Claim Missing Document
Check
Articles

Found 17 Documents
Search

Model Development for Decision Making in Vegetables Distribution in Kabupaten Malang Oktiarso, Teguh
SPECTA Journal of Technology Vol 2 No 1 (2018): SPECTA Journal of Technology
Publisher : LPPM ITK

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35718/specta.v2i1.90

Abstract

Food supply chain especially vegetables supply chain must consider the speed of the deliveries due to freshness of the product. Reduced of the freshness of the vegetables faces the great risk of great loss for the farmer and the greengroceries. This paper aimed to develop model for multi criteria decision making based on time to solve vegetables distribution problems from farmers to greengroceries in Kabupaten Malang. Model for decision support system is aimed to determine the minimize delivery time for main vegetables in Kabupaten Malang. There are three variables on three echelons which effects on delivery time before the vegetables decay and worthless. A model for decision support system using real data from 8 sub districts in Kabupaten Malang are obtained to describe the optimal result for several situations in vegetables distribution in Kabupaten Malang to support the decision for distributing the vegetables from farmers to greengroceries with lower cost.
Penjadwalan Untuk Memininimalkan Total Tardiness Dengan Metode Integer Linear Programming Livia, Clara Yessica; Oktiarso, Teguh
Jurnal Teknik Industri Vol 18, No 2 (2017): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (281.635 KB) | DOI: 10.22219/JTIUMM.Vol18.No2.127-137

Abstract

Production scheduling is an important thing done in the company so that consumer demand is met on time. PT Mitra Mulia Makmur implements the scheduling principle of First Come First Serve in producing plastic container products. The scheduling applied is not yet effective and efficient because there are some late consumer demands. The delay in consumer demand is due to longer processing time than the specified time limit. In the study using Integer Linear Programming (ILP) method to minimize total tardiness (total tardiness). ILP was chosen as a method of solving delay problems. ILP can help the company’s decision-making process to achieve a purpose function by considering the constraints or constraints in the company. Linear Integer Programming method with the help of LINGO 16.0 software can produce improvements.
INISIATIF PENERAPAN ECO CAMPUS DI UNIVERSITAS MA CHUNG Hadi, Yuswono; Natasha, Felisitas; Purnomo, Purnomo; Ekawati, Yurida; Oktiarso, Teguh; Noya, Sunday; Putrianto, Novenda
Conference on Innovation and Application of Science and Technology (CIASTECH) CIASTECH 2020 "Peranan Strategis Teknologi Dalam Kehidupan di Era New Normal"
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perubahan iklim semakin parah. Bumi mengalami krisis iklim, salah satu penyebabnya adalah produksi gas rumah kaca. Salah satu solusi untuk mengurangi kerusakan iklim bumi adalah dengan menerapkan konsep eko-kampus pada institusi pendidikan setingkat Universitas. Kondisi perguruan tinggi menjadi sorotan karena tingginya aktivitas yang dapat merusak lingkungan. Karena itu, pemerintah merekomendasikan perguruan tinggi untuk menerapkan konsep eko-kampus. Kampus ramah lingkungan adalah tindakan yang diambil oleh institusi pendidikan tinggi yang berfokus pada pengurangan jejak karbon yang diciptakan oleh penggunaan energi. Universitas Ma Chung adalah salah satu dari sekian banyak universitas di seluruh Indonesia yang menerapkan konsep eko-kampus. Alat pemeringkatan yang digunakan adalah UI GreenMetric World University Ranking. Program yang direncanakan dan tahap persiapan Ma Chung mendapatkan skor 2.775 di UI GreenMetric. Kesenjangan terbesar yang tercatat ada pada kategori Energi dan Perubahan Iklim yang berjumlah 1.600. Berdasarkan UI GreenMetric, jika semua program dijalankan maka Universitas Ma Chung bisa meraih 375 poin dengan total 3.150 poin. Universitas Ma Chung telah terdaftar di UI GreenMetric dan menyerahkan data eco kampus terbaru pada tahun 2020. Untuk meningkatkan penilaian lebih lanjut, program yang telah disiapkan akan dijalankan pada periode selanjutnya oleh tim eko kampus Universitas Ma Chung yang telah dibentuk. Tim Eco Campus akan bekerja sama dengan satgas kampus untuk melakukan review, diskusi dan penyerahan kembali program kepada pimpinan Universitas Ma Chung.
Peningkatan Kapasitas Produksi Petani Kopi Republik Tani Mandiri Hadi, Yuswono; Widiamsa, Adam Edward; Oktiarso, Teguh; Purnomo, Purnomo
Jurnal Pengabdian Masyarakat Charitas Vol. 2 No. 01 (2022): Jurnal Pengabdian Masyarakat Charitas Juni 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/charitas.v2i01.2573

Abstract

Republik Tani Mandiri (RTM) is group coffee farmers residing at Desa Kucur, Kab. Malang.The activity aimed to help RTM in increasing production capacity and train them to manage small business at early stage. Roasting process is the most critical process. After re-designing roasting machine and implementation, processing times reduce at 26,1%.
Literasi Pengelolaan Keuangan IKM Anggota Forum Komunikasi Pelaku Usaha di Kabupaten Malang Noya, Sunday; Ekawati, Yurida; Oktiarso, Teguh; Hadi, Yuswono; ,, Purnomo; Putrianto, Novenda Kartika
Jurnal Pengabdian Masyarakat Charitas Vol. 1 No. 2 (2021): Jurnal Pengabdian Masyarakat Charitas Desember 2021
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Katolik Indonesia Atma Jaya Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/charitas.v1i2.2863

Abstract

Although considered as one of the main drivers of the national economy, SMEs are very vulnerable to business competition. Limited access to resources including knowledge resources makes SMEs constrained to develop their support system. One of the obstacles faced by SMEs today is their limited grasp to the business financial management concept. They also have a difficulty in accessing a simple financial accounting application that fit to their business conditions. The community service program implemented by the Ma Chung Abdimas Grant Team aims to improve the financial literacy of SME members of Forum Komunikasi Pelaku Usaha in Kabupaten Malang, as well as their access to computer-based financial accounting application. This program is implemented in the form of training and mentoring to improve SME’s understanding and skills in financial management. The results concluded that the training program was effective. It is able to improve financial management literacy for IKM partners.
Analisis Produktivitas PT Torabika Eka Semesta Menggunakan Metode Objective Matrix dan Fault Tree Analysis Aurelia, Chika; Noya, Sunday; Oktiarso, Teguh
Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI) Vol. 3 No. 1 (2023): June 2023
Publisher : Teknik Industri Universitas Ma Chung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33479/jtiumc.v3i1.44

Abstract

PT Torabika Eka Semesta is a company producing healthy drinks and food. The existence of factories and various products certainly requires effectiveness and efficiency at work. The productivity level in the company is quite good, as seen from the achievement of the output target from January to December 2023 above 80%. The achievement of the output target can be caused by several things, such as off-production machines, delays in starting production, and output fluctuations. The purpose of doing productivity analysis is to discover the problems that affect productivity. The productivity analysis uses three methods: the Objective Matrix (OMAX), the Fault Tree Analysis (FTA), and the Analytical Hierarchy Process (AHP). The OMAX method is designed to calculate productivity values. The FTA method is used to identify how a problem can occur at the highest level in a system. The AHP method is used to calculate the weighting of each indicator. The results of the AHP method obtained values of 0.1888, 0.4121, 0.1252, 0.1728, 0.1011 for indicator 1 to indicator 5 respectively. Then, using the OMAX method, the productivity values of 1.640, 1.415, 6.665, 5.548, 2.371, 1.716, 2.227, 2.470, 2.089, 1.387, 1.591, 1.396 were obtained from January 2022 to January 2023. Based on the calculation results, it is known that defect/rework output, machine stop time and late start of production are indicators that have deficient performance. Implementation was performed by attaching a "Cello Replacement Instructions" sticker to the machine. The implementation results showed an increase in productivity value in January by 1.613.
Penentuan Prioritas Kriteria dan Peringkat Pemasok Menggunakan AHP-TOPSIS di PT Sutindo Raya Mulia Gunawan, Evelyn; Oktiarso, Teguh; Ekawati, Yurida
Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI) Vol. 3 No. 1 (2023): June 2023
Publisher : Teknik Industri Universitas Ma Chung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33479/jtiumc.v3i1.45

Abstract

Sutindo Raya Mulia is a stockist company that purchases, stores, and resells it to consumers. PT Sutindo Raya Mulia is headquartered in the city of Surabaya and has branch offices in Jakarta, Semarang, Balikpapan, and Samarinda. One of the products offered by SRM is a stainless steel plate. Plate products have 3 series (S200, S300, and S400) and have different suppliers consisting of both local and international. Some of the weaknesses of the purchasing process can be caused by the selection of suppliers that are not fixed when purchasing products from suppliers. This is because the company does not have priority criteria in selecting suppliers. Priority criteria are determined using the Analytical Hierarchy Process method. Supplier assessment is determined using the Technique for Order Preference by Similarity to Ideal Solution method. The results of the AHP method obtained the weight and order of these criteria, price (0.261), availability (0.206), quality (0.200), position (0.106), quantity (0.102), MOQ (0.060), delivery (0.038), payment method (0.027). The results of the TOPSIS method obtained the value and sequence of suppliers, AB (0,587 - 21,0%); AC (0,764 - 27,3%); AD (0,565 - 20,2%); AE (0,490 - 17,5%); AF (0,397 - 14,1%).
Pengukuran Kinerja Supply Chain Management PT Otsuka Indonesia dengan Metode Supply Chain Operation Reference Syahfarini, Zakinah Mutiara; Oktiarso, Teguh; Purnomo, Purnomo
Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI) Vol. 3 No. 2 (2023): December 2023
Publisher : Teknik Industri Universitas Ma Chung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33479/jtiumc.v3i2.48

Abstract

Supply chain management encompasses the study of efficiency and effectiveness in material, information, and monetary flow within the industrial sector. Assessing performance is pivotal in gauging a company's managerial capacities. At PT Otsuka Indonesia, research was undertaken during an internship, involving observations and interviews. Subsequently, Key Performance Indicators (KPIs) were formulated, covering aspects such as accuracy in raw material usage, precision in production level planning, frequency of production plan changes, source cycle time, finished product quality, make cycle time, delivery cycle time, precision in avoiding delays in finished goods delivery, and return of finished goods. Snorm de Boer normalization was applied to calculate the KPIs, generating performance results for each indicator. Determining the ultimate performance involved weighting via the Analytical Hierarchy Process (AHP) method, assigning significance levels to each KPI. Post data processing, it was evident that the finished product quality indicator had the lowest value. Consequently, improvement proposals were designed using the Failure Mode and Effects Analysis (FMEA) method. These proposals culminated in the development of warning sticker designs for machine cleaning, comprehensive Personal Protective Equipment (PPE) usage, and scales rechecking.
Perancangan Sistem Pemenuhan Material Minibus PT XYZ dengan Metode System Development Life Cycle Samudra, Eko Roby; Hadi, Yuswono; Oktiarso, Teguh
Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI) Vol. 3 No. 2 (2023): December 2023
Publisher : Teknik Industri Universitas Ma Chung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33479/jtiumc.v3i2.70

Abstract

The welding department is the focus of this study. This department welds and assembles various materials from the warehouse and supporting departments into complete minibuses. Several issues exist, such as material delivery delays occurring 1-3 times per production process, material delivery errors, increased production lead time from 12-13 working days to 15-16 working days, and the lack of a clear SOP for material fulfillment. To address these issues, a material fulfillment system design is necessary, utilizing the System Development Life Cycle (SDLC) analysis. The SDLC analysis suggests that solutions include grouping materials into kitting packages, developing system programs, improving system flow, and creating an SOP. These solutions can be directly implemented in the welding department's production process at PT XYZ. The implementation results show that materials needed by the welding department can be divided into seven kitting packages according to existing workstations. The new system flow reduces material delivery delays to less than one working hour, aligns production lead time with the company's target of 12-13 working days, reduces material delivery errors, and the implemented SOP aids all parties in the minibus production process. These measures must be consistently monitored to avoid disrupting the production process and to meet the company's production lead time targets.
Analysis of Pipe Water Inlet EW010 Quality Control Using Six Sigma and Failure Mode and Effect Analysis: Case Study: PT Wijaya Karya Industri dan Konstruksi Fadhlullah, Faris; Noya, Sunday; Putrianto, Novenda Kartika; Oktiarso, Teguh
Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI) Vol. 4 No. 1 (2024): June 2024
Publisher : Teknik Industri Universitas Ma Chung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33479/sakti.v4i1.87

Abstract

PT Wijaya Karya Industri dan Konstruksi has businesses in the fields of Steel, Plastic, Pressing and Casting (PPC) Manufacturing and heavy construction equipment. The PPC factory produces various kinds of manufacturing components, one of which is vehicle spare parts made from metal which are produced using a casting process. One of the products produced using a casting process is Pipe Water Inlet EW010. There are many Pipes Water Inlet EW010 defective products with an average of 52% defective products in July-August 2023. The research was conducted to analyze the sigma value and determine the factors of product defects and the impact of the defects to provide suggestions for product quality improvement. In this research, the method applied is the Six Sigma method and FMEA, by implementing DMAIC (Define, Measure, Analyze, and Control). From this research, the results showed that the most common defects were Leaking, Pen/core, and Porous, namely 89% cumulative. Pipe Water Inlet EW010 products are currently at level 2.44 sigma so corrective action needs to be taken to reach the six-sigma level. By applying the FMEA method, it can be seen that the most significant and most frequently occurring product defects are caused by poor core quality and work method errors. Therefore, the recommended alternative repair solution is to improve the quality of the cores used and improve work methods. The results show an increase in the sigma level value from 2.44 to 2.86 and a decrease in average defects from 52% to 23%.