Claim Missing Document
Check
Articles

Found 33 Documents
Search

RANCANG BANGUN SIMULATOR SURYA MENGGUNAKAN HIGH POWER LED Julian; Paris Ali Topan; Masyitah Aulia; Muhammad Hidayatullah
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i01.1747

Abstract

So far solar panel testing has been carried out using sunlight which is strongly influenced by weather factors. This research was conducted with the aim of designing and assembling a simple solar simulator using HPL. The method used is to combine six different colors of HPL with different convex lenses with certain tilts and angles so that the light rays can blend together . The results obtained are solar panels can produce the highest voltage value of 17.58 volts, the highest current value of 0.0140 amperes and the highest power value of 0.2430 watts with a luminance level of 900 lm. The solar simulator that was tested could not make the solar panel produce an output of 5 watts due to several factors such as the distance of the light source to the solar panel, the number of colors of the LED lights that were lit (spectrum and intensity of light), the angle of light and the lens used.
RANCANG BANGUN TURBIN AIR TIPE CROSSFLOW DAN PENGARUH KETINGGIAN AIR TERHADAP EFISIENSI TURBIN UNTUK PEMBANGKIT LISTRIK TENAGA PIKOHIDRO Yogi Permana; Ahmad Jaya; Muhammad Hidayatullah; Nova Aryanto
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i01.1770

Abstract

Pico Hydro Power Plant (PLTPH) is one of the innovations for the use of alternative energy so that it can increase the role and potential of existing water energy sources in an area. The research method used is the experimental method by doing type water turbine design cross flow as a prime mover for a Laboratory-scale Pico-Hydro Power Plant. There are 2 parameters for the success of this study, namely being able to make a cross flow type water turbine with a turbine rotational speed of 100 Rpm and varying the water level to determine the performance of a cross flow type water turbine. The results of the water turbine design crossflow with a diameter of 15 cm, the number of turbine blades type cross flow 13 blades, the rotational speed of the turbine without load is 299.5 Rpm while the turbine rotation with an AC generator load is 195.5 Rpm, the power generated is 0.509 Watt with a turbine efficiency of 1.5%.
PERBAIKAN TEGANGAN PENYULANG KARUMBU DENGAN METODE PECAH BEBAN PADA PT. PLN (PERSERO) ULP WOHA YASYFIN NUR MUHAMMAD; Indra Darmawan; Titi Andriani; Muhammad Hidayatullah
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.2177

Abstract

The electrical energy that is distributed to customers is connected to the distribution network. Within the scope of the electricity distribution network, there are problems, namely the rating capacity that exceeds the feeder load and the length of the network on the feeder. This is dangerous because the load being served is too far away, and the excessive load will increase the current flowing through the conductor. so that it causes the voltage to drop to the customer, and if there is a feeder disturbance, it will expand the blackout area. Power loss is a problem that has always been faced by PT. PLN (Persero) and is unavoidable. This is also similar to the conditions that occurred at PT. PLN (Persero) ULP Woha, where the load on the Karumbu feeder is too heavy with a capacity of up to 91 amperes and a feeder length of 167 kMs. One of the solutions offered is the need to solve the feeder and plan for the construction of the Monta switch substation to reduce the load and length of the Karumbu feeder by simulating using ETAP 12.6.0 software. Based on the simulation results using the ETAP 12.6.0 software, the voltage at the end of the Karumbu feeder was obtained from 18.087 kV to 18.885 kV after solving the feeder load. The benefits that will be obtained later are reducing the burden on the Karumbu feeder and improving the voltage on the 20 kV and customer sides.
ANALISIS RUGI-RUGI DAYA AKIBAT SHADOW PADA PHOTOVOLTAIC DI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) SENGKOL, LOMBOK TENGAH Aprizal Rizki; Ahmad Jaya; Nova Aryanto; Muhammad Hidayatullah
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3094

Abstract

Pembangkit Listrik Tenaga Surya on grid Sengkol, Lombok Tengah, Nusa Tenggara Barat(NTB) tersusun dari kumpulan modul surya (photovoltaic), array, inverter, kabel string, danperalatan pengaman yang dirangkai dalam satu kesatuan sistem. Masing-masing darikomponen tersebut memiliki peran dalam menyalurkan energi listrik yang dihasilkanphotovoltaic ke PLN. Terdapat banyak masalah yang terjadi pada PLTS Sengkol, salah satumasalah yang sering terjadi adalah terjadinya losses atau rugi-rugi daya pada photovoltaicyang disebabkan oleh shadow (bayangan) yang menutupi photovoltaic. Lossesmerupakan kebocoran daya atau daya yang hilang di sepanjang jalur penyaluran tenagalistrik. Penelitian ini bertujuan untuk memaksimalkan daya listrik yang dihasilkan olehPLTS. Bayangan adalah suatu cahaya terhalang sesuatu benda, maka terbentuklah bayangbayang. Beberapa penelitian menunjukkan produksi listrik yang dihasilkan photovoltaicmengalami penurunan karena adanya efek bayangan, hal ini berlaku jika diamatai padaphotovoltaicKarena semakin kecil losses yang terjadi, maka semakin besar produksi dayalistrik yang dihasilkan. Bayangan disebabkan oleh terjadinya gerak semu matahari. Geraksemu matahari disebabkan oleh rotasi bumi berada pada porosnya dimana bumi berputar dariarah barat ke timur sehingga seolah-olah matahari bergerak dari timur ke barat. Metode yangdigunakan pada penelitian ini adalah adalah metode kuantitatif yaitu metode yangmenghitung dan menganalisa losses yang terjadi. Berdasarkan hasil perhitungan dan analisayang telah dilakukan diperoleh rugi-rugi daya akibat bayangan sebesar 1,98% yangdihasilkan oleh photovoltaic. Rugi-rugi daya sebesar 1,98% dinyatakan masih berada padanilai aman
Arduino, Driver Motor, Receiver, Relay, Remot Kontrol. Yogi Febriansyah Yogi; Muhammad Hidayatullah; Indra Darmawan; Desi Maulidyawati
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3158

Abstract

Alat pemotong rumput merupakan alat yang digunakan untuk memotong rumput pada halaman luas, dalam pengoperasiannya alat ini masih digunakan secara manual. Pada penelitian ini telah dibuat alat pemotong rumput dengan kendali jarak jauh (Remote Control) yang bertujuan untuk memudahkan pengguna pada saat memotong rumput. Metode yang digunakan pada penelitian ini adalah metode eksperimen. Hasil penelitian yang didapatkan dalam perancangan alat pemotong rumput ini menggunakan beberapa komponen utama yaitu Receiver yang berfungsi untuk menerima sinyal dari remot kontrol, Arduino yang berfungsi untuk menerima dan mengirimkan sinyal pada komponen lainnya, Motor Driver yang berfungsi untuk mengontrol kecepatan Motor DC sebagai penggerak alat pemotong rumput dan Relay yang berfungsi untuk mengontrol ON dan OFF Motor DC yang sebagai penggerak pisau pemotong. Alat pemotong rumput dapat dikendalikan menggunakan remot kontrol hingga jarak 300 meter pada area yang datar dan tidak berbatu.
Rancang Bangun Alat Penyiram Tanaman Otomatis Menggunakan Sistem IoT pada Tanaman Bonsai Dandi Azhari; Muhammad Hidayatullah; Paris Ali Topan; Desi Maulidyawati
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3166

Abstract

Bonsai plants are miniature trees that require care and water for their growth process. Watering the plants still uses manual watering techniques which are carried out at certain time intervals where sometimes the volume of water and the time of watering are not appropriate which causes disruption to the growth of the plants. The aim of this research is to create a time-based automatic plant watering system that can monitor soil moisture levels remotely. The method used is a quantitative experimental method which is preceded by an observation step followed by the design of an automatic watering system. Capacitive soil moisture sensors are used to monitor soil moisture levels. Real Time Clock (RTC) is used to run the timing functions that control the system. If the time has reached the predetermined limit, the system will send a notification via the Telegram application that the tool has worked automatically. Based on the research results, the data sent by the system to the telegram application is in the form of soil moisture values. At 7.00 the system works with a soil moisture value of 56% and at 7.05 the system stops working with a soil moisture value of 66%. At 16.00 the system will work with a soil moisture value of 59% and at 16.05 the system will stop working with a soil moisture value of 67%. In general, this system can work well and efficiently.
SIMULASI PLTS HYBRID MENGGUNAKAN SYSTEM ADVISOR MODEL (SAM) DI KEDAI BOBA SUMBAWA BARAT Rifki wikra wardana; Muhammad Hidayatullah; Paris Ali t; Titi Andriani
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3208

Abstract

Kedai Boba merupakan usaha yang membutuhkan energi listrik yang cukup besar seperti lampu ruangan, lampu jalan, lampu hias, alat pres dan kulkas, sehingga mengeluarkan biaya pembayaran listrik yang besar. Untuk menganalisa biaya kelistrikan dilakukan penelitian di kedai boba dengan melakukan simulasi PLTS hybrid menggunakan Software SAM. Hasil simulasi menunjukan cuaca yang mendukung atau radiasi matahari pada lokasi tersebut cukup tinggi. Pada bulan September radiasi sinar matahari sangat tinggi hingga menghasilkan daya sebesar 190kWh dan paling rendah pada bulan Desember sebesar 132kWh. Kebutuhan daya pada kedai boba sekitar 2,38kWh/hari berdasarkan perhitungan pada beban setiap bulan di kedai boba sesuai data pada PT. PLN (Persero) ULP Taliwang. Apabila PLTS dengan panel surya berkapasitas 300Wp berjumlah 4 unit, baterai VRLA Gel 12V x 100AH berjumlah 4 unit dan disimulasikan sesuai dengan data cuaca pada lokasi kedai boba menghasilkan sekitar 1,933kWh per hari dalam satu tahun dan biaya pembangunan PLTS sebesar $4,592. Penerapan PLTS hybrid pada kedai boba akan sangat baik, dikarenakan sebagian besar dapat dibackup oleh PLTS dan hanya sebagian kecil memerlukan energi dari PLN sehingga biaya kelistrikan yang harus dikeluarkan hanya sebesar Rp.76.569,1 dalam 1 tahun.
ANALISIS PERBANDINGAN PENGGUNAAN ENERGI LISTRIK KWH PRABAYAR DAN KWH PASCABAYAR DI DESA MBAWA KABUPATEN BIMA Suaedin Indra Permatu Adi; Muhammad Hidayatullah; Paris Ali Topan; Nova Aryanto
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3218

Abstract

The purpose of this study was to determine the comparison of cost and usage differences between prepaid kWh and postpaid kWh. This research was conducted in Mbawa Village. Data collection in this study was carried out observation and interviews to prepaid and postpaid consumers. The number of respondents interviewed in this study were 20 respondents of prepaid and postpaid kWh users, including 10 respondents of 1300 VA postpaid kWh users and 10 respondents of 1300 VA prepaid kWh users. The method used in the research is mixed method. The results obtained after this study are that there is no significant cost difference in the results of hypothesis testing between prepaid and postpaid consumers of 1300 VA power because in hypothesis testing using a significant level value of 0.05 shows that the test results of a significant value> 0.05, namely 0.060. Based on the results of the calculation, there is a difference in the use of household electrical equipment power using kWh prepaid and postpaid 1300 VA power where the average power usage of prepaid consumer electrical equipment is 1567 Watts and in postpaid consumers with an average usage of electric power of 1603 Watts.
A Analisis Efektivitas Penggunaan Marine Fuel Oil (MFO) Terhadap Parameter Siklus Kerja Performa Mesin Diesel pada PT. Sumber Rejeki Power, Sumbawa Besar Syamsul Hidayat; Muhammad Hidayatullah; Ahmad j; Paris Ali Topan
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3243

Abstract

Efektivitas biaya bahan bakar pada pembangkit merupakan hal yang sangat penting untuk mengoptimalkan pemakaian sumber daya dan mengurangi dampak lingkungan. Tujuan penelitian ini akan melakukan analisis nilai penggunaan bahan bakar MFO pada pembangkit listrik tenaga diesel. Metode pengumpulan data dilakukan melalui pengujian di lapangan dan pengambilan data dari studi kasus pada mesin diesel yang beroperasi dengan MFO. Data kinerja mesin diesel dengan MFO kemudian dianalisis menggunakan metode statistik dan perbandingan dengan standar yang berlaku di PT Sumber Rejeki Power. Hasil pelrhitulngan total Nilai MFO dalam 1 hari adalah 137.875 Liter, dengan biaya sebesar Rp 1.126.714.500,00. Rata-rata pemakaian bahan bakar di tunjukan pada pukul 09:00 hingga 00:00 dengan nilai MFO 5.750 Liter dan biaya sebesar Rp 46.989.000,00. Untuk pemakaian tertinggi MFO ditunjukan pada pukul 05:00 dengan nilai MFO 5.825 Liter dan biaya sebesar Rp 47.601.900,00. Dan untuk pemakaian terendah MFO ditunjukan pada pukul 01:00 dengan nilai MFO 5.650 Liter dan biaya sebesar Rp 46.171.800,00. Dari hasil analisa diatas dapat ditarik kesimpulan bahwa penggunaan bahan bakar MFO untuk SFC tidak lebih dari 0,25 (sesuai ketentuan perusahaan) jadi dapat dikategorikan bahwa performa mesin pembangkit di PT Sumber Rejeki Power masih efektif dalam produksi kWh.
PERENCANAAN ENERGI TERBARUKAN DI UNIVERSITAS TEKNOLOGI SUMBAWA PADA TAHUN 2042 MENGGUNAKAN PENDEKATAN LONG- RANGE ENERGY ALTERNATIVE PLANNING SYSTEM (LEAP) Aris Satria; Desi Maulidyawati; Muhammad Hidayatullah; Ahmad Jaya
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3280

Abstract

Energi surya memiliki potensi yang sangat baik untuk diterapkan di wilayah Indonesia, mengingat wilayah Indonesia cukup luas dan berada di garis khatulistiwa sehingga intensitas mataharinya cukup stabil dengan rata-rata sekitar 4,8 kWh/m2 per hari di seluruh Indonesia. Dengan potensi energi surya yang cukup baik, maka dilakukanlah penelitian perecanaan energi surya di Universitas Teknologi Sumbawa (UTS) hingga 20 tahun kedepan dengan Simulasi menggunakan software Long-Range Alternative Planning System (LEAP).Metode eksperimen yang digunakan dalam penelitian ini. Untuk metode perencanaan yang digunakan dalam penelitian ini adalah metode end-use dan berfokus pada pengumpulan data kebutuhan energi listrik di UTS. Kemudian data di analisis untuk merencanakan penggunaan energi terbarukan di UTS menggunakan software LEAP. Kebutuhan energi listrik selama 20 tahun kedepan di gedung rektorat Universitas Teknologi Sumbawa (UTS) pada skenario BAU sebesar 879.911 kWh, skenario 1 sebesar 1,942.879 kWh dan skenario 2 sebesar 2,362.618 kWh. 2Dari hasil Simulasi pada setiap skenario, maka diketahui bahwa dengan adanya PLTS dapat membantu mengurangi penggunaan energi dari PLN yang jika ditotalkan pada masing-masing skenario yaitu, skenario BAU sebesar 7,163.860 kWh. pada skenario 1 yaitu sebesar 5,316.856 kWh, sedangkan pada skenario 2 pengeluaran bahan bakar yang didapatkan yaitu sebesar 4,387.383 kWh.