there are differences in values, both from the use of calculation methods and the location of points reviewed. From the results of the calculation can be concluded that the big highets bearing capacity the pile is values of SPT. In values of HSPD and PDA is relative same because the method using similar method (hydraulic and wave method).
ANALYSIS OF HYDROLOGY OF THE KALIGUNG RIVER AT TEGAL Disty Prasanty; Saihul Anwar
Journal of Green Science and Technology Vol 2 No 1 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i1.1173

Abstract

ABSTRACTRivers drain water by embracing a gravitational philosophy, in which water always flows from high to low or downstream to downstream. The process of river water flow is an endless natural process, closing the hydrological cycle by restoring the river runoff to the sea. For centuries, rivers have been used as a source of clean water, meeting human needs for drinking water, sanitation, irrigation, and so on. Large rivers are dammed to store water in the wet season and use it in the dry season for various purposes.Kali Gung or Kaligung or also known as Kaligung river is a river that flows in Tegal regency, Central Java. This river is one of the largest rivers in Tegal besides Kali Ketiwon and Kali Kemiri. This river is called Kali Gung because it is tangent to the spring that comes from Mount Agung is an ancient name from Mount Slamet in pre-Islamic times in Java. Upstream or spring water Kaligung located in the north of Mount Slamet and empties to the north precisely in the sea of Java.Keywords: Hydrologycal cycle, rivers, downstream, upstream, Kaligung.
ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA Cepi Maulana; Saihul Anwar
Journal of Green Science and Technology Vol 2 No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1286

Abstract

Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans.This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
ANALYSIS OF CONSTRUCTION MANAGEMENT CONSTRUCTION PROJECTS DEVELOPMENT OF FLATS OF TEGAL ALUR DKI JAKARTA Akhmad Jamaludin; Saihul Anwar; Bukhori Bukhori
Journal of Green Science and Technology Vol 2 No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1288

Abstract

Location of the development project of Tegal Alur DKI Jakarta KSO.WIKA & CAKRA in the Lingkungan III Tegal Alur West Jakarta coordinates Y: 2500.000 X: 2500.000 (West Jakarta PUPR Office)Project management is an attempt to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities of the basic functions of project management namely planning, implementation and control. Of the three activities are controlled resources on a project that includes manpower, equipment, materials, money and methods.Analysis of Construction Management of Jakarta TegalAlur DKI Jakarta Project Development Project includes Analysis of Work Implementation Method, Volume Calculation and Budget Plan of Jakarta TegalAlur DKI Jakarta Development Project, Schedule Compilation at TegalAlur DKI Jakarta Flower Housing Project, Cash Flow Analysis On Development Project of TegalAlur DKI Jakarta Flats.This research methodology is composed of several main stages, namely Preparation of Survey and Identification of Field, Seeking primary data and secondary data in related institution and department needed to complete data needed in preparation of thesis, Conducting analysis of data obtained through identification problem and make formulation, Taking conclusions and suggestions from the results of research.With Budget Plan Cost and calculation of workload of Jakarta Flat Development Project TegalAlur DKI Jakarta resulted in Working Time Plan takes 231 days using CPM scheduling method with estimated cost of Rp. 36.690.228.549 Keywords         :Project Management, Bar Chart, Curva S, CPM (Critical Path Method)
ANALYSIS OF PROJECT MANAGEMENT TRANSMART CARREFOUR IN TEGAL CITY - CENTRAL JAVA Septi Dwi N.I.S; Saihul Anwar
Journal of Green Science and Technology Vol 2 No 3 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i3.2142

Abstract

Project implementation is said to be optimal if good project management planning so that it can be done efficiently, qualified, safe, and economical. To produce an optimal project management is required with certain methods adjusted by the project. The purpose of this study is to determine the scheduling of project time to be done by using CPM network method (Critical Path Method) which will result in the length of time of completion of the project and determine the start and end time in each work. The first step is to conduct a field survey, collecting project data such as time schedule, and basic theory. After the data collection is considered enough, then the data is determined again with the method of CPM (Critical Path Method), followed by determining how much the cost to be incurred, and then made barchart and curve S. From the research results obtained, for project implementation can be completed with time work plan 282 days or 47 weeks. But with that time there are some critical work that will affect the duration, so special attention is required on the work. And costs incurred as much as Rp 223,363,901,783.98.Keywords : CPM (Critical Path Method), Duration of Work, Project Cost, Barchart, and Curve S
CONSTRUCTION MANAGEMENT ANALYSIS OF CIDERES HOSPITAL Zaid Al Hakim; Saihul Anwar
Journal of Green Science and Technology Vol 3 No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2149

Abstract

Reliable infrastructure requires effective and efficient management from the planning, structural, construction, operational and maintenance phases to the end of service life. Good management of civil infrastructure guarantees not only to save funds, but to use natural resources appropriately, thus ensuring ecological sustainability.Construction management is part of civil engineering science that focuses on managing construction projects to realize technical concepts and designs produced by other parts of civil engineering science. Construction management aims to build built physical facilities or infrastructure that is needed to support human life.Management of construction projects is becoming increasingly complex due to the many parties that interact in it and the increasingly high demands for quality of functions, comfort, security, aesthetics and sustainability. Therefore construction management is needed to ensure the efficiency and productivity of a construction project in meeting various expectations and requirements.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Based on the calculation of cash flow to complete the construction of Cideres Hospital Kadipaten Dawuan Majalengka project until final stage more or less cost as much Rp. 9,034,000,000,00. These costs are divided into two parts, structure and architecture work ,for structures the cost as much Rp. 3,644,000,000,00 and for architecture the cost is Rp. 5,390,000,000,00. From the calculation of CPM scheduling analysis, the development of Cideres Hospitalproject takes time for 45 weeksKeyword: Project Management, Bar Chart, S Curve, Critical Path Method
ANALYSIS OF THE SALAMDARMA IRRIGATION AREA PERFORMANCE Oky Fajar Rochman; Saihul Anwar
Journal of Green Science and Technology Vol 3 No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2150

Abstract

Salamdarma weir is located right in the border area of Indramayu and Subang, belongs to administrative area of Anjatan District, Indramayu Regency.  Managed by PT JasaTirta II Section of Patrol.  This irrigation netwoork has a total service area of 35871 Ha, the service area includes Subang District and Indramayu District. The existence of Salamdarma irrigation network has an important role for the farmers especially during dry season to support the crops’ growth.In this research to analyze the performance used parameter from Permen No 11/PRT/M/2015 and calculated using Hydrology regulation from KP 01 Irrigation 2013.The analysis result of this research show that 80,9% of structures and 95,1% of canals are in damaged condition with different various level of damage. Based on the calculation and comparison between potential discharge and water requirement, the potential discharge has fulfilled the irrigation water requirement and the comparison. The water requirement is 29890 lt/s and the potential discharge is 64074 lt/s. The human resources in Salamdarma irrigation there is only deficient in the head of branch position of 12%. For POB, PPA, PPS Personel amount has fulfilled the required amount of personel.  The Operation and Maintenance budget in Salamdarma Irrigation is increased at 30,112% between 2016 to 2017. Keyword : Irrigation, Salamdarma, Performance, Irrigation water requirement.
The Analysis Of Hydrology In Comal River Gunawan Gunawan; Saihul Anwar; Ohan Farhan
Journal of Green Science and Technology Vol 3 No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2384

Abstract

This research was conducted to find out the availability of water to the requirements of water and also predict flood plan discharge for return period based on hydrological analysis in Comal River.Calculations are carried out using rainfall data obtained from PUSDATARU of Pemali - Comal from 1999 - 2017.Used the rainstation in the region of Comal Watershed, there are 7 rain stations. Catchment area of rain station used Thiessen Polygon Method to know value of catchment area of each rain station. The Gumbel distribution (Generalized Extreme Value distribution Type-I) is used to model the distribution of the maximum (or the minimum) of a number of samples of various distributions. The calculation of the flood discharge design is using the Nakayasu, Rational, Weduwen, Weduweden, and Haspers method.Based on the result of this research it can be concluded that the biggest water potential occurs in January is 199.60 m3/s and the smallest in August is 0.84 m3/s. Cropping pattern carried out with one year there are three cropping patterns, namely paddy - paddy - secondary crops. For the water requirements, enough can be fulfilled, but in August and September, where the planting period III for the secondary crops experiences a deficit. The method used to design flood discharge is the Nakayasu method. For the embankment construction and normalization is profitable.Keywords: River, Flood, Embankment, Thiessen, Comal  
Co-Authors Abdul Wahid Abdur Rahman Ade Wahab Aghniya, Shilvy Agung Prasetyo Agus Gunawan Ahmad Mansubun Zamanudin Ainun Yusri Akbar Winasis Akhmad Jamaludin Aldi Aldi Andi Darmawan Andri Prabowo Anggriani, Esa Arief Firmanto Arief Ridho Syaepullah Arif Kurnia Nugraha Arip Saepudin Aryati Indah Kusumastuti Asep Agung Awliya Tribhuwana Azi Ibrahim Humaidi Baban Sobana Bagas Ramadhan Bukhori Bukhori Bukhori, Bukhori Cepi Maulana Christhoper Anderson Dea Devira Hidayati Deni Setiaji Dennis Bintang Nugroho Diah Utami, Diah Dian Indra Rosdiana Dikdik Nur Fahmi Diky Irdianto Pratama Pratama Dinni Fitri Fadilah Disty Prasanty Eki Danet Pranata Putra Endah Kurniyaningrum Esa Anggriani Fadhilah, Qalya Fadilah, Dinni Fitri Fahmi Arif Rahman Fani Andriani Faozie Novatrianto Faqih Mubarok Amin Faridah Ilmi Firdan Agustiarsyah Fisti Variandini Senjaya Gunawan Gunawan Gunawan Gunawan Hakim, Zaid Al Hamdan Ali Khapid Handri Wildan Fauzi Harry Harpriyanto Heri Mulyono Ikhwanul Fakhri Mu'afa Ikhwanul Fakhri Mu'afa Iko Prasetio Iwan Rudiawan Iyus Imam Jamaludin, Akhmad Jepry Jepry Karim Karim KHUSNUL HOTIMAH Liani Dwi Utari Mahendra, Bobby Maulana, Cepi Mohamad Azhari Muhamad Faisal Firdaus Muhamad Salman Salahuddin Muhammad Lukie Yudhistira Muhammad Yassin Zubair Pratama Mutamakin Mutamakin N.I.S, Septi Dwi Nikko Rozy Nikko Rozy Nopa Pahlawati Nugroho, Dennis Bintang Nurdiyanto Nurdiyanto Nurfatah Alkarim Ohan Farhan Oky Fajar Rochman Osep Saepul Azhar Pahlawati, Nopa Panangian Situmorang Pebi Mahar Ramadhan Prasanty, Disty Prasetio, Iko Pratama, Diky Irdianto Pratama Recky Dwi Permadi Retno Wulansari Ridlo Hafizh Alim Rizal Pikih Pratama Rochman, Oky Fajar Rosdiana, Dian Indra Roza Legawa Saeful Hadi Salman Alparis Septi Dwi N.I.S Shilvy Aghniya Sigit Hidayat Siti Masitoh Suhadi Suhadi Sujarwadi, Jajang Sulaiman Alizulfiqar Sulistijo Edhy Purnomo TATI NURHAYATI Teguh Santoso Tri Rezki Wahyu Azhari Trisno Adi Saputra Wildan Alfian Wisnu Saefuloh Yanto Heryanto Yudha Prigadi Yudi Sutomo Zaid Al Hakim Zaki, M.