PENERAPAN KEPPRES NOMOR 80 TAHUN 2003 DALAM PROSES PEMILIHAN PEMENANG TENDER PROYEK KONSTRUKSI DI SUMATERA BARAT Martalius Peli; Vivi Ariani
Rekayasa Sipil Vol 14, No 3 (2020)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2020.014.03.4

Abstract

Tender is a competition system for selecting contractors who will carry out development activities. The mistake of the tender committee in choosing a contractor will cause losses to the project owner. To avoid that mistake, the tender committee must know the capabilities and quality of the contractor, so an assessment of the capabilities of the contractor (construction service) is needed. This research was conducted only for the tender process of physical work and the questionnaire was given to 50 contractor companies in West Sumatra to determine the weight of seven criteria of the most important assessment process in tender tenders in accordance with Presidential Decree No. 80 Republic of Indonesia year 2003 (Keputusan Presiden No. 80 tahun 2003). 50 questionnaires are distributed with result 43 returned questionnaires showed that the assessment criteria for implementation time had the highest percentege of 19% followed by work methods and experts with a percentege of 17% and subsequently company capital with a percentege of 16%, and working capital received the fourth demand with a percentage of 11%, while the company's experience and ranks last is equipment with a percentege of 10%.
IDENTIFIKASI RISIKO PADA PROYEK WASTE TO ENERGY MELALUI KERJASAMA PEMERINTAH DENGAN BADAN USAHA DI SUMATERA BARAT Sesmiwati Sesmiwati; Wahyudi Putra Utama; Martalius Peli
Rekayasa Sipil Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2022.016.02.7

Abstract

Waste to energy (WTE) project is a solution to solve energy crisis and at the same time may resolve the waste problem. Public private partnership (PPP) scheme has been widely used to deliver WTE project. The success of PPP projects heavily relies on the advisability of management and risk sharing.  Risk management needed to conduct in order to understand specific risks, examine risk sharing between government and public sector and analyze risk mitigation for preventing and rectifying the impact. The effective decision on risk needed to improve decision-making process that may occur in the WTE projects. Therefore, this study identify risk probability in PPP WTE projects in West Sumatera. This probability relying on expert judgement were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 21 risk factors that impact the success of PPP WTE projects as gleaned from previous research. The overall result ranked risk probability factors that land acquisition and administration approval risk, public opposition, construction cost overrun, operating cost overrun, and design/construction/commissioning performance risk are the top five risk factors affecting the sustainable development of PPP WTE Projects. A better understanding of the risk may improve project feasibility and attract private sector for investing in WTE projects.