Wind energy and energy potential assessment on Ambon Island Lory Marcus Parera; Abhi Rizky Heluth; Mey Chintya Yesaya; Johanis Leuwol
Bulletin of Electrical Engineering and Informatics Vol 15, No 1: February 2026
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/eei.v15i1.10907

Abstract

Ambon Island has a high dependence on fossil fuels, which causes environmental and energy security problems, even though the potential for renewable energy, especially wind, is enormous according to national energy plan data. This study aims to assess the technical and economic feasibility of wind energy development in Latuhalat Village as a case study. Wind speed and direction data for the period January-December 2024 from the Ambon Maritime Meteorological Station were analyzed, showing that the prevailing winds are from the east and southeast. Assuming an air density of 1.225 kg/m³, a turbine efficiency of 35%, and a rotor sweep area of 78.54 m², the estimated annual energy reaches 24,528 kWh. A capacity factor of 30% results in a realistic output of 7,358 kWh/year. A horizontal-axis wind turbine with inverse taper blades is recommended to suit local wind characteristics, producing 0.7-46.8 kW of power with a system efficiency of 67%. This study concludes that Latuhalat Village has viable wind energy potential for further development. Its implementation requires a holistic approach encompassing technical, economic, social, and policy aspects to support sustainable energy transition on Ambon Island.
PERANCANGAN SISTEM KELISTRIKAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) OFF-GRID DI DUSUN KODAMRAA DESA ROHMONI KECAMATAN PULAU HARUKU Jihan Amelia Wasahua; Lory Marcus Parera; Marselin Jamlaay
JURNAL SIMETRIK Vol 16 No 1 (2026): Jurnal Simetrik (Sipil, Mesin, Listrik)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v16i1.3817

Abstract

This study aims to design an Off-Grid Solar Power Plant (PLTS) system in Kodamara Hamlet, Rohomoni Village, Pulau Haruku District, which is not yet connected to the PLN electricity grid. This PLTS is designed to utilize solar energy as a renewable energy source. The study began with data collection regarding daily energy consumption and location characteristics. This data was then processed to calculate the daily energy load and optimal system capacity. The analysis results show that the total daily energy requirement reaches 16,452 Wh with a peak load of 2,582 W. The designed PLTS system consists of 16 350 Wp monocrystalline solar panels, 2 units of 75V/15A MPPT Solar Charge Controllers (SCC), 18 units of 48V/1000 Ah OpzV batteries combined in parallel, and 3 units of 5000W inverters. This design is considered feasible to provide an independent and sustainable electricity supply, as well as contributing to improving the quality of life of the people in Kodamara Hamlet through the use of environmentally friendly solar energy. Keywords: Off-Grid, Solar Energy, System Planning, Peak Sun Hour
Perencanaan Pembangkit Listrik Tenaga Surya On Grid di Desa Porto, Kabupaten Maluku Tengah Lory Marcus Parera; Boby Kainama
JURNAL SIMETRIK Vol 16 No 1 (2026): Jurnal Simetrik (Sipil, Mesin, Listrik)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v16i1.3836

Abstract

Solar energy is a promising renewable energy source for development, particularly through grid-connected solar power plant systems. This study aims to analyze the potential and design a grid-connected system to efficiently meet electricity needs. The methodology employed includes system capacity design, component selection, and performance simulation using PVSyst software. The design and simulation results indicate that a 135 kWp solar power plant system can generate 214.6 MWh of energy per year with a Performance Ratio (PR) of 84.88%. This PR achievement indicates an excellent level of system efficiency in converting solar energy into electricity that is fed into the grid. Thus, the designed grid-connected solar power system is feasible for implementation and contributes significantly to the provision of clean energy and the reduction of carbon emissions. Keywords: On-Grid PLTS, Pvsyst, Performance Ratio