Journal : Jurnal Ilmiah Teknik Industri

PENJADWALAN FLOWSHOP MENGGUNAKAN ALGORITMA NAWAZ ENSCORE HAM Masudin, Ilyas; Utama, Dana Marsetya; Susastro, Febrianto
Jurnal Ilmiah Teknik Industri Vol. 13, No. 1, Juni 2014
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This article attempts to schedule flow shop production using Nawaz Enscore Ham (NEH) to schedule jobs machining. The objective of this paper is to minimize total makespan which could reduce total production costs. This paper is based on the case study where NEH is applied in scheduling jobs in machines and then compared with the existing machine’s scheduling. The algorithm of NEH is also used to reduce idle time of machines so that the utility or performances of the machine are maintained.  The results of NEH simulation indicate that by applying NEH algorithm to scheduling machines for 10 jobs and 5 machines can reduce 2.5 per cent or 118 minutes of completing time of jobs. It also decreases total idle time of machines about 582 minutes compared with the existing scheduling.
Penentuan Lot Size Pemesanan Bahan Baku Dengan Batasan Kapasitas Gudang Utama, Dana Marsetiya
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper explains the problem of determining the lot size of ordering raw materials with warehouse capacity limitation in order to minimize inventory costs. Generally, the lot size of ordering raw materials determined without considering warehouse capacity. The algorithm that used is Wagner Within (WW) which is modified by adding a warehouse capacity as a constraint. The result shows the minimum of total inventory cost is 24,100 and the ordering raw materials at the week 3, 5 and 7.
Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing Utama, Dana Marsetiya; Dewi, Shanty Kusuma; Mawarti, Veronika Indah
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
Penentuan Lot Size Pemesanan Bahan Baku Dengan Batasan Kapasitas Gudang Utama, Dana Marsetiya
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v15i1.1664

Abstract

This paper explains the problem of determining the lot size of ordering raw materials with warehouse capacity limitation in order to minimize inventory costs. Generally, the lot size of ordering raw materials determined without considering warehouse capacity. The algorithm that used is Wagner Within (WW) which is modified by adding a warehouse capacity as a constraint. The result shows the minimum of total inventory cost is 24,100 and the ordering raw materials at the week 3, 5 and 7.
Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing Utama, Dana Marsetiya; Dewi, Shanty Kusuma; Mawarti, Veronika Indah
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v15i1.1572

Abstract

This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
Pengembangan Algoritma Hybrid Flowshop Three-Stage Dengan Mempertimbangkan Waktu Setup Utama, Dana Marsetiya; Garside, Annisa Kesy; Wicaksono, Wahyu
Jurnal Ilmiah Teknik Industri Vol. 18, No. 1, Juni 2019
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v18i1.7683

Abstract

Hybrid flow shop scheduling is one topic that is often reviewed by researchers at this time. Hybrid flow shop scheduling is the development of problems from pure flow shop. Flow shop problems have one machine at each stage. In this problem, each stage of operation has a machine that is arranged in parallel. This article aims to discuss the issue of hybrid flow shop scheduling at three stage to minimize makespan. Some previous studies discussed scheduling problems by considering setup time. However, such research is generally for the problem of pure flow shop. Therefore, a new algorithm is proposed to solve the problem. The proposed algorithm is developed from the Pour heuristic algorithm. Several experiments were conducted to determine the performance of the proposed algorithm. This study uses ten numerical experiments. This experiment uses the number of jobs varying from 5 jobs to 50 jobs. The results of numerical experiments show that the proposed algorithm has better performance compared to some other algorithms. The proposed method produces an effective solution if it is used to solve problems with a large number of jobs..
PENJADWALAN FLOWSHOP MENGGUNAKAN ALGORITMA NAWAZ ENSCORE HAM Masudin, Ilyas; Utama, Dana Marsetya; Susastro, Febrianto
Jurnal Ilmiah Teknik Industri Vol. 13, No. 1, Juni 2014
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v13i1.321

Abstract

This article attempts to schedule flow shop production using Nawaz Enscore Ham (NEH) to schedule jobs machining. The objective of this paper is to minimize total makespan which could reduce total production costs. This paper is based on the case study where NEH is applied in scheduling jobs in machines and then compared with the existing machine?s scheduling. The algorithm of NEH is also used to reduce idle time of machines so that the utility or performances of the machine are maintained.  The results of NEH simulation indicate that by applying NEH algorithm to scheduling machines for 10 jobs and 5 machines can reduce 2.5 per cent or 118 minutes of completing time of jobs. It also decreases total idle time of machines about 582 minutes compared with the existing scheduling.
ENERGY-EFFICIENT FLOW SHOP SCHEDULING USING HYBRID GRASSHOPPER ALGORITHM OPTIMIZATION Utama, Dana Marsetiya; Baroto, Teguh; Widodo, Dian Setiya
Jurnal Ilmiah Teknik Industri Vol. 19, No. 1, June 2020
Publisher : Muhammadiyah University Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i1.10079

Abstract

Manufacturing companies have a significant impact on environmental damage, and energy consumption in manufacturing companies is a widespread issue because the energy used is derived from fossil fuels. This research aims to minimize energy consumption using develop Hybrid Grasshopper Algorithm Optimization (HGAO). The focus of the issue in this article is the Permutation Flow Shop Scheduling Problem (PFSSP). A case study was conducted in offset printing firms. The results showed that the HGAO algorithm is capable of reducing energy consumption in offset printing firms. The higher the population of search agents and iterations produces less energy consumption. The HGAO algorithm is also compared with the genetic algorithm (GA). The results show that HGAO is more efficient in reducing energy consumption than GA.
A Three-Phased Perishable Inventory Simulation Model with Quality Decrease Consideration Ibrahim, Muhammad Faisal; Mardhiyyah, Yunita Siti; Rusdiansyah, Ahmad; Boer, Meidina Kalse; Utama, Dana Marsetiya
Jurnal Ilmiah Teknik Industri Vol. 19, No. 02, December 2020
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v19i2.11769

Abstract

In this article, focus on the simulation of a three-phase perishable product inventory system of a SMEs selling fresh and processed milkfish. This research was conducted to simulate a perishable product inventory system to understand and analyze the problems that occur then propose solutions to fix them. The simulation model was developed with ARENA software, simulation results of the existing condition show that there is 162 kg/month waste in fresh fish, 158 pcs/month in processed product A, and 86 pcs/month in processed product B. A model with a product renewal process mechanism was proposed to overcome this problem, and seven improvement scenarios were developed. The results obtained from the seventh improvement scenario revealed that there was a 100% reduction in fresh fish and processed product B and 94% in processed product A. Besides, there was a saving in need for fresh fish supply of 10 kg/day. In this article, we show how ARENA software can be adopted to simulate inventory system problems effectively. The method in this research can be applied to investigate various supply system scenarios and their consequences before implementing it in a real system.
Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing Dana Marsetiya Utama; Shanty Kusuma Dewi; Veronika Indah Mawarti
Jurnal Ilmiah Teknik Industri Vol. 15, No. 1, Juni 2016
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v15i1.1572

Abstract

This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
Co-Authors Abiddin, Moh Zainal Ahfa, Hikam Antasyard Ahmad Rusdiansyah Alba, Nidaul Anindya Apritha Putri Annisa Kesy Garside Ardiansyah, Leo Rizki Asrofi, Mochammad Samsul Ayu An Putri Salima Azis Fredy Mulya Bahru Widjonarko Bahtiar, Ardi Agustia Baiq Nurul Izzah Farida Bayu Nur Hidayat Bianca Maharani Boer, Meidina Kalse Cantika Febrita Cynthia Novel Al-Imron D Farista Dewi Maharani Diami, Berlinda Amalia Dian Setiya Widodo Dimas Caesario Pradikta Djirimu, Hanum Salsabila Dwi Asmara Putri, Yolanda Dwi Pramudia Wardani Farida Nur Kumala Fathiha Raudhatul Jannah Febrianto Susastro Febrianto Susastro, Febrianto FERRY YULIANTO FERRY YULIANTO, FERRY Firdaus, Muhammad Hafid, Ibnu Halifah, Syukron Taufiqurrohman Harto, Setyo Heri Mujayin Kholik Heri Santoso Hikam Antasyard Ahfa Husen, Moh. Ikhlasul Amallynda Ikhlasul Amallynda Ilyas Masudin Ilyas Mas’udin Imam Santoso Inggit Sekar Ningrum Jabari, Ahmed Nedal Abid Al Kareem Kholifa, Bunga Milenia Nur Leilani Salsabilah, Aisyah Lubis, Imtiaz Habib M. Faisal Ibrahim M.M Putri Mardhiyyah, Yunita Siti Mas’udin, Ilyas Maulana, Abel Alqurni Maulana, Sri Kurnia Dwi Budi Meidina Kalse Boer Meiliza Dresanala Mochammad Samsul Asrofi Moh Zainal Abiddin Moh. Husen Muhammad Aghniya Baihaqi Muhammad Faisal Ibrahim Muhammad Faisal Ibrahim Muhammad Faisal Ibrahim, Muhammad Faisal Muhammad Firdaus Nabilah Sanafa Nafis, Dzakia Nasution, Riven Nidaul Alba Ningrum, Inggit Sekar Nur Fitriana Pradikta, Dimas Caesario Primayesti, Meri Dines Putri, Anindya Apritha Putri, Artha Bripka Rahmat Wisnu Wardana Ramadhani, Taufik Akbar Randle, Oluwarotimi Ricca Andhini Octaria Risma, Yolanda Mega Rista Anggriani Riven Nasution Rizal Dian Azmi Safitri, Wa Ode Nadhilah Salsabila, Nadhea Aurelie Salsabilah, Aisyah Leilani Sanafa, Nabilah Selvia Rubiyanti Setyo Harto Shanty Kusuma Dewi Sri Kurnia Dwi Budi Maulana Syukron Taufiqurrohman Halifah Teguh Baroto Thoriq Akbar Zein Tyas Yuli Rosiani Ulfa Fitriani Ulfa Fitriani Umamy, Sabila Zahra Veronika Indah Mawarti Veronika Indah Mawarti, Veronika Indah Vritta Amroini Wahyudi Wahyu Wicaksono Wardani, Dwi Pramudia Warkoyo Widodo, Dian Setiya Wike A. P. Dania Yasa, Arnelia Dwi Yolanda Mega Risma Yusuf Hendrawan Zein, Thoriq Akbar