Claim Missing Document
Check
Articles

Found 12 Documents
Search

Peningkatan Awareness Implementasi 5R pada UMKM Sepatu di Desa Mulyaharja Kota Bogor Pangestu, Fattah Jati; Hidayat, Agung Prayudha; Kartinawati, Annisa; Dardanella, Derry; Rahmawati, Novia; Santosa, Sesar Husen; Indrawan, Purana; Apriliani, Fany; Yusri, Doni; Sinaga, Antonya Rumondang; Pamungkas, Genta Yoga
Jurnal Pengabdian Masyarakat Bhinneka Vol. 4 No. 2 (2025): Bulan November
Publisher : Bhinneka Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58266/jpmb.v4i2.814

Abstract

Pengabdian kepada masyarakat ini bertujuan untuk meningkatkan kesadaran pelaku Usaha Mikro, Kecil, dan Menengah (UMKM) sepatu di Desa Mulyaharja, Kota Bogor, terhadap penerapan budaya kerja 5R (Ringkas, Rapi, Resik, Rawat, dan Rajin) sebagai upaya peningkatan efisiensi operasional dan keberlanjutan usaha. Kegiatan ini menggunakan pendekatan partisipatif dengan metode identifikasi kebutuhan, pelatihan, serta evaluasi berbasis pre-test dan post-test. Sebanyak 15 karyawan UMKM terlibat sebagai responden, menunjukkan peningkatan signifikan dari nilai rata-rata pre-test sebesar 35 menjadi 95 pada post-test. Hasil observasi menunjukkan adanya peningkatan dalam awareness implementasi 5R di lingkungan kerja. Program ini membuktikan bahwa implementasi budaya kerja 5R dapat dilakukan secara sederhana, efektif, dan tanpa memerlukan biaya tambahan yang signifikan. Oleh karena itu, disarankan agar program serupa dilaksanakan secara berkala, didukung oleh pembentukan tim internal 5R dan pendampingan berkelanjutan dari perguruan tinggi, guna menjamin keberlanjutan implementasi serta menjadikan Mulyaharja sebagai model bagi UMKM sektor lainnya.
ANALISIS KEANDALAN SISTEM DUMP DOOR MESIN BAGGING PHONSKA 5 MENGGUNAKAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE Abdul Aziz Rizal; Doni Yusri
JURNAL REKAYASA SISTEM INDUSTRI Vol 11 No 2 (2026): Mei 2026
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v11i2.11566

Abstract

The reliability of the Phonska 5 bagging machine is a crucial factor in ensuring smooth fertilizer packaging and minimizing production disruptions. The dump door system was identified as the largest contributor to failures (33%) in this unit. This study aims to analyze the reliability of the dump door system and determine appropriate maintenance strategies using the Reliability Centered Maintenance (RCM) approach. The analysis methods included system function identification, Failure Mode and Effect Analysis (FMEA), and evaluation of Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR) parameters. FMEA results showed that the sliding gate component had the highest Risk Priority Number (RPN) of 175, followed by the solenoid valve (120) and pneumatic piston (105). Reliability analysis indicated that the sliding gate had the highest MTBF of 6,243.71 hours, while the load cell had the shortest failure interval with an MTBF of 328.62 hours. The longest repair time was found in the solenoid valve with an MTTR of 20.93 hours, potentially causing significant downtime. The recommended maintenance strategy is Condition Directed Maintenance, implemented through an RCM Decision Worksheet, preventive maintenance checksheets, and One Point Lesson (OPL) to improve operational reliability