Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Teknik Industri Terintegrasi (JUTIN)

Pemodelan proses kerja turnaround pabrik menggunakan Business Process Model Notation (BPMN) Rochmatullah, Faris Yasin; Waluyo, Minto
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.39994

Abstract

This study aims to model the work process of factory turnaround using Business Process Model Notation (BPMN) at PT XYZ, which is the largest producer of urea fertilizer in Southeast Asia. Turnaround maintenance is a repair activity carried out when the factory is in a state of shutdown, with the aim of restoring factory performance in accordance with the desired design capacity. Through BPMN modeling, this study identifies critical stages in the process of planning, prepare, implementing, and evaluating turnarounds, as well as potential risks that can affect the smooth running of production. The results of the analysis show that this modeling not only improves the understanding of the workflow, but also helps in more effective decision-making. Thus, the implementation of BPMN at PT XYZ is expected to improve operational efficiency and reduce production disruptions, which in turn has a positive impact on the availability of fertilizers for farmers. This research has made a significant contribution to the development of planned maintenance methodologies in the manufacturing industry.
Implementasi Job Safety Analysis (JSA) terhadap keselamatan kerja pada proyek pembangunan polder/pompa PT. XYZ Ardani, Natalia Caliysta; Waluyo, Minto
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 8 No. 1 (2025): January
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v8i1.39733

Abstract

JSA is Job Safety Analysis or JSA is a safety management technique that focuses on identifying hazards and controlling hazards related to a series of jobs or tasks to be performed. This study is a qualitative description with an in-depth case study approach on the PT XYZ polder/pump construction project to understand in detail the JSA implementation process. This study shows that the implementation of JSA on the pump house foundation work at the PT XYZ project has succeeded in reducing potential hazards and accident risks. The results of the study indicate that JSA is effective for use in reducing work accidents such as the stages of work items to hazard analysis and what aspects will occur to the controls used to overcome this. In the construction of polders/pumps, it can be concluded that each work item in JSA can be analyzed for follow-up with engineering control, administrative control, and PPE that must be used by workers.