GEOLOGI DAN POTENSI SUMBERDAYA BATUBARA, DESA TALANG LAMBAITAMPUI, KECAMATAN SEKAYU, KABUPATEN MUSI BANYUASIN, PROPINSI SUMATRA SELATAN Mirza Adiwarman
Hexatech: Jurnal Ilmiah Teknik Vol. 1 No. 1 (2022): Hexatech : Jurnal Ilmiah Teknik
Publisher : ARKA INSTITUTE

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1187.015 KB) | DOI: 10.55904/hexatech.v1i01.57

Abstract

The research area is located in Tanah Abang village, Sekayu district, Musi Banyuasin district, South Sumatra province. This research was conducted through three stages, namely the preliminary stage accompanied by data collection, the analysis and interpretation stage, and the completion and data presentation stage. Stratigraphy in the study area is divided into three rock units from old to young, namely the Muara Enim Sandstone unit, at the top the Muara Enim Claystone unit is deposited in harmony. In the study area there are two main coal seams, where both seams can be drawn continuously. The Calculation of Seam X Coal Resources Inferred Estimated Distance is 400 meters Total tonnage:1,364,626.9 tons. Calculation of Seam Y Coal Resources Inferred Distance Estimated 400 mTotal tonnage : 278,952.7 tons. Calculation of Seam X Coal Resources Indicated Distance Estimated 750 m Total tonnage : 3,016,306 tons. Calculation of Seam Y Coal Resources Indicated Estimated Distance 750 m Total tonnage : 524,890.6 tons. Calculation of Coal Resources of Seam X Measured Distance Estimated 1100 m Total tonnage : 4,775,195.4 tons Calculation of Coal Resources of Seam Y Measured Distance Estimated 1100 m Total amount of tonnage : 701,819.3 tons.
P PERENCANAAN DESAIN DISPOSAL DAN PERHITUNGAN KAPASITAS DISPOSAL DI BANKO SELATAN PT BUKIT ASAM, Tbk. PROVINSI SUMATERA SELATAN Siti Hardianti; Mirza Adiwarman; Riki Saputra
Jurnal Teknik Patra Akademika Vol 14 No 02 (2023): Jurnal Teknik Patra Akademika
Publisher : Politeknik Akamigas Palembang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52506/jtpa.v14i02.216

Abstract

Aktivitas penambangan di PT Bukit Asam, Tbk. dilakukan dengan sistem tambang terbuka. Perencanaan desain disposal merupakan kegiatan untuk merencanakan suatu model disposal pada suatu tambang yang bertujuan untuk menimbun material overburden. Tujuan penelitian ini adalah membuat desain disposal yang sesuai dengan parameter yang ditentukan perusahaan, menghitung volume overburden yang akan ditimbun pada disposal area Banko Selatan dan menghitung alat muat dan alat angkut yang digunakan untuk pengupasan lapisan tanah penutup di Pit Banko Selatan. Perencanaan desain disposal Banko-Selatan dilakukan menggunakan software Minescape 5.7. Sebelum pembuatan desain disposal yang dipersiapkan adalah data topografi dan data geoteknik. Perancangan desain disposal dilakukan dengan memasukan parameter geometri jenjang disposal yang telah ditentukan oleh PJP (Perencanaan Jangka Panjang) di PT Bukit Asam, Tbk. yaitu dengan tinggi bench 6 m dan lebar bench 30 m dan kemiringanya (single slope angle) sebesar 18°, dengan skenario in pit dump. Dari hasil perhitungan desain disposal Banko-Selatan didapat target timbunan sebesar 92.192.212,8 BCM dan hasil volume atau kapasitas disposal dari perhitungan triangle cut and fill dengan menggunakan Software Minescape 5.7. mendapatkan volume sebesar 105.000.817,63 BCM, dengan luas wilayah disposal Banko-Selatan adalah yaitu 347,93 Hektar dengan elevasi terendah adalah 138 mdpl dan elevasi tertingginya adalah 180 mdpl. Dalam penambangan di Banko Selatan untuk overburden terdapat 7 fleet. Alat muat yang digunakan adalah Komatsu PC 2000 sebanyak 1 unit. Dan alat angkut yang digunakan adalah Dump Truck Komatsu HD 785 sebanyak 3 unit atau 1 excavator melayani 3 unit alat angkut HD 785 dalam 1 fleet
Analisis Perbandingan Kuantitas Batubara Menggunakan Metode Situasi Detail Dengan Software Surpac Vision 6.5.1 dan Metode Timbangan di PT. Putra Muba Coal Sepriadi Sepriadi; Mirza Adiwarman; Siska Pranola; Putra Putra
Jurnal Ilmiah Teknik dan Sains Vol. 1 No. 3 (2024): April : Jurnal Ilmiah Teknik dan Sains (JITS)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat AKIPBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62278/jits.v1i3.19

Abstract

Pengukuran tambang merupakan kegiatan pendukung yang sangat penting dalam pertambangan, baik pada tahapan persiapan, selama kegiatan berlangsung, maupun penutupan tambang. Kegiatan perhitungan kuantitas batubara menggunakan dua metode, yaitu metode timbangan dan metode pengukuran situasi detail dengan menggunakan aplikasi surfac vision 6.5.1. pada hasil perhitungan kedua metode tersebut selalu terjadi deviasi (selisih) sehingga menyebabkan tidaktercapainnya nilai coal recovery. Hasil perhitungan menggunakan metode timbangan di PT Putra Muba Coal sebesar 837.835,81 MT, sedangkan perhitungan menggunakan pengukuran situasi detail sebesar 873.072,54 MT, sehingga terdapat deviasi (selisih) 35.236,73 MT. Berdasakan hasil analisis faktor yang menyebabkan terjadinya selisih sehingga menyebabkan ketidaktercapainya nilai coal recovery terdapat 3 faktor yaitu: kegiatan coal cleaning sebesar 12.332,86 ton atau 34%, kegiatan coal getting sebesar 22.963,88 ton atau 65% dan kegiatan hauling sebasar 7 ton dan 1%.
Analisis Faktor Penurunan Kualitas Batubara Mine Brand BB-53 Pada Stockpile 3 dan Train Loading Station 3 Menuju Pelabuhan Tarahan dan Dermaga Kertapati PT. Bukit Asam, Tbk Putra Putra; Ilka Fajar Alief; Mirza Adiwarman
Jurnal Ilmiah Teknik dan Sains Vol. 1 No. 3 (2024): April : Jurnal Ilmiah Teknik dan Sains (JITS)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat AKIPBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62278/jits.v1i3.27

Abstract

PT. Bukit Asam, Tbk. merupakan salah satu Badan Usaha Milik Negara (BUMN) yang bergerak dibidang pertambangan batubara yang memiliki berbagai jenis batubara, salah satunya adalah batubara jenis BB-53 dengan sistem penambangan open pit (sistem penambangan terbuka) sehingga kualitas batubara dapat dipengaruhi oleh lingkungan sekitar. Parameter kualitas ditentukan oleh kadar Total Moisture, kadar Inhrent Moisture, kadar Ash, dan kadar Gross Calorie Value. Batubara yang dikeluarkan di tumpuk pada stockpile dan kemudian dikirim ke gerbong kereta api. Oleh karena itu dibutuhkan monitoring kulitas di setiap rangkaian penanganan dan angkutan batubara, contohnya di stockpile dan di gerbong kereta api, untuk menghitung signifikan perbedaan atau penurunan kualitas batubara. Perhitungan dengan cara membandingkan data sekunder analisa kulitas pada stockpile dan gerbong kereta api menuju pelabuhan tarahan dan dermaga kertapati, kandungan atau parameter batubara yang mengalami perbedaan signifikan dan berpengaruh terhadap kandungan atau parameter Gross Calorie Value adalah Total Moisture 3,25% Ar, Inherent Moisture 0,28% Adb, Ash Content Adb 1,72% Adb, Ash Content 1,40% Ar, berpengaruh pada penurunan nilai kalori sebesar 259 kcal/kgAdb, dan 438 kcal/kgAr pada pelabuhan tarahan. Kemudian pada dermaga kertapati Total Moisture 3,45% Ar, Inherent Moisture 1,16% Adb, Ash Content Adb 0,48% Adb, Ash Content Ar 0,38%Ar, berpengaruh pada penurunan nilai kalori sebesar 182 kcal/kgAdb, dan 182 kcal/kgAdb. Untuk menjaga kulitas pada batubara perlu dilakukan management stockpile meliputi sampling, blending dan pengontrolan water spray
P PERENCANAAN DESAIN PIT BANKO SELATAN PT BUKIT ASAM, Tbk. PROVINSI SUMATERA SELATAN Siti Hardianti; Denis Pratama; Mirza Adiwarman; Aprilliana Aprilliana
Jurnal Teknik Patra Akademika Vol 15 No 01 (2024): Jurnal Teknik Patra Akademika
Publisher : Politeknik Akamigas Palembang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52506/jtpa.v15i01.240

Abstract

PT Bukit Asam, Tbk. merupakan perusahaan yang bergerak dalam bidang penambangan batubara. Salah satu aspek terpenting dalam penambangan batubara adalah rancangan atau desain pit pada area penambangan. Tujuan dari penelitian ini adalah membuat desain pit, mengetahui volume overburden dan volume batubara serta membuat forecast plan kebutuhan alat di Pit Banko Selatan yang saat ini belum beroperasi. Rancangan desain pit ini bertujuan sebagai acuan dalam pembuatan pit yang aman dan menguntungkan. Untuk pembuatan desain pit Banko Selatan dimulai dari elevasi tertinggi yaitu 150 dan diakhiri elevasi terendah yaitu -10, serta untuk mempertimbangkan pencapaian dari target produksi yang telah ditentukan. Dalam rencana produksi perbulan adalah overburden 8.048.526,32 bcm dan 1.472.483,42 ton batubara dengan menggunakan SR 5,9:1. Desain pit ini dibuat dengan menggunakan Software Minescape 5.7 sesuai dengan parameter yang telah ditentukan oleh perusahaan yaitu lebar bench 25 meter, tinggi bench 8 meter, dan overall slope angle 45o. Dari parameter yang telah ditentukan maka terbentuklah desain pit yang dinyatakan ideal. Dari target produksi di atas maka akan didapat berapa umur tambang pit Banko Selatan yaitu 27 tahun. Dan untuk kebutuhan alat yang digunakan di pit Banko Selatan adalah 11 excavator PC 2000 dan 23 HD jadi di pit Banko Selatan menggunakan 11 fleet dimana 1 excavator melayani 2 HD dan untuk mencapai target batubara 1.472.483,42 ton diperlukan 10 excavator dan 128 DT dengan menggunakan 10 fleet dimana 1 excavator melayani 13 DT.
Analisis Kestabilan Lereng Highwall Dengan Metode Morgenstern Price Pada PIT 2 Banko Barat Di PT. Bukit Asam, Tbk Sepriadi Sepriadi; Mirza Adiwarman
Jurnal Ilmiah Teknik dan Sains Vol. 2 No. 2 (2024): Desember: Jurnal Ilmiah Teknik dan Sains (JITS)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat AKIPBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62278/jits.v2i2.38

Abstract

Kestabilan lereng merupakan faktor krusial dalam operasi penambangan terbuka. Berdasarkan Keputusan Menteri ESDM RI No. 1827K/ME/30/2018, nilai faktor keamanan (FK) minimum untuk mencapai lereng stabil adalah 1,3. Penelitian ini bersifat kuantitatif dengan metode survei eksplorasi. Analisis kestabilan dilakukan menggunakan metode kesetimbangan batas dan software Geostudio 2023. Penelitian difokuskan pada area Pit 2 Banko Barat, yang memiliki litologi berupa tuff, batulempung, batulanau, batupasir, dan batubara. Muka air tanah diasumsikan berada di kedalaman 13 m dari permukaan lereng, dengan seismic load 0,05 dan surcharge load 533 kN/m² dari berat alat angkut HD Komatsu 785 milik PT Bukit Asam, Tbk. Desain awal lereng pada bulan April 2024 menunjukkan beberapa bagian yang berpotensi longsor. Pada section A-A”, overall slope dan intermediate slope memiliki nilai FK 1,25 (tidak stabil). Pada section B-B”, intermediate slope memiliki FK 1,25 (kritis), sedangkan pada section C-C”, overall slope berada dalam kondisi riskan (FK 1,25). Untuk meningkatkan stabilitas, dilakukan rekayasa geoteknik melalui pengupasan overburden dan batubara serta perubahan geometri lereng. Pemodelan ulang menghasilkan nilai FK yang lebih optimal dan stabil. Rekomendasi perbaikan mencakup perubahan desain pada section B-B” (overall slope) dan section C-C” (intermediate slope) untuk mencapai stabilitas lereng yang sesuai standar. Dengan rekayasa ini, diharapkan potensi longsor dapat diminimalkan dan operasi tambang berlangsung lebih aman dan efisien
I IDENTIFIKASI BAHAYA DAN PENILAIAN RISIKO (IBPR) PADA AKTIVITAS LOADING OVERBURDEN DI PT X KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN Isnaeni, Kemas Moh. Ade; Sella, Sella; Adiwarman, Mirza; Sepriadi, Sepriadi; Cahyadi, Roby
Jurnal Teknik Patra Akademika Vol 15 No 02 (2024): Jurnal Teknik Patra Akademika
Publisher : Politeknik Akamigas Palembang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52506/jtpa.v15i02.270

Abstract

PT X merupakan salah satu kontraktor pertambangan di Indonesia yang dimana pada proses produksinya menggunakan alat berat dan peralatan lainnya. Identifikasi bahaya dan Penilaian Risiko merupakan sebuah metode atau teknik yang di gunakan untuk mengidentifikasi kejadian atau kondisi yang memiliki potensi risiko bahaya. Metode ini melibatkan penilaian risiko dengan menggunakan matriks penilaian risiko pada penelitian ini menggunakan metode secara kualitatif yang dimana peneliti menggali data dengan melakukan Observasi Lapangan, wawancara dan Studi Literatur. Adapun identifikasi bahaya yang di temukan peneliti di PT X sebanyak 12 potensi bahaya pada kegiatan loading overburden setelah di temukannya potensi bahaya tersebut dilakukan penilaian risiko bedasarkan AS/NZS 4360: 2004 dengan menggunakan dua parameter perhitungan likelihood dan consequence yang dimana hasil tersebut di masukkan ke tabel risk matriks bertujuan agar mengetahui tingkat risiko Adapun Upaya pengendalian bahaya dan risiko dengan penerapan menggunakan metode Hirarki pengendalian risiko dan bahaya meliputi eliminasi, subtitusi, rekayasa teknis, adiministrasi dan alat perlindung diri bertujuan untuk menurunkan tingkat risiko dan bahaya menuju titik aman.
GEOLOGI DAN POTENSI SUMBERDAYA BATUBARA, DESA TALANG LAMBAITAMPUI, KECAMATAN SEKAYU, KABUPATEN MUSI BANYUASIN, PROPINSI SUMATRA SELATAN Adiwarman, Mirza
Hexatech: Jurnal Ilmiah Teknik Vol. 1 No. 1 (2022): Hexatech : Jurnal Ilmiah Teknik
Publisher : ARKA INSTITUTE

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55904/hexatech.v1i01.57

Abstract

The research area is located in Tanah Abang village, Sekayu district, Musi Banyuasin district, South Sumatra province. This research was conducted through three stages, namely the preliminary stage accompanied by data collection, the analysis and interpretation stage, and the completion and data presentation stage. Stratigraphy in the study area is divided into three rock units from old to young, namely the Muara Enim Sandstone unit, at the top the Muara Enim Claystone unit is deposited in harmony. In the study area there are two main coal seams, where both seams can be drawn continuously. The Calculation of Seam X Coal Resources Inferred Estimated Distance is 400 meters Total tonnage:1,364,626.9 tons. Calculation of Seam Y Coal Resources Inferred Distance Estimated 400 mTotal tonnage : 278,952.7 tons. Calculation of Seam X Coal Resources Indicated Distance Estimated 750 m Total tonnage : 3,016,306 tons. Calculation of Seam Y Coal Resources Indicated Estimated Distance 750 m Total tonnage : 524,890.6 tons. Calculation of Coal Resources of Seam X Measured Distance Estimated 1100 m Total tonnage : 4,775,195.4 tons Calculation of Coal Resources of Seam Y Measured Distance Estimated 1100 m Total amount of tonnage : 701,819.3 tons.
PENYULUHAN PEMANFAATAN SOFTWARE DIPS SEBAGAI MEDIA ANALISIS STRUKTUR GEOLOGI KEPADA GURU-GURU DI SMK TEKNOLOGI NASIONAL PALEMBANG Hardianti, Siti; Adiwarman, Mirza
SINAR SANG SURYA Vol 9, No 2 (2025): Agustus 2025
Publisher : UM Metro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24127/sss.v9i2.3377

Abstract

Struktur geologi merupakan kondisi geologi pada suatu daerah sebagai akibat dari terjadinya perubahan pada batuan oleh proses tektonik atau proses lainnya. Dalam dunia pertambangan struktur geologi memberikan pengaruh yang signifikan, sehingga perlu adanya pengawasan dan analisis keberadaan struktur geologi pada daerah tambang. Salah Satu media yang dapat digunakan untuk menganalisis struktur geologi adalah software dips yang merupakan suatu program rancangan untuk menganalisis orientasi yang berhubungan dengan data geologi. SMK Teknologi Nasional Palembang  merupakan salah satu Sekolah Menengah Kejuruan yang mengajarkan keahlian bidang Geologi Pertambangan dimana Kurikulum bidangnya terdiri dari kelompok mata pelajaran umum dan kejuruan. Menurut Peraturan Direktur Jenderal Pendidikan Dasar dan Menengah Kementerian Pendidikan dan Kebudayaan Nomor: 07/D.D5/Kk/2018 Tentang Struktur Kurikulum Sekolah Menengah Kejuruan/Madrasah Aliyah Kejuruan (MAK), teknik eksplorasi dan teknik pertambangan memiliki proporsi paling besar dalam struktur kurikulum tersebut. Kompetensi ini mewajibkan siswa mengetahui jenis data pada kegiatan eksplorasi serta pemanfaatan teknologi. Dalam kegiatan belajar mengajarnya, penggunaan teknologi digital seperti software belum dilakukan secara maksimal, dimana proses pembelajaran terbatas pada penggunaan Microsoft Office dan buku pendukung. Hal inilah yang menjadi dasar pelaksanaan kegiatan pengabdian kepada masyarakat dengan memberikan pengenalan pemanfaatan software dips sebagai media analisis struktur geologi. Metode kegiatan pengabdian ini adalah dengan memberikan ceramah secara langsung untuk mempraktikkan tutorial analisis struktur geologi. Dari kegiatan yang dilaksanakan tampak bahwa guru memang belum familiar dengan penggunaan software dips untuk analisis struktur geologi, sehingga tentunya kegiatan ini akan memberikan dampak yang positif bagi pengembangan materi pembelajaran, sehingga nantinya dapat diaplikasikan dalam kegiatan belajar mengajar di SMK Teknologi Nasional Palembang.
KUALITAS KUAT TEKAN BATUGAMPING KRISTALIN DAN BATUGAMPING TERUMBU DI DAERAH BANJARJO DAN SEKITARNYA, DONOMULYO, MALANG, JAWA TIMUR: Bahasa indonesia Dapri Aminu; Obrin Trianda, S.T., MT; Paramitha Tedja Trisnaning. S.T; Mirza Adiwarman, S.T., M.T; Anggi Deliana Siregar, ST., MT
Retii 2024: Prosiding Seminar Nasional ReTII ke-19 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The utilization of class C mining materials, especially crystalline limestone and reef limestone in the construction world plays a very important role in supporting a development project. In the research area, precisely in Banjarjo Village, Malang Regency, these mining materials have not been utilized optimally. Therefore, the researcher conducted this special study aimed at comparing the quality of each existing rock using the compressive strength test analysis method. Based on the results of the compressive strength test analysis carried out at the Sabo Testing Center Laboratory in Yogyakarta, a comparison of the compressive strength values ​​of crystalline limestone with a value of 549.441 kg/cm² - 1454.830 kg/cm² from four samples taken in different places and reef limestone has a compressive strength value of 449.593 kg/cm² - 640.866 kg/cm² from three samples taken in different places. Keyword : Crystalline Limestone, Reef Limestone, Compressive Strength Test