Claim Missing Document
Check
Articles

Found 16 Documents
Search

Perancangan Sistem Pengendalian Beban Dari Jarak Jauh Menggunakan Smart Relay Pefrianus Bunga; Marthinus Pakiding; Sartje Silimang
Jurnal Teknik Elektro dan Komputer Vol. 4 No. 5 (2015): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v4i5.9989

Abstract

Abstrack-- In the electrical grid system that we often encounter, not all of them have a breaker that can be controlled through a centralized control system. In the wider area, generally wear control system, known as Supervisory Control and Data Acquisition (SCADA). However, for small electrical networks such as medium industries, not all of them have a facility like this, because to build a SCADA system requires a very large cost, Responding to the above problems is certainly a need for a breakthrough to establish a electrical load control system far distance that can be applied to the electricity network. One alternative that can be done is to use the Smart Relay as the control and monitoring can be integrated with the computer. Keywords : Circuit Breaker, control and monitoring, Supervisory Control & Data Acquisition, , Smart Relay Abstrak-- Pada sistem jaringan listrik yang sering kita jumpai, tidak semuanya memiliki alat pemutus yang dapat dikendalikan melalui suatu sistem kontrol yang terpusat. Pada area yang lebih luas, umumnya sudah memakai sistem kontrol yang dikenal dengan Supervisory Control & Data Acquisition (SCADA) . Namun untuk jaringan listrik yang kecil seperti industri menengah, tidak semuanya memiliki fasilitas seperti ini, karena untuk membangun sistem SCADA memerlukan biaya yang sangat besar, Menyikapi permasalahan diatas tentunya dibutuhkan suatu terobosan untuk membangun suatu sistem pengontrolan beban dari jarak jauh yang dapat diaplikasikan pada jaringan listrik. Salah satu alternatif yang bisa lakukan adalah menggunakan Smart Relay sebagai media pengontrolan dan monitoring yang dapat diintegrasikan dengan komputer. Kata Kunci : pengontrolan dan monitoring, pemutus beban, Supervisory Control & Data Acquisition, , Smart Relay,
Rancang Bangun Sistem Kontrol Otomatis Dan Pengamatan Kondisi Baterai Pada Sistem Pembangkit Listrik Berbasis Microcontroller Tri B.O. Simanjuntak; Glanny M.Ch. Mangindaan; Marthinus Pakiding
Jurnal Teknik Elektro dan Komputer Vol. 6 No. 2 (2017): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v6i2.16655

Abstract

Abstract— The need and consumption of electric power from year to year continues to grow. This condition makes the power plant should continue to maintain the reliability to provide electricity when needed. In the power plant system there is also a DC system that has an important role. DC systems using batteries currently in maintenance still rely on dispatchers who have high human error rates. To help with this problem, a microcontroller based control and observation system is designed which will provide information in the form of current, voltage, temperature and indicator if one of the batteries is discharged.Keywords: Automatic Control, DC System, Direct Current, Microcontroller, Monitoring, Observation Control, Power Plant, System Battery, Temperature, Voltage. Abstrak— Kebutuhan maupun konsumsi daya listrik dari tahun ke tahun terus bertambah. Kondisi ini membuat pusat pembangkit tenaga listrik harus terus menjaga keandalan untuk menyediakan listrik saat dibutuhkan. Didalam sistem pembangkit listrik terdapat juga sistem DC yang mempunyai peran penting. Sistem DC menggunakan baterai saat ini dalam pemeliharaannya masih mengandalkan petugas operator yang punya tingkat kesalahan manusia yang tinggi. Untuk membantu permasalahan ini maka dirancanglah sistem kontrol dan pengamatan baterai berbasis microcontroller yang akan memberikan informasi berupa arus, tegangan, suhu dan indikator jika salah satu baterai terlepas.Kata kunci: Arus Searah, Kontrol Otomatis, Microcontroller, Monitoring,  Pembangkit Listrik, Pengamatan Baterai, Sistem DC, Sistem Kontrol, Suhu,  Tegangan.
Analisa Efisiensi Thermal Pembangkit Listrik Tenaga Panas Bumi Lahendong Unit 5 Dan 6 Di Tompaso Gerry A. Kusuma; Glanny Mangindaan; Marthinus Pakiding
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 2 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i2.19614

Abstract

Abstract—  A geothermal power plant (PLTP) is a plant that uses vapor in the earth as the main energy. Vapor which in the earth is supplied from production well through steam transmission system which then passing steam receiving header. When there is excessive pressure in the steam receiver, then the steam will be dump away to Vent Structure. Steam then get flowed to the Separator which serves to separate the vapor with water. The separation water is called brine. Brine from separator is streamed to the settling basin. Then vapor comes in to the Scrubber, which serves to separate moisture that contained in vapor, so then the vapor is expected clean and dry, which will be include in the steam turbine. A geothermal power plant (PLTP) especially PLTP 5 and 6 Lahendong are the new built geothermal power plant as part of the 35.000 MW program from the government. Therefore need to know how much the thermal efficiency that contain in the power plant and how to increase its efficiency. This research will discuss thermal efficiency analysis of PLTP 5 and 6 Lahendong through state level analysis with a thermodynamic approach and analysis in each process of the plant.Keywords: Geothermal Plant, Thermal Efficiency, Thermodynamic, Vapor.Abstrak­— Pembangkit Listrik Tenaga Panas Bumi (PLTP) adalah pembangkit yang menggunakan energi panas dari dalam bumi. Uap panas dari dalam perut bumi di suplai dari sumur produksi melalui sisterm transmisi uap yang kemudian melewati steam receiving header. Bila terjadi tekanan berlebih di dalam steam receiver maka uap akan dibuang melalui Vent Structure. Dari Steam Header uap kemudian dialirkan ke separator yang berfungsi untuk memisahkan uap dengan air. Air hasil pemisahan tersebut disebut brine. Brine dari separator tersebut kemudian dialirkan meuju ke kolam pengendapan atau Settling Basin. Kemudian uap masuk ke Scrubber, yang berfungsi untuk memisahkan moisture yang terkandung dalam uap, sehingga diharapkan uap bersih dan kering yang akan masuk ke dalam Turbin uap. Pembangkit Listrik Tenaga Panas Bumi (PLTP) khususnya PLTP 5 dan 6 Lahendong merupakan unit pembangkit yang baru dibangun sebagai bagian dari program 35.000 MW dari pemerintah. Sebab itu perlu diketahui berapa besar efisiensi thermal yang terdapat di pembangkit tersebut dan cara peningkatan efisiensinya. Penelitian ini akan membahas analisa efisiensi thermal dari PLTP 5 dan 6 Lahendong melalui analisa tingkat keadaan dengan pendekatan termodinamika dan analisa di tiap proses pembangkit tersebut. Kata Kunci : Efisiensi Thermal, PLTP, Termodinamika, Uap Panas
Penataan Dan Pengembangan Instalasi Listrik Fakultas Teknik UNSRAT 2017 Andersen D. Prok; Hans Tumaliang; Marthinus Pakiding
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 3 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i3.20767

Abstract

Abstract— Electrical installation is one part of the power system, its application to buildings and electrical equipment. Can help distribute electrical energy to be used by consumers. To install of installations suitable for general use of electrical installation (PUIL), Indonesian National Standart (SNI), and aesthetic neatness of installation. Problems in electrical installation are still widely found in the field, in the faculty of UNSRAT techniques found probles in the installation of electrical installation, such as the neatness of the electrical installation path and the setting in the faculty of engineering building. This problems can not be shared, so the power obtained can not be utilized as it should be. Recognized with the problems of electric power installation in the faculty of engineering I took the title oft thesis “Arrangement And Development Of Electricity Faculty Of Engineering UNSRAT 2017”. From my research on electrical installation in the main buildings of faculty of UNSRAT technique, found the division in the main building faculty of UNSRAT engineering not per floor erratic. Observation made to know the division path, Main Panel Distribution (MDP) and Sub Panel Distribution (SDP). Structuring needs to be done for the appropriate division, according to the standarts and potential of  solar cell development as a backup source in the engineering faculty can be considered for the foreseeable future.   Keywords : Development, Electric Power Installation, Faculty Of Engineering UNSRAT, Structuring.Abstrak— Instalasi listrik merupakan salah satu bagian dari sistem tenaga listrik, penerapannya terhadap bangunan dan peralatan tenaga listrik. Instalasi listrik membantu menyalurkan energi listrik agar dapat digunakan oleh konsumen. Pemasangan instalasi listrik yang sesuai standar harus menggunakan persyaratan umum instalasi listrik (PUIL), Standart Nasional Indonesia (SNI) serta estetika kerapihan pemasangan. Masalah dalam instalasi tenaga listrik masih banyak ditemukan dilapangan, di fakultas teknik unsrat ditemukan masalah dalam pemasangan instalasi listrik yang dilakukan, antara lain masalah kerapihan jalur instalasi listrik, dan pengaturan pembagian beban di gedung fakultas teknik, masalah ini mengakitbatkan pembagian tiap fasa tidak seimbang sehingga daya yang didapat tidak dapat di manfaatkan sebagai mana mestinya. Berdasarkan dengan masalah instalasi tenaga listrik di fakultas teknik saya mengambil judul skripsi “ Penataan dan Pengembangan Instalasi Listrik Fakultas Teknik Unsrat 2017”. Dari penelitian yang saya lakukan terhadap masalah instalasi listrik di bangunan utama fakultas teknik unsrat, di temukan pembagian beban di gedung utama fakultas teknik unsrat tidak per lantai melainkan tidak menentu, Observasi yang dilakukan bertujuan untuk mengetahui jalur pembagian beban, besaran arus pada Main Distribution Panel (MDP) serta  Sub Distribution Panel (SDP). Penataan perlu dilakukan untuk pembagian beban yang seimbang dan sesuai standar dan potensi pengembangan solar cell sebagai sumber daya cadangan di fakultas teknik dapat di pertimbangkan untuk kedepan.Kata kunci— Fakultas Teknik UNSRAT, Instalasi tenaga listrik, Penataan, Pengembangan.
Perencanaan Dan Pemenuhan Kebutuhan Energi Listrik Di Kota Bitung Andre C. Koloay; Hans Tumaliang; Marthinus Pakiding
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 3 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i3.22504

Abstract

 Abstrack-- The higher the economic activity will be the greater the need for electrical energy. In line with the increasing energy demand in the area needed to generate electrical energy needs in the future. Energy demand planning is not required as data required for the electrical system development process, but also required to meet the needs of the city of Bitung in accordance with the needs.The use of electric power will always increase every year. This is due to the growing needs of the public who must be oral. Many factors affect the level of electricity demand, such as economic factors, population, territoriality, and others. It is necessary to plan the right target to prepare the need for electrical energy in the future so that the development of village development is fulfilled. Then directly or indirectly, it will affect the economic growth and the welfare of society. Key Word -- Electrical energy needs, Electricity use, Electricity supply in Bitung City, Planning of electrical energy system.  Abstrak-- Semakin tinggi aktifitas ekonomi maka akan semakin besar kebutuhan akan energi listrik. Sejalan dengan peningkatan kebutuhan energi listrik pada suatu wilayah maka dibutuhkan perencanaan untuk memenuhi kebutuhan energi listrik di waktu mendatang. Perencanaan kebutuhan energi listrik tidak saja diperlukan sebagai data masukan bagi proses perencanaan pembangunan suatu sistem kelistrikan, tetapi juga diperlukan untuk pengoperasian sistem tenaga listrik dalam penyediaan energi terutama yang ada di Kota Bitung sesuai dengan kebutuhan.Penggunaan tenaga listrik diperkirakan akan selalu meningkat setiap tahunnya. Hal ini dikarenakan oleh semakin berkembangnya kebutuhan masyarakat yang harus dipenuhi. Banyak faktor yang berpengaruh terhadap tingkat kebutuhan tenaga listrik, seperti faktor ekonomi, kependudukan, kewilayahan, dan lain-lain. Sehingga membutuhkan suatu perencanaan yang tepat sasaran untuk mepersiapkan kebutuhan energi listrik kedepannya agar perkembangan pembangunan daerah tercukupi. Kemudian secara langsung maupun tidak langsung, hal itu  akan mempengaruhi pertumbuhan ekonomi dan kesejahteraan masyarakat. Kata kunci -- Kebutuhan energi listrik, Penggunaan tenaga listrik, Penyediaan energi listrik di Kota Bitung, Perencanaan sistem energi listrik.
Analisis Unjuk Kerja Sistem Produksi Listrik Pada Pembangkit Listrik Tenaga Diesel Waena Anton Ilintamon; Marthinus Pakiding; Hans Tumaliang
Jurnal Teknik Elektro dan Komputer Vol. 8 No. 3 (2019): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v8i3.26593

Abstract

Abstract __ With the increasing need for electrical energy, the efficiency and reliability of a diesel power plant is also directly proportional to the savings in electricity energy requirements. Performance analysis is something that is achieved, achievements are shown or the work capability of the Waena diesel power plant, efficiency is the result of a comparison between achievements with the resources used to produce these achievements. Reliability is an indicator of the level of capability, smoothness, durability and security of Waena diesel power plants, in their operations to produce KWH electricity) according to the planned needs or targets. The electricity production system produced at Waena diesel power plant for 1 year period, for 2018 amounted to 30,763,659 Kwh / year.             Keywords __ Performance Analysis; Efficiency; Reliability; Electricity production system in  PLTD Waena. ABSTRAK __ Dengan meningkatnya kebutuhan energi listrik maka efisiensi dan keandalan suatu pembangkit listrik tenaga diesel juga berbanding lurus dengan penghematan kebutuhan energi listrik. Analisis unjuk kerja (Performance) adalah sesuatu yang dicapai, prestasi yang diperlihatkan atau kemampuan kerja pembangkit listrik tenaga diesel PLTD Waena, efisiensi adalah hasil perbandingan antara capaian dengan sumber daya yang digunakan untuk mengahasilkan capaian tersebut. Keandalan merupakan suatu indikator tingkat kemampuan, kelancaran, ketahanan maupun keamanan pembangkit listrik tenaga diesel Waena, dalam operasinya untuk memproduksi tenaga listrik KWH) sesuai keperluan atau target yang telah direncanakan. Sistem produksi listrik yang dihasilkan pada pembangkit listrik tenaga diesel Waena periode 1 tahun, untuk tahun 2018 sebesar 30.763.659 Kwh/tahun.Kata kunci __ Analisis Unjuk Kerja; Efisiensi; Keandalan; Sistem produksi listrik pada PLTD Waena.