cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
MEDIA KOMUNIKASI TEKNIK SIPIL
Published by Universitas Diponegoro
ISSN : 08541809     EISSN : 25496778     DOI : -
Core Subject : Engineering,
Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal contains articles of thought and research results in Civil Engineering that have never been published in scientific journals or other media.
Arjuna Subject : -
Articles 471 Documents
Building Design Coordination HA, Rusdi
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 13, Nomor 1, Edisi XXXI, PEBRUARI 2005
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (170.853 KB) | DOI: 10.14710/mkts.v13i1.3893

Abstract

Artikel ini menyajikan hasil penelitian studi pustaka yang meneliti tentang proses dalam perancangan gedung. Penelitian ini mendiskusikan tiga aspek dari perancangan gedung: proses perancangan, koordinasi perancangan dan informasi rancangan. Bagian pertama menjelaskan bagaimana sebuah rancangan muncul dimulai dari client’s requirements sampai menjadi rancangan lengkap. Pada bagian kedua menjelaskan bahwa bila perancangan melibatkan beberapa bidang yang berbeda maka diperlukan koordinasi perancangan. Bagian terakhir menjelaskan pertumbuhan dari informasi rancangan. Dari  rancangan konsep hingga rancangan detil, informasi rancangan berubah dari lebih abstrak menjadi lebih konkrit, dari umum menjadi lebih rinci. Kata kunci: proses, koordinasi dan informasi perancangan gedungPermalink: http://www.ejournal.undip.ac.id/index.php/mkts/article/view/3893[How to cite: Rusdi HA., 2005, Building Design Coordination, Jurnal Media Komunikasi Teknik Sipil, Volume 13, Nomor 1, pp. 20-26]
Model Penilaian untuk Kematangan Perencanaan Keselamatan dalam Tahap Pra Konstruksi Endroyo, Bambang; Suraji, Akhmad
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 20, Nomor 2, DESEMBER 2014
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.727 KB) | DOI: 10.14710/mkts.v20i2.9258

Abstract

The construction sector still has a low achievement in safety issues. Fatal accident rate in construction is higher than average rate in other industries. Because of it, need some attention to minimize the rate of accident in construction. This research examined the key factors of safety planning in the pre-construction stage, and it was based on the theories of accidents causation having the upstream approach. Some theories were: Constraint-Response Theory (CR); Construction Design Management (CDM), and the Process Protocol (Pp). This research broke down the three theories above (CR; CDM; Pp) into the concept of the key factors of safety planning in pre-construction. Then, the concept was verified by construction practitioners and academician, using Delphi method three rotations. During the verification, from the first to the third round, there were reduction and the addition concept and language appropriateness. The findings of this research were assessment models of maturity safety planning in the pre construction stages. There were two models, the model of "radar chart" or MISAP 1 and the model of "worksheet" or MISAP 2.
Studi Pengamanan Kolom terhadap Konsep Perencanaan Struktur Tahan Gempa Ditinjau dari Peraturan SK SNI T-15-1991-03 ACI ’99 dan Usulan MJN Priestly Sunardi, Sunardi
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 13, Nomor 3, Edisi XXXIII, OKTOBER 2005
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (226.883 KB) | DOI: 10.14710/mkts.v13i3.3925

Abstract

The development of anti-earthquake structure planning concept starts from planning structure based on force concept (forced based design), based on performance (performance based design) and develops the theory, which introduces and studies the anti-earthquake structure planning concept, which is based on movement (displacement - based), however, all of these element will return to the benefit principle of the building planning itself that is; instead giving safety value, the building construction also giving the safety for the users as well (user). This research is wished could giving either information about the column safety as a result of earthquake toward the planning structure based on force concept (forced based design), based on performance (performance based design) or introducing the planning structure based on displacement (displacement based design). The column safety as a result of earthquake is observed by the rule of SK. SNI T-15-1991-03 and the MJN Priestly’s suggestion. The result of this research is analyzing the rule, which is conducted in Indonesia that is SK.SNI.T-15-1991-03 and the MJN Priestly’s suggestion, which is concluded as follows: (A) the development of anti-earthquake structure planning concept (vibration), need special care especially in Indonesia by notice the politic security and globalization situation, (B) by noticing the rule of SNI, ACI’99 and the MJN Priestly’s suggestion, there are 4 safety principles toward the column. The principles are as follows: (1) the tips of columns along the (lo) must be confined; (2) the column must be strong toward the friction failure (Vic) and stronger from elastic; (3) the column must be safe toward lateral bending (Sh); and (4) guaranteed structure by the philosophy “Strong column weak beam”, and (C) supporting the suggestion of Prof.Ir.Priyo Suprobo,MS.Ph.D and Ir. Faimun about the new approach suggestion for minimum confined requirement SK.SNI T-15-1991-03. At beam and column (1999). Lemlit ITS.Keywords: forced based design, performance based design, displacement based design, anti-earthquake column safety, minimum confined requirementPermalink: http://www.ejournal.undip.ac.id/index.php/mkts/article/view/3925[How to cite: Sunardi, 2005, Studi Pengamanan Kolom terhadap Konsep Perencanaan Struktur Tahan Gempa Ditinjau dari Peraturan SK SNI T-15-1991-03 ACI ’99 dan Usulan MJN Priestly, Jurnal Media Komunikasi Teknik Sipil, Volume 13, Nomor 3, pp. 96-105]
Operator Kawin Silang pada Algoritma Genetik Riil untuk Variabel Rencana Selalu Positif Arfiadi, Yoyong
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 22, Nomor 2, DESEMBER 2016
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (914.505 KB) | DOI: 10.14710/mkts.v22i2.12883

Abstract

Genetic algorithms have been used to solve various optimization problems. One of the advantages of genetic algorithms is that they have the ability to solve complex optimization problems in a simple way. By using genetic algorithms, the near global optimum can be achieved easily. Although in the early development, binary coded genetic algorithms are more popular, recently real coded genetic algorithms are widely used to solve engineering problem’s optimization. The advantage of using real coded genetic algorithms is the ability of the crossover operator to explore a larger domain of interest. As a result the use of crossover in real coded genetic algorithms may have a detrimental effect, as it can explore the domain that is very far from the expected domain. In the civil engineering area, most variables are positive. Therefore, it is needed to develop a crossover operator that can produce positive-only offspring. In this paper an asymmetric crossover is proposed to solve this problem. It is shown in the experiments that this crossover has a good performance in achieving optimum results.
ANALISIS STRUKTUR KOTA DI JAWA TERHADAP KONSUMSI BBM DENGAN MENGGUNAKAN BIPLOT Handajani, Mudjiastuti; Riyanto, Bambang
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 18, Nomor 1, PEBRUARI 2010
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (232.187 KB) | DOI: 10.14710/mkts.v18i1.4257

Abstract

ABSTRACK The structure of the city including the variables that affect the city's transportation system. In this case, the structure of the city associated with transport and fuel consumption, which consists of vast areas of administration and woke up, population, population density (net and gross), and GDP (constant and valid). The purpose of this study was to analyze the variable structure of the city, urban transportation systems, and fuel consumption as well as analyzing the relationship between urban transport systems on fuel consumption metropolitan cities, major cities, and towns are in Java. Biplot analysis is descriptive statistical technique multiple dimensions (multivariate) that can be presented visually to present simultaneous observations of n objects and p variables in the space plane (dimension 2), so that the characteristics of variables and object of observation and the relative position between object observations with variables can be analyzed. Biplot analysis results showed that each metropolitan and large cities have different characteristics of urban structure, while the city was relatively similar characteristics. The existence of a positive linear relationship and a very strong connection between population and consumption of premium, that is, the consumption of premium will increase if the population is also increasing. Keywords : City structure, fuel consumption, biplot analysis ABSTRAK Struktur kota termasuk dalam variabel yang mempengaruhi sistem transportasi kota. Dalam hal ini, Struktur kota yang terkait dengan transportasi dan konsumsi bahan bakar, yang terdiri dari luas administrasi daerah dan terbangun, penduduk, kepadatan penduduk (netto dan brutto), dan PDRB (konstan dan berlaku). Tujuan dari penelitian ini adalah untuk menganalisis variabel Struktur kota, sistem transportasi perkotaan, dan konsumsi bahan bakar serta menganalisis hubungan antara sistem transportasi perkotaan terhadap konsumsi bahan bakar kota metropolitan, kota besar, dan kota sedang di Jawa. Analisis Biplot adalah teknik statistika deskriptif dimensi ganda (multivariate) yang dapat disajikan secara visual guna menyajikan secara simultan n obyek pengamatan dan p variabel dalam ruang bidang datar (dimensi 2), sehingga ciri-ciri variabel dan obyek pengamatan serta posisi relatif antar obyek pengamatan dengan variabel dapat dianalisis. Hasil analisa biplot menunjukkan bahwa setiap kota metropolitan dan kota besar memiliki karakteristik Struktur perkotaan yang berbeda, sedangkan kota sedang memiliki karakteristik yang relatif sama. Adanya hubungan linear positif dan sangat kuat antara penduduk dan konsumsi premium, artinya, konsumsi premium akan meningkat jika populasi juga meningkat. Kata kunci: Struktur Kota, Konsumsi BBM, Analisis Biplot
Faktor-faktor Berpengaruh Terhadap Kinerja Manajer Proyek Konstruksi dengan Pendekatan Structural Equation Modeling Sahadi, Sahadi; Wibowo, M. Agung
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 18, Nomor 1, PEBRUARI 2010
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (4287.635 KB) | DOI: 10.14710/mkts.v18i1.7849

Abstract

All activities depend on the human resources who carry out those activities. Therefore, attention and amphasis on the development of human resources are a strategic and an urgent need. There are several resources that must be controlled by a contractors, which include the human resources, and they play the most important role among other resources because all the aspects of construction activity and the use of other resources is always controlled by humans such as the use of financial, material, aquipment and work method resources, and so on. This study aims to find out the influence of leadership, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward/salary, and work satisfaction on the performance of construction project managers using structural equation modeling (SEM) approach. The result of study indicate that relationship, organization climate, organization culture, communication climate, trust, work motivation, work experience, reward/salary and work satisfaction have a positive influence on the performance. Variables that have dominant influence on the performance of construction project managers are reward and work experience. Keywords : Performance of project managers, Leadership, Organization culture, Work motivation, SEM.   Abstrak   Segala aktifitas tergantung dari sumber daya manusia yang melaksanakan, untuk itu perhatian dan peneanan terhadap pengembangan sumber daya manusia merupakan hal yang stategis dan mendesak. Beberapa sumber daya yang harus dikelola oleh kontraktor, sumber daya manusia adalah sumber daya yang mempunyai peran paling besar karena setiap bagian kegiatan konstruksi atau penggunaan-penggunaan sumber daya lain akan selalu dikendalikan oleh manusia, misalnya penggunaan sumber daya keuangan, sumber daya material, sumber daya peralatan, penggunaan metode kerja dan seterusnya. Tujuan penelitian ini adalah untuk mengetahui pengaruh kepemimpinan, iklim organisasi, budaya organisasi, iklim komunikasi, kepercayaan, motivasi kerja, pengalaman kerja, imbalan/gaji, dan kepuasan terhadap kinerja pada manajer proyek kostruksi dengan pendekatan structural equation modeling (SEM). Hasil penelitian menunjukkan bahwa kepemimpinan, iklim organisasi, budaya organisasi, iklim komunikasi, kepercayaan, motivasi kerja, pengalaman kerja, imbalan/gaji, dan kepuasan berpengaruh positif terhadap kinerja. Sedangkan variable yang berpengaruh dominan terhadap kinerja manajer proyek konstruksi adalah imbalan dan pengalaman kerja. Kata-kata Kunci : Kinerja manajer proyek, kepemimpinan budaya organisasi, motivasi kerja, SEM.
Respons Dinamik Pelat Beton Akibat Beban Kendaraan yang Bergerak dengan Kecepatan Konstan Liucius, Yenny Untari; Alisjahbana, Sofia W
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 25, Nomor 1, JULI 2019
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (861.243 KB) | DOI: 10.14710/mkts.v25i1.20011

Abstract

This analysis studies about the dynamic response of isotropic slab with the semi rigid type of edge conditions which is solved by the Modified Bolotin Method. The dynamic response mostly depends on the characteristics of the slab and the velocity of the transverse load acting on the slab. This analysis uses 10 km/h, 20 km/h, and 30 km/h as the velocity of the transverse load, and 110 km/h as the comparing velocity. Results show that maximum dynamic responses for each velocity does not always occur on the center of the slab, so the characteristics of the slab may be vary. The dynamic response is closest to maximum when the velocity of the load is 110 km/h because it is closer to the critical velocity of the system which is 112 km/h. This analysis assumed the slab is used for the bus’ parking ramp. Thus with the 10 km/h until 30 km/h velocity assumption for parking ramp is still quite safe because the velocity is far below the critical velocity of the system. Also the dynamic response of the system is far lower than the maximum response of slab.
Pengaruh Pergerakan U – Turn (Putaran Balik Arah) Terhadap Kecepatan Arus Lalulintas Menerus (Studi Kasus Jalan Brigjen Myoenoes , Kota Kendari) Putra, Adris Ade; Sarewo, Ady Sarwono
MEDIA KOMUNIKASI TEKNIK SIPIL Tahun 17, Nomor 1, PEBRUARI 2009
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (233.563 KB) | DOI: 10.14710/mkts.v17i1.3774

Abstract

Existence U-Turn facilities in Brigjen M. Yoenoes road aim to give opportunity for vehicle rider doing turning movement, but existence U-Turn facilities in Brigjen M. Yoenoes road exactly generate friction to security and freshmnet through traffic. This matter is happened because vehicle volume which doing turning movement very high especially in peak hour. The aim of this research doing for to know influence value turning movement variable (time turning movement and time headway) and density in Brigjen M. Yoenoes road to level of performance especially space-mean speed through traffic. Used data in this analysis obtained from result survey in three days start from 07.00 – 18.00 WITA in peak hour. From result analysis with program SPSS 11.5 for Windows, obtained regression equation for every direction traffic. For direction Pasar Baru – Kota : . For direction Kota – Pasar Baru : . From this equation, we can to know influence value which generated from independent variable to space-mean speed through traffic descent. Keywords : time turning movement, time headway, density ABSTRAK Keberadaan fasilitas U-TURN pada Jalan Brigjen M. Yoenoes bertujuan untuk memberikan peluang untuk pengemudi kendaraan dalam melakukan pergerakan memutar. Tetapi kebaradaan U-TURN  pada Jalan Brigjen M. Yoenoes tidak sepenuhnya memberikan keamanan dan kenyamanan dalam berlalu lintas. Hal ini terjadi karena volume kendaraan yang melakukan pergerakan memutar sangat tinggi terutama pada jam sibuk. Tujuan dilakukan penelitian ini adalah untuk mengetahui besarnya pengaruh variabel pergerakan memutar (waktu pergerakan memutar dan waktu antara dan kepadatan) di Jalan Brigjen M. Yoenoes pada tingkat keadaan terutama kecepatan rata-rata ruang kendaraan. Data yang digunakan dalam analisis ini diperoleh dari hasil survey dalam 3 hari mulai dari Pukul 07.00-18.00 WITA pada jam puncak. Dari hasil analisis dengan program SPSS 11,5 For Window diperoleh persamaan regresi untuk setiap arah lalu lintas.Untuk arah Pasar Baru-Kota :Y=31,506 + 0,380 X1 + 0.092 X2 Untuk arah Kota-Pasar Baru :Y=44,063 – 0.189 X1 + 0.97 X2. Dari nilai ini kita dapat mengetahui besarnya pengaruh yang diperoleh dari variable bebas untuk kecepatan rata-rata ruang pada arus lalu lintas menurun. Kata Kunci: Waktu pergerakan memutar, waktu antara, kepadatan
Perbedaan Komitmen dan Kinerja antara Manajer Proyek Konstruksi Besar dan Manajer Proyek Konstruksi Kecil dengan Pendekatan Analisis Diskriminan Sahadi, Sahadi; Agung Wibowo, M.
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 20, Nomor 1, JULI 2014
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (551.187 KB) | DOI: 10.14710/mkts.v20i1.9249

Abstract

This study aims to analyze, first, the difference of commitment between big and small construction project managers, second, the difference of performance between big and small construction project managers. In particular, the commitment has eleven (11) discriminating indicator variables and the performance has nine (9) discriminating indicator variables. The results of study using the discriminant analysis approach indicate that from the eleven (11) indicator variables of commitment only two (2) indicator variables that discriminate big and small construction project managers, namely a. Y15= you are very concerned with the fate of this company, b. Y110= this company highly respects your values and goals, and from the 9 (nine) indicator variables of performance only one indicator variable that discriminates big and small construction project managers, namely Y26= the attitude towards work implementation
Osilasi Dalam Tangki Pendatar (Surge - Tank) Akibat Penutupan Turbin Secara Mendadak Sangkawati, Sri
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 13, Nomor 2, Edisi XXXII, JUNI 2005
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (466.758 KB) | DOI: 10.14710/mkts.v13i2.3916

Abstract

Surge tank in hydro-power generation plant is placed on the transition between conveyance pipe channel and chute pipe. The dimension of surge tank is designed based on water mass oscillation result in minimum hydrodynamic pressure, such that it can determine form, type, and configuration of the tank. The sudden increase in hydrodynamic pressure (positive water hammer) is caused by abrupt decrease in water discharge to the turbine to reduce load to the generator. This positive water hammer is dependent on the discharge and time of closure of the valve. Mathematical equation that describes mass oscillation in the reservoir-pipe channel-surge tank is dynamic and solution can be easily using numerical techniques. This paper demonstrates the water hammer oscillation in a surge tank. The result shares that, 1) when the ratio between surge tank area (As) to the pipe area (AT), As/AT below 5, the maximum increase in water pressure is significant, ii) when the ratio As/AT greater than 5, the increase in water pressure is not significant and tends to have slight differences. Key Words : surge-tank, mass oscillationsPermalink: http://ejournal.undip.ac.id/index.php/mkts/article/view/3916[How to cite: Sangkawati, S., 2005, Osilasi  Dalam Tangki Pendatar (Surge - Tank) Akibat Penutupan Turbin Secara Mendadak, Jurnal Media Komunikasi Teknik Sipil, Volume 13, Nomor 2, pp. 122-129]

Filter by Year

2003 2025


Filter By Issues
All Issue Volume 31, Nomor 2, DESEMBER 2025 (IN PROGRESS) Volume 31, Nomor 1, JULI 2025 Volume 30, Nomor 2, DESEMBER 2024 Volume 30, Nomor 1, JULI 2024 Volume 29, Nomor 2, DESEMBER 2023 Volume 29, Nomor 1, JULI 2023 Volume 28, Nomor 2, DESEMBER 2022 Volume 28, Nomor 1, JULI 2022 Volume 27, Nomor 2, DESEMBER 2021 Volume 27, Nomor 1, JULI 2021 Volume 26, Nomor 2, DESEMBER 2020 Volume 26, Nomor 1, JULI 2020 Volume 25, Nomor 2, DESEMBER 2019 Volume 25, Nomor 1, JULI 2019 Volume 24, Nomor 2, DESEMBER 2018 Volume 24, Nomor 1, JULI 2018 Volume 23, Nomor 2, DESEMBER 2017 Volume 23, Nomor 1, JULI 2017 Volume 22, Nomor 2, DESEMBER 2016 Volume 22, Nomor 1, JULI 2016 Volume 21, Nomor 2, DESEMBER 2015 Volume 21, Nomor 1, JULI 2015 Volume 20, Nomor 2, DESEMBER 2014 Volume 20, Nomor 1, JULI 2014 Volume 19, Nomor 2, DESEMBER 2013 Volume 19, Nomor 1, JULI 2013 Tahun 18, Nomor 1, PEBRUARI 2010 Tahun 17, Nomor 3, OKTOBER 2009 Tahun 17, Nomor 2, JUNI 2009 Tahun 17, Nomor 1, PEBRUARI 2009 Tahun 16, Nomor 3, OKTOBER 2008 Tahun 16, Nomor 2, JUNI 2008 Tahun 16, Nomor 1, PEBRUARI 2008 Tahun 15, Nomor 3,OKTOBER 2007 Tahun 15, Nomor 2, JUNI 2007 Tahun 15, Nomor 1, PEBRUARI 2007 Volume 14, Nomor 3, Edisi XXXVI, OKTOBER 2006 Volume 14, Nomor 2, Edisi XXXV, JUNI 2006 Volume 14, Nomor 1, Edisi XXXIV, PEBRUARI 2006 Volume 13, Nomor 3, Edisi XXXIII, OKTOBER 2005 Volume 13, Nomor 2, Edisi XXXII, JUNI 2005 Volume 13, Nomor 1, Edisi XXXI, PEBRUARI 2005 Volume 12, Nomor 3, Edisi XXX, OKTOBER 2004 Volume 12, Nomor 2, Edisi XXIX, JULI 2004 Volume 12, Nomor 1, Edisi XXVIII PEBRUARI 2004 Volume 11, Nomor 1, Edisi XXV, PEBRUARI 2003 More Issue