Claim Missing Document
Check
Articles

Found 7 Documents
Search

Information system of Limboto Lake potential management Lanto Ningrayati Amali; Sunarty Eraku; Ishak Isa; Rifadli Bahsuan; Sitti Suhada; Muhammad Rifai Katili
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 17, No 5: October 2019
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v17i5.11800

Abstract

Limboto Lake is one of the lakes in Gorontalo Province; its water supply is generated from 23 small and large rivers. The lake holds potential in several sectors, e.g., tourism, fisheries, socio-economy and culture. However, such an advantage has no quality information system as it is found that there are no particular services that manage the information regarding Limboto Lake accurately. The objective of this research is to create an information system for the management of the potential area of the lake to provide quality services to access the information accurately and completely. The provided information is also updated timely. This research employed the System Development Life Cycle (SDLC) method in the development of the information system. Furthermore, the data were collected from interview, observation, and reviewing literature and document. This system is tested using white box and black box where it generated the expected outcome and is web-based. The output of this research is a system that eases the society to access the information regarding the management of the potential area in Limboto Lake.
Pemberdayaan Masyarakat Desa Dalam Menghadapi Covid-19 Mohammad Yusuf Tuloli; Rifadli Bahsuan; Arfan Usman Sumaga
Jurnal Sibermas (Sinergi Pemberdayaan Masyarakat) Vol 9, No 3 (2020): Jurnal Sbermas (Sinergi Bersama Masyarakat)
Publisher : Univeristas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/sibermas.v9i3.8088

Abstract

Virus Covid-19 merupakan bencana yang telah mengganggu sendi-sendi kehidupan masyarakat dunia termasuk masyarakat di Provinsi Gorontalo. Perguruan tinggi melalui Tri Dharma perguruan tinggi dimana salah satunya melakukan pengabdian kepada masyarakat perlu berperan serta dalam mengurangi dampak dari virus tersebut baik dalam bidang ekonomi, sosial maupun pendidikan. Tujuan dari kegiatan ini adalah melakukan pendampingan belajar untuk anak-anak sekolah yang kurang bisa menyerap pelajaran dengan sistem online, melakukan sosialisasi mengenai Covid-19 kepada masyarakat Desa Dambalo di Kabupaten Pohuwato dan Pelatihan untuk penanganan Covid-19 yang sekaligus dapat meningkatkan perekonomian masyarakat. Metode yang dipakai adalah survey dan edukasi tentang Covid 19. Dari hasil kegiatan, terlihat terjadinya peningkatan tingkat pemahaman anak-anak sekolah terhadap pelajaran yang didampingi oleh peserta KKS, meningkatnya pemahaman masyarakat tentang Covid-19 serta meningkatnya keterampilan masyarakat dalam membuat alat cuci tangan dalam mereduksi penyebaran Covid-19 dimana hasil dari pembuatan alat ini dapat dijual sehingga dapat meningkatkan pendapatan masyarakat di masa pandemic ini.
Analisis Manajemen Risiko Pada Pelaksanaan Pembangunan Rusun BPK RI Kota Gorontalo Lina, Melina Gobel; Sumaga, Arfan Usman; Tuloli, Mohammad Yusuf; Bahsuan, Rifadli
Composite Journal Vol. 5 No. 1 (2025): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v5i1.138

Abstract

Manajemen risiko pada pembangunan Rusun BPK RI Kota Gorontalo dianggap perlu untuk dapat mencapai tujuan proyek dengan biaya dan waktu yang tepat. Sehubungan dengan hal tersebut, maka perlu dilakukan kajian identifikasi dan analisis risiko konstruksi pada saat pelaksanaan pembangunan Rusun BPK RI Kota Gorontalo. Parameter yang dianalisis dalam penelitian ini adalah pengujian validitas dan reliabilitas menggunakan SPSS, severty index, metode probability impact matrict. Hasil analisis menunjukkan terdapat 36 variabel risiko pada proyek pembangunan Rusun BPK RI Provinsi Gorontalo yang telah dilakukan pengujian validitas dan reliabilitas semua terbukti valid dan reliabel. Variabel risiko diklasifikasikan menjadi 7 variabel yaitu Risiko Fource Majeure, Risiko Material dan Alat, Risiko Tenaga Kerja, Risiko Pelaksanaan, Risiko Desain dan Teknologi, Risiko Manajemen dan Dampak Lingkungan. Berdasarkan pengolahan data pada kuesioner, didapatkan tingkat risiko yang tinggi yaitu variabel risiko Fource Majeure, dengan nilai mean atau rata-rata probabilitas sebesar 40,56% dan dampaknya sebesar 47,78%, tingkat risiko tinggi yang didapatkan berdasarkan hasil wawancara yaitu variabel risiko Fource Majeure pada indikator risiko Cuaca Tidak Menentu.
Rekayasa Waktu dan Biaya Pada Pembangunan Gedung Bertingkat (Studi Kasus: Rumah Susun BPK RI Kota Gorontalo) Fira, Maghfirah Maulidyah Mantulangi; Sumaga, Arfan Usman; Tuloli, Mohammad Yusuf; Bahsuan, Rifadli
Composite Journal Vol. 5 No. 1 (2025): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v5i1.140

Abstract

Proyek dapat diartikan sebagai upaya atau kegiatan yang terstruktur untuk mencapai tujuan, sasaran dan harapan-harapan penting dengan menggunakan anggaran dana serta sumber daya yang tersedia, yang harus diselesaikan dalam jangka waktu tertentu. Suatu proyek membutuhkan manajemen proyek dalam membuat penjadwalan waktu yang efektif dan efisien agar pelaksanaan pekerjaan dapat berjalan sesuai dengan yang direncanakan sehingga tidak mengalami keterlambatan. Penelitian bertujuan untuk menganalisa manajemen waktu dan total biaya setelah dilakukan percepatan durasi dengan menambah jam kerja (lembur). Metode penelitian yang digunakan yaitu Crashing Program dengan penambahan jam kerja (lembur) pada lintasan kritis. Lintasan kritis diperoleh dari hasil network diagram yang ditampilkan secara otomatis oleh Microsoft Project 2021. Crashing dilakukan dengan menambahkan 1 sampai 3 jam kerja (lembur). Setiap uraian pekerjaan memiliki nilai cost slope serta nilai crash cost (peningkatan biaya akibat dipercepat) yang berbeda – beda pada setiap alternatifnya. Beberapa data yang diperlukan pada penelitian ini seperti RAB, Kurva S dan AHSP. Hasil penelitian menunjukkan biaya normal pada pekerjaan struktur lantai 4 (dak) sebesar Rp. 284.516.635,59 dengan durasi pekerjaan selama 26 hari, setelah dilakukan penambahan 1 jam kerja diperoleh total biaya sebesar Rp. 284.918.720,77 dengan durasi pekerjaan selama 25 hari, penambahan 2 jam kerja diperoleh total biaya sebesar Rp. 283.120.499,35 dengan durasi pekerjaan selama 24 hari, sedangkan pada penambahan 3 jam kerja diperoleh total biaya sebesar Rp282.442.842,251 dengan durasi pekerjaan selama 23 hari.
Analisis Manajemen Risiko Pada Pembangunan Gedung Perkuliahan Terpadu Iain Sultan Amai Gorontalo Ismet Ali; Sumaga, Arfan Usman; Tuloli, Mohammad Yusuf; Bahsuan, Rifadli
Composite Journal Vol. 5 No. 1 (2025): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v5i1.141

Abstract

Manajemen risiko adalah pendekatan untuk mengatasi risiko dan ketidakpastian dengan mengidentifikasi, menganalisis, dan mengurangi dampak risiko sebagai dasar tindakan untuk meminimalkan dampak dari risiko tersebut. Sehingga Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis risiko yang terjadi pada proyek pembangunan Gedung Perkuliahan Terpadu IAIN Sultan Amai Gorontalo. Proyek tersebut menghadapi berbagai risiko konstruksi yang dapat menghambat kelancaran pelaksanaannya. Penelitian ini menggunakan kuisioner dan wawancara untuk mengumpulkan data dari responden yang terdiri dari konsultan, staf administrasi, pelaksana lapangan, dan mandor. Variabel risiko dianalisis menggunakan metode severity index dan matriks probabilitas dan dampak. Hasil penelitian menunjukkan bahwa terdapat 38 variabel risiko valid yang terbagi dalam beberapa kategori risiko, seperti risiko kontraktual, finansial, teknis pelaksnaan, peralatan, manajemen, material, tenaga kerja, desain, dan force majeur. Dari variabel-variabel tersebut, terdapat risiko dominan dengan probabilitas dan dampak tinggi yang perlu mendapat penanganan prioritas, seperti pengalihan pekerjaan oleh kontraktor, ketidakpatuhan tenaga kerja terhadap ketentuan K3, dan kecelakaan kerja. Manajemen risiko yang efektif diperlukan untuk meminimalkan dampak risiko pada proyek guna mencapai penyelesaian yang tepat waktu, sesuai anggaran, dan memenuhi standar keselamatan.
TINJAUAN KESTABILAN PERKUATAN LERENG MENGGUNAKAN DINDING KANTILEVER DAN DINDING GRAVITASI Eka Liani, Annisa; Patuti, Indriati Martha; Bahsuan, Rifadli
Composite Journal Vol. 1 No. 1 (2021): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (468.339 KB) | DOI: 10.37905/cj.v1i1.11

Abstract

Parts of Gorontalo are hills and mountains close to community settlements, which are prone to landslides. To do a research on literature review that analyzes slope reinforcement models, which will be taken into consideration for slope improvement steps in Gorontalo. Slope reinforcement includes retaining walls, gravity walls, cantilever walls and crib walls. This research discusses slope reinforcement models and their stability behavior analysis. Secondary data is in the form of research journals on slope reinforcement models. Calculation data that will be used as experimental data for modeling other retrofitting walls are obtained from the results of research from one of the reviewed journals, namely multilevel gravity walls. The wall that will be analyzed is the retaining wall of a multilevel cantilever type of wall. Analysis of active soil pressure using the Rankine method and slope stability analysis using the slice method which is carried out with the help of 2D Slide software. Based on the results of the stability analysis of slope reinforcement with the selection of stratified cantilever wall reinforcement, the value of the safety factor against sliding (Fgs) is 1.63>1.5, the safety factor against overturning (Fgl) is 2.44>2.0, the safety factor against the collapse of carrying capacity (F) is 8.49>3.0, and the global safety factor value is 1.56>1.5. The value of the safety factor for shifting and rolling has decreased by 1% and 20% respectively compared to the gravitational wall. In the wall bearing capacity, there was an increase of 31%. Changes that occur in the safety factor in cantilevered walls are caused by changing factors in the dimensions of the walls which affect the strength of the structure in the soil holding force and the type of working principle of the walls. As for the global slope stability analyzed, there was a decrease in the safety factor by 5% after changing the type of reinforcement, but it showed that the slope was still stable, because the cantilevered wall type has a slender front wall dimension compared to the gravity wall which is more resistant to the risk of lateral slope movement.
ANALISIS PEMAHAMAN RELASIONAL MAHASISWA JURUSAN KIMIA UNIVERSITAS NEGERI GORONTALO PADA MATERI KINETIKA REAKSI KIMIA Suleman, Nita; Bahsuan, Rifadli
Proceeding Seminar Nasional IPA 2025
Publisher : LPPM UNNES

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tujuan penelitian adalah untuk mengetahui pemahaman relasional mahasiswa Jurusan Kimia di Universitas Negeri Gorontalo pada materi kinetika reaksi kimia. Penelitian ini merupakan penelitian deskriptif kualitatif. Dalam penelitian ini teknik pengumpulan data yang digunakan adalah melalui tes uraian materi kinetika reaksi kimia sebanyak 7 nomor yang telah divaliasi dan kuiseoner pertanyaan terbuka sebanyak 42 butir pertanyaan yang telah divalidasi. Sampel penelitian ini yaitu mahasiswa Kimia sebanyak 94 mahasiswa. Hasil penelitian mahasiswa yang memiliki pemahaman relasional kategori rendah dengan perolehan persentasi rata-rata sebesar 95,74%, mahasiswa yang memiliki pemahaman relasional kategori sedang dengan perolehan persentasi rata-rata sebesar 4,26% dan mahasiswa yang memiliki pemahaman relasional kategori tinggi dengan perolehan persentasi rata-rata sebesar 0%.