Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Retensi

PERENCANAAN STRUKTUR BETON BERTULANG GEDUNG PERPUSTAKAAN PUBLIK KOTA PONTIANAK: PERENCANAAN STRUKTUR BETON BERTULANG GEDUNG PERPUSTAKAAN PUBLIK KOTA PONTIANAK Setiawan, Ivan; zuraida, ida; Sergius, sergius; wiidhiyastuti, rahayu
RETENSI Vol. 2 No. 2 (2022): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v2i2.471

Abstract

Pontianak as the capital city of West Kalimantan province is a city where there are many people with various professions such as: students, teachers, doctors, employees, students, entrepreneurs and others. From these various professions, it is necessary to have a source of knowledge or information for the general public so that they can always be responsive to advances in technology, science, social life, political life, and culture. There is only one public library in Pontianak City, making it easier for students and students to access information that is easy, cheap, fast, and precise. For the construction planning, a reinforced concrete structure consisting of 4 floors is used with concrete quality specifications (fc')25, 28, 30 MPa, and steel quality 420 (fy) calculated based on the Indonesian National Standard (SNI), namely SNI 03-2847-2013 and using the SAP2000 application for the calculation of internal forces, so that a plan drawing can be made according to the calculation results obtained. The calculation results also obtained reinforcement for the 1st floor to the roof not with a thickness of 12 cm for the floor plate, 10 cm thick for the roof not, the beam used was 25 cm x 45 cm, the column used was 35 cm x 35 cm, the foundation used is a type of pile foundation, with a pile size of 35 cm x 35 cm as many as 8 pieces, the dimensions of the pile cap used are 210 cm x 210 cm with a height of 50 cm.
PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN STRUKTUR BUNKER GEDUNG RADIOTERAPI RSUD Dr. SOEDARSO KOTA PONTIANAK: PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN STRUKTUR BUNKER GEDUNG RADIOTERAPI RSUD Dr. SOEDARSO KOTA PONTIANAK Gustianti Kurnia, Aura Febri; Abduh, M; zuraida, ida
RETENSI Vol. 4 No. 2 (2024): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v4i2.735

Abstract

The construction of the Bunker in the Radiotherapy Building is a project built with specific requirements, particularly in its Construction Management. To achieve the intended goals, it is essential to have a good management plan to ensure that the project construction yields effective, efficient, and economical results. In the Final Project, the author focuses on five elements of construction management; Cost : which deals with the calculation of the Implementation Budget Plan. Time ; Addressing the creation of a Network Planning using the Critical Path Method and a Time Schedule. Quality: Developing a standard quality control table. Health, Safety, and Environment: Establishing the classification and control of accident risks, determining Personal Protective Equipment, and specifying Safety and Health Work Procedures. The result of this Final Project is that the author can make Cost Management Planning, namely RAP with a cost of Rp. 7,741,778,071.76-. Time Management Planning includes a Time Schedule and NWP using the CPM, resulting in a duration of 11 weeks or 79 days. For Human Resource Management Planning, a total of 108 workers are required for all work items. Quality Management Planning is based on the quality (Qc) and quantity (Qa). Occupational Health and Safety Management System planning involves identifying hazards and controlling risks. The requirement for Personal Protective Equipment and Personal Protective Work Equipment can be determined based on hazard identification and risk assessment. Keywords: Management Construction, Cost, Time, Human Resources, Quality, and Occupational Health and Safety.