Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Syntax Literate: Jurnal Ilmiah Indonesia

Pengaruh Penerapan Sistem Manajemen Mutu Berbasis ISO 9001:2015 Terhadap Kualitas Proyek Konstruksi di Provinsi Papua Eric Sandi Hutajulu; Bernathius Julison; Harmonis Rante
Syntax Literate Jurnal Ilmiah Indonesia
Publisher : Syntax Corporation

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/syntax-literate.v7i10.13081

Abstract

Penerapan sistem manajemen mutu adalah suatu keputusan strategis bagi suatu organisasi yang dapat membantu organisasi untuk meningkatkan kinerjanya secara keseluruhan dan menyediakan dasar yang kuat untuk inisiatif pembangunan berkelanjutan.rumusan masalah: 1. Bagaimana penerapan ISO 9001:2015 terhadap kualitas proyek konstruksi di Propinsi Papua 2. Bagaimana kualitas proyek yang ada pada Propinsi Papua 3. Bagaimana pengaruh ISO 9001:2015 terhadap kualitas proyek konstruksi di Propinsi Papua. penelitian ini penelitian kualitatif. uji korelasi analisis yang digunakan dalam analisis kualitatif. Dari data responden yang diperoleh 40 responden dengan sertifikat ISO 9001:2015 dan 5 responden tidak memiliki ISO 9001:2015. Sehingga sebesar 88,88% proyek kontraktor telah dikerjakan dengan ISO 9001:2015. Dapat disimpulkan 1) Penerapan Sistem manajemen mutu berbasis ISO 9001:2015 pada proyek konstruksi di Provinsi Papua sebesar 88,88 %. 2)Kualitas proyek yang ada pada Provinsi Papua yang ditunjukkan dengan nilai median 4.00 maka dinyatakan baik. 3) Pengaruh penerapan ISO 9001:2015 terhadap kualitas proyek konstruksi di Provinsi Papua berkorelasi sangat kuat dan ada 3 indikator variabel yang berkorelasi lemah yaitu mengurangi dampak resiko proyek yang dihasilkan (D1), peremajaan peralatan (E2), dan ketrampilan tenaga ahli dari subkontraktor (G1).
Analisis Faktor Aksesibilitas terhadap Perbandingan Antara Harga Perencanaan dan Harga Kontrak pada Proyek Jembatan di Provinsi Papua Imbiri, Billian Melianus; Julison, Bernathius; Rante, Harmonis
Syntax Literate Jurnal Ilmiah Indonesia
Publisher : Syntax Corporation

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/syntax-literate.v7i12.13364

Abstract

Penelitian ini dilakukan di enam ruas jalan Nasional di Provinsi Papua Tengah meliputi ruas jalan Nabire-Wanggar, Wanggar-Kwatisore (Batas Provinsi Papua Barat), Bedudipa-Batas Kota Nabire, Nabire-Kimibai, Kimibai-Legari dan ruas jalan Legari-Botawa dengan total panjang ruas 443.41 Km. Dengan tujuan untuk: (1) untuk menganalisa pengaruh aksesibilitas terhadap harga perkiraan sendiri dan (2) untuk menganalisa pengaruh aksesibiltas terhadap harga perkiraan sendiri. Penelitian ini merupakan penelitian yang bersifat deskriptif dengan pengambilan sampel secara “field reseacrh". Pengumpulan data primer menggunakan metode pencatatan dokumen dan pengumpulan data kontrak, selanjutnya dianalisis secara deskriptif kualitatif. Berdasarkan hasil penelitian menunjukan bahwa, (1) Nilai aksesibilitas ke lokasi pekerjaan tidak berpengaruh terhadap harga perkiraan sendiri dan (2) Nilai aksesibilitas ke lokasi pekerjaan berpengaruh terhadap nilai kontrak fisik
Penggunaan Model Hec-Hms Dalam Pemenuhan Air Baku Di Kabupaten Dan Kota Jayapura (Annual Water Allocation Plan For Sentani Lake Watershed) Wambrauw, Neilzen Wiliam; Widyastuti, Ira; Rante, Harmonis; Mujiati, Mujiati; Julison, Bernathius
Syntax Literate Jurnal Ilmiah Indonesia
Publisher : Syntax Corporation

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/syntax-literate.v10i6.59927

Abstract

The location of the study in this study is the Sentani watershed which is located in Jayapura City and Jayapura Regency. In the Sentani watershed, there is Lake Sentani which has potential utilization in the form of a Drinking Water Supply System (SPAM), Irrigation Needs of Agricultural Areas, Power Plants, Utilization of Business Development in the Fisheries Sector and Lake Ecotourism Destination Areas. With the growing utilization in the Sentani watershed, an analysis of water allocation is needed to determine the ability of the Sentani watershed to meet its needs. The Head of PDAM Jayapura explained that Lake Sentani has the potential to be an alternative to overcome the reduced water discharge and water supply for the community in Jayapura Regency. So it is hoped that this research can contribute to providing a foothold for water utilization recommendations for the community in Jayapura Regency. The results of this study show that Lake Sentani can meet water needs both with existing intakes and with the fulfillment of new needs to be developed. The total raw water taken based on the existing intake is 0.926 m^3/s and the plan to increase the raw water intake in Jayapura district is 0.125 m^3/s.
Pengaruh Sistem Manajemen Mutu Berbasis Iso 9001:2015 Terhadap Kualitas Proyek Jalan Di Provinsi Papua Tengah Puhili, Bertrand Laski Mate; Julison, Bernathius; Rante, Harmonis; Ana Rusim, Dewi; Mujiati, Mujiati
Syntax Literate Jurnal Ilmiah Indonesia
Publisher : Syntax Corporation

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/syntax-literate.v10i6.59945

Abstract

The implementation of a quality management system is a strategic decision for an organization that can help the organization to improve its overall performance and provide a solid foundation for sustainable development initiatives.Problem formulation: 1. How to apply ISO 9001:2015 to the quality of road projects in Central Papua Province 2. What is the quality of existing road projects in Central Papua Province 3. How does ISO 9001:2015 affect the quality of road projects in Central Papua Province? This research is qualitative research. Analytical correlation test used in qualitative analysis. From the respondent data obtained, 40 respondents with ISO 9001:2015 certificates. 67% of road projects have been carried out with ISO 9001:2015. The leadership variable and process approach received the highest dominant percentage at 71.80% while the management relationship received the smallest dominant percentage at 64%. It can be concluded that the implementation of ISO 9001:2015-based quality management system in road projects in Central Papua Province is 67%, the quality of existing projects in Central Papua Province is good, the implementation of ISO 9001:2015 has a positive effect on the quality of road projects in Central Papua Province, the dominant factor in the implementation of ISO 9001:2015 in road projects in Central Papua Province is the weather, security, terrain and material delivery