cover
Contact Name
M. Imron
Contact Email
imron@yudharta.ac.id
Phone
-
Journal Mail Official
jkie@yudharta.ac.id
Editorial Address
-
Location
Kab. pasuruan,
Jawa timur
INDONESIA
JKIE (Journal Knowledge Industrial Engineering)
ISSN : 24600113     EISSN : 25414461     DOI : -
JKIE is scientific journal that publishes research in the field of Industrial Engineering such: Industria Management, Optimization, Innovation, Ergonomics/Human Factors Engineering, Supply Chain Management, Operation Research, Statistic, Management Systems, Time & Motion Study, Manufacturing System, Production Planning & Inventory Control, Logictis, Engineering Economy, Modelling Systems, Simulation, Facilities Design & Work Space Design, Quality Engineering (SPC/TQM), Operation Management & Productivity Improvement, Product Design & Development, and Decision Planning & Analysis etc.
Arjuna Subject : -
Articles 118 Documents
Project Management Analysis of Manufacturing Laboratory Development by Considering Risk Factors Yudha Adi Kusuma; Alim Citra Aria Bima

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i1.2928

Abstract

Laboratory construction project is a project owned by the University of XYZ Madiun. Laboratory construction has the goal of adding practice facilities to the industrial engineering department. Laboratory construction supports the offline learning process when students do practice activities. This project was carried out by PT ABC with a project value of Rp. 500.000.000. PT ABC was selected through an appointment stage by the project owner without a tender process. Laboratory construction process was built for 12 weeks. Laboratory construction process was built from early June 2021 until the end of August 2021. Manufacturing laboratory projects require a review of project management and risk management in their implementation so that project work can avoid delays in time. Project management analysis shows that the critical track is the activity of A-C-F-G with a total duration of 84 days and the probability of the project being completed is 96.16%. The calculation of the average profit obtained by project implementers is Rp 59.893.125. Risk management measurements show that high category risks are erratic weather, poor safety regulations in the field, and low levels of management discipline.
Analysis of Product Defects in the Packing Production Process at PT.XYZ Using FTA and FMEA Methods Rina Sri Wulandari; Luqman Hakim; Rivandy Fahmi Haris

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i1.2981

Abstract

A product defect is a product failure that does not meet the quality and standards that have been determined from a product. Product defects occur because of a problem in the production process. With a product defect in the coffee packing production process at PT. XYZ, one of which is unstable weight and the exp date is not printed, so the researcher analyzes the problem with one of the six sigma methods, namely using the FTA and FMEA methods. Failure Tree Analysis (FTA) is a graphical model containing the various parallels and various sample errors that lead to the occurrence of an undesired event. Meanwhile, Failure Mode and Effect Analysis (FMEA) is a structured procedure to identify and prevent possible failure modes. In this study, four types of defects occur in the packaging process including folded packaging, top leaking packaging, bottom leaking packaging, blurry exp date.
The Influence Of Customer Service Quality On Financial Expectations With Roq Approach (Case Study: X Maternity Hospital in Sidoarjo) Reiny Ditta Myrtanti; Sujianto

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i1.2985

Abstract

The tight competition between Maternity Hospital services in Sidoarjo Regency is marked by the increasing number of couples of childbearing age and family planning participants, as well as the high rate of pregnant women and the birth of babies, becoming a big challenge for the Maternity Hospital management to be able to know, understand and fulfill the needs and desires of consumers. patients) so that customer satisfaction can be met, for example fast, accurate, friendly service, at an adequate price. This is the reason for the management to make improvements from the quality program that has been run previously. However, not all quality improvement programs carried out will provide benefits for the management, because many of these improvement programs are wasteful after being implemented. This is because the management does not focus on the quality improvement program that will be implemented, that is, it does not determine which variables are the most influential for the quality improvement program.At this X Maternity Hospital, complaints or complaints are often found from patients about the services provided, for example at the counter service which is less prompt in providing services, and the inconvenience of services in the inpatient room. The data was obtained from the Maternity Hospital management through the available suggestion/vote box, then used as a basis/reference for making a questionnaire as a follow-up to the problems that arose. Therefore, this study discusses the Maternity Hospital's efforts in planning a quality improvement program that is in accordance with the wishes and needs of patients by selecting and determining the variables or dimensions that have the most influence on the quality improvement program to be carried out, as well as assessing its financial feasibility by using the Return on Quality (ROQ) approach.From the application of ROQ at a Maternity Hospital X in Sidoarjo Regency, two quality improvement programs were determined from the two dimensions of the X Maternity Hospital service process, they are beds and patient registration. The ROQ value of each program based on the discount rate (5%, 10%, 15%) is 1.54; 0.99; 0.49 for the inpatient room service process, and 1.25; 0.61; 0.24 for the process of front office and administration services. For this reason, the dimension that is the focus of the quality improvement program is the inpatient room service process with the dimensions of the bed.
Managing Waste Using the Integration of Lean and Ergonomic Methods Naufal Abiyyu Mahdi; Nina Mahbubah

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i1.3015

Abstract

CV. AAA is a company engaged in the production of water tanks. As a player in the manufacturing industry, CV. AAA performs continuous improvement in each production process to minimize losses due to non-value-added activities due to waste and ineffectiveness in carrying out the production process. This research objective evaluates activities that cause waste in the water tank production line with a Lean approach and ergonomics. This research begins by describing the current state map to identify waste throughout the production flow. Followed by the analysis of the occurrence of non-value-added activities at the stages of the production process. The results showed that three wastes were identified, namely Waiting, Defect, and Excess Processing. The non-optimal production process is because the tools used are manual labor which can lead to the risk of muscle injury to the operator. Nordic Body Map Scoring result obtained from four operators found that the final score is from medium to high level. Scenario improvement presented in future state map shows in reducing cycle time as well as lead time.
Analysis Of Fabric Inventory Control In Koko Clothing Busines With Economic Order Quantity and Economic Production Quantity Methods Ari Diharto; Deny Andesta

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i1.3031

Abstract

Ramli collection is an industry that is engaged in garments in producing special men's peddles, especially in koko clothes who want a good and fitting basic material arrangement. The product that will be researched is koko clothes. One of the problems in Ramli collection is the purchase of raw materials that are not good and appropriate. This study determines the optimal amount using the EOQ and EPQ methods. The research was conducted from January 2021 to December 2021. This study uses the EOQ and EPQ methods to determine the optimal calculation on raw materials of koko clothes, minimize inventory costs, determining Re-Order Points and fabric ordering costs. From the results of calculations with the EOQ method to get the optimal amount of raw materials for Catton Venus 184 roll and cattonferrari fabric 159 rolls. Calculation of the minimum inventory cost using the EOQ method on Catton Venus fabric Rp.55.877.600 and Catton Ferrari fabric Rp.42.445.640, calculation by EPQ method on Catton Venus fabric Rp.55.634.980 and Catton Ferrari Fabric Rp.42.220.070. The supply point (Re-Order Point) again occurs when the Catton Venus fabric is 20 rolls and the Catton Ferrari 16 roll fabric.
Energi Analysis of Significant Energy Use in Tire Company using Pareto Diagram Kamaluddin Kamaluddin; Irwan Budiman; Anita Christine Sembiring

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i2.3252

Abstract

Melalui Peraturan Pemerintah No. 70 tahun 2009 tentang Konservasi Energi, pemerintah telah mewajibkan bagi pengguna energi besar yaitu pengguna yang menggunakan energi sama atau lebih dari 6000 setara ton minyak per tahun wajib melaksanakan kegiatan konservasi energi atau manajemen energi. Dalam penelitian di objek penelitian yang merupakan perusahaan ban, perusahaan tersebut merupakan salah satu industri yang menggunakan energi lebih dari 6000 setara ton minyak per tahun dan merupakan salah satu industri yang secara langsung memberikan dampak bagi penyediaan energi nasional. Menyadari dampak dari ketersediaan dan kenaikan harga energi ini terutama bagi industri, maka perusahaan dituntut perlu melakukan tindakan yang tepat dan bijaksana dalam mengkonsumsi energi melalui program konservasi dan penghematan energi. Penerapan Manajemen Energi yang terlihat di perusahaan masih digabungkan dengan struktur fungsional organisasi yang ada sehingga fungsi kontrolnya menjadi lemah. Pentingnya penentuan prioritas dalam melaksanakan konservasi energi, dengan menggunakan metode diagram pareto 20/80 akan memberikan penyusunan sasaran yang lebih tepat dalam mencapai efisiensi energi. Pemilihan prioritas akan memberikan potensi yang cukup besar untuk peningkatan kinerja energi, di samping itu penentuan prioritas akan membuat organisasi lebih efektif dan efisien.
Minimizing Work Accidents in the Shipyarding Industry Using JSA and HAZOP Methods Sandi Oktavianus; Arniwika Waruwu; Anita Christine Sembiring

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i2.3287

Abstract

PT. Cahaya Baru Shipyard is a company engaged in ship repair. Activities in shipyards have various risks, one of which is work accidents. The research aims to determine the risk of work accidents from shipbuilding activities, risk control and suggestions for improvement. This study identifies risks using the Job Safety Analysis (JSA) method and assisted by the Hazard And Operability Study (HAZOP) method to control potential hazards and recommendations for new safety systems to minimize work accidents. The research method used is qualitative. The results of the study show that most work accidents occur in welding and cutting activities with a percentage of 23.3%. Providing personal protective equipment and workers reminding each other to use safety equipment and to remain careful in doing their work, implementing standard operating procedures (SOPs) and existing work instructions can be a way that can be done to minimize work accidents.
Determining the Optimal Rice Distribution Route in Medan City Using Dijkstra's Algorithm Jason Jason; Anita Christine Sembiring; Viviana Viviana

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i2.3288

Abstract

Distribution is an activity carried out to spread the product throughout the market so that consumers can buy it. Distribution can also affect the price of goods. Therefore, the distribution must be effective. The purpose of this study is to determine the shortest route that is effective in distribution so that product prices are not high and the company does not suffer losses. The data analysis method used is Dijkstra's Algorithm obtained with data on the distance between the starting point and the destination point through predetermined points. The calculation results show that the shortest and fastest routes to be taken based on the dijkstra algorithm are: A-20-19-F-26-C-D-11-12-B-E with a distance of 40.71 km. There are several road routes that can be chosen to be used but the shortest route that can be taken is 40.71 km. Medan Rice Distributors are expected to choose the shortest transportation route so that rice distribution can be carried out quickly and optimally.
Quality Analysis of Digital Service Virtual Plasa Witel Samarinda Using e-Servqual Method Syafitri Khotijah; Dharma Widada; Theresia Amelia Pawitra

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i3.3082

Abstract

Virtual Plasa is a new digital service from PT. Telkom, released in 2020, with the intention of providing communication services from Telkom concisely. This study aims to determine the quality of service at Virtual Plasa, identify and evaluate the causes of the gap, and recommend improvement. The results show that Virtual Plasa services have a significant level of service quality. Even if the average expectation is higher than the average perception, the difference is modest, and the overall service is good. The Wilcoxon test results show that only two of eighteen attributes have a significant negative value, which is the website has a positive image and follow up on the website as promised. The attribute "Follow up on the website as promised" appears in the IPA diagram's priority quadrant. This attribute's fulfillment gap is caused by information gap (-0.58). Recommendation for this issue involve scheduling management to monitor directly the transactions done, creating a record feature, and asking customers to fill out the feedback section after completing transactions in Virtual Plasa. On the IPA diagram, the attribute "website has a positive image" is found in the low priority quadrant. The recommendation include creating defined guidelines for the Virtual Plasa image.
Design of Soybean Dregs Separator Tool for Tempe Production in MSMEs Pasuruan Regency Using Pulse Method and Rula Method Ayik Pusaka Ningwati; Achmad Misbah; Muhammad Hermansyah

Publisher : Department of Industrial Engineering - Universitas Yudharta Pasuruan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35891/jkie.v9i3.3505

Abstract

Micro, Small and Medium Enterprises (MSMEs) are a source of the regional and national economy. MSMEs have many roles in the social economy including being the main actor in economic activity, providing employment, playing a role in local economic development and community empowerment, a source of innovation, and creating new markets. Pasuruan Regency is one of the tempe centers in East Java. More than 200 families are engaged in Tempe production, including those in the Bangil sub-district, Purwodadi sub-district, Kejayan sub-district and Sukorejo sub-district. The main problem faced by Tempe Production SMEs is the machine or soybean dregs separator used, still using traditional tools (humans) which are less effective and efficient so that it takes a long time and there are working positions for workers who lack ergonomics, causing workload which is more. The purpose of this activity is how to make or design a design tool and work aid test for soybean dregs separator machines from soybean seeds to reduce the workload of making soybeans into tempeh and to be able to reduce the portion of the workload on tempe-making workers with anthropometric calculations.

Page 11 of 12 | Total Record : 118


Filter by Year

2018 2023


Filter By Issues
All Issue