cover
Contact Name
Rio Rahma Dhana
Contact Email
riorahma@yahoo.co.id
Phone
+6281515602211
Journal Mail Official
tekniksipil.unisla@yahoo.co.id
Editorial Address
Jl. Veteran No. 53 Lamongan
Location
Kab. lamongan,
Jawa timur
INDONESIA
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan
ISSN : 25032399     EISSN : 26207222     DOI : https://doi.org/10.30736/cvl
Core Subject :
Jurnal Penelitian Teknik Sipil UNISLA (ISSN2503-2399) adalah jurnal ilmiah yang bertujuan untuk mengkomunikasikan hasil dan riset teknologi dalam rangka untuk pengembangan teknologi di bidang teknik sipil. Sasaran pembaca adalah para ilmuwan, akademis, serta praktisi dari bidang teknik sipil sebagai berikut: Rekayasa Struktural, Teknik Geotek, Rekayasa Sumberdaya Hidrolik dan Air, Rekayasa Transportasi, dan Manajemen Konstruksi.
Arjuna Subject : -
Articles 202 Documents
Analysis of Technical Factors Causing Deviation of Spun Pile Coordinate Points in the Data Center Construction Project Sopar Butarbutar; Mardiaman
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1609

Abstract

Foundation works, especially in high-precision buildings like data centers, must account for pile coordinate point deviation, which can cause structural eccentricity, pile cap redesign, cost overruns, and schedule delays. This study examines technical parameters affecting spun pile foundation coordinate deviation in a data center construction project (Data Centre X). A total of 153 respondents-surveyors, piling operators, site engineers, and supervisors-completed a standardized questionnaire administered through online platforms using a quantitative descriptive technique, and their responses were ranked using the Relative Importance Index (RII) to identify the technical aspects affecting pile position variation. Measurement-related factors dominate deviation, with total station instrument condition and calibration having the highest RII value (0.963), pile point marking clarity (0.957), and surveyor, operator, and foreman communication (0.945). Equipment condition, operator compliance, and experience also mattered. The data show that technical and operational factors, not geotechnical issues, determine spun pile coordinate variations. To assure foundation accuracy in high-precision building projects, this study emphasizes stringent measuring, staking out, and field coordination quality control.
Hydrological Analysis of Flash Floods Using FFPI and API in the Krueng Meuh Watershed, Aceh Muhammad Rona; Cut Azizah; Zuraihan
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1624

Abstract

Flash floods are highly destructive hydrometeorological disasters that threaten infrastructure integrity and public safety in the Krueng Meuh Sub-watershed, Bireuen District. This study aims to conduct a comprehensive hydrological analysis of flash flood triggers by evaluating physical characteristics and land-use dynamics. The methodology integrates Digital Elevation Model (DEM) analysis for slope mapping, daily rainfall data (2020-2024) to calculate the five-day Antecedent Precipitation Index (API5), and remote sensing to detect land-cover changes. These parameters were synthesized within a Geographic Information System (GIS) using the Flash Flood Potential Index (FFPI) approach to identify spatial vulnerability zones. The results reveal that over 50% of the study area consists of steep to very steep slopes dominated by erodible geological materials. Soil conditions reached high saturation levels prior to flood events, with API5 values ranging from 57.6 to 71.3 mm. Furthermore, the massive conversion of forest into plantations (57.68%) has significantly increased surface runoff coefficients. FFPI analysis classifies the majority of the sub-watershed into moderate to very high vulnerability levels. These findings provide critical scientific evidence for local authorities to formulate spatial-based mitigation strategies and adaptive watershed management.
Effects of Finite Element Modeling Parameters on Seismic Response of a Hospital Building Muhammad Puja Fathurrachman; Syahrul Satar; Multasam; Adhriyansyah Effendy Saputra
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1705

Abstract

Accurate structural modeling is essential for reliable seismic performance evaluation, yet default software settings in finite element analysis tools are frequently adopted without adequate calibration. This study investigates the sensitivity of seismic response in a five-story reinforced concrete hospital building to three key modeling parameters: shell element mesh size, insertion point configuration, and beam end length assumption. A mesh convergence study was first conducted across six discretization levels to identify an optimal mesh size. Subsequently, four structural models were developed using a Design of Experiment (DoE), with M1 (top insertion point, clear length) serving as the reference baseline. Linear seismic analysis was performed using the Equivalent Lateral Force (ELF) method in accordance with SNI 1726:2019, with natural period, base shear force, and story displacement adopted as response indicators. Results show that a 1 m mesh size provides an optimal balance between accuracy and computational efficiency. Insertion point configuration was identified as the dominant parameter, with centroid-based models producing up to 21% longer natural periods and 46% greater story displacements compared to M1. Base shear was exclusively governed by the end length assumption, as the ELF method renders it insensitive to stiffness-related parameters.
Analysis of Environmental Drainage Capacity in Pasar Melintang Village, Lubuk Pakam District, Deli Serdang Regency Yogi Pratama; Yudha Hanova
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1719

Abstract

Waterlogging caused by increased surface runoff is a major challenge for drainage infrastructure in semi-urban areas. This study aims to analyze design flood discharge, evaluate the hydraulic capacity of existing drainage channels, and formulate management recommendations in Pasar Melintang Village, Lubuk Pakam Subdistrict, Deli Serdang Regency. A descriptive-quantitative methodology was applied by integrating primary measurement data of notched trapezoidal channels with secondary rainfall data from Global Precipitation Measurement (GPM) satellite (2015–2024). Frequency analysis using the Log Pearson Type III distribution yielded a design rainfall of R24 = 73.279 mm/day (T = 2 years), rainfall intensity of I = 181.083 mm/hour (Mononobe method), and design flood discharge of Q = 0.224 m3/second (Rational method, CW = 0.464, A = 0.96 ha). Evaluation using Manning’s Equation indicates an existing channel capacity of QS = 0.219 m3/second. The capacity deviation of 2.23% is well below the 5% technical tolerance threshold, confirming that the channel's geometric design is adequate. The capacity deficit stems from physical obstructions (15 cm sedimentation, wild vegetation, and household waste) rather than geometric design errors. A structured periodic maintenance program is recommended to restore full hydraulic capacity.
Analysis of the Center of Gravity and Moment of Inertia of Concrete Beam and Column Cross-Sections Using Manual and AutoCAD Methods in a Simple Building: the Barracks of Infantry Bengkulu Nazmi Aprilla Wibowo; Simon Petrus Hamonangan Simorangkir
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1722

Abstract

Concrete beams and columns are important structural elements that support the strength, stability, and safety of a building. This study aims to compare the centroid and moment of inertia of concrete beam and column cross-sections calculated using manual methods and AutoCAD in the Barracks D project of the 847th TP Infantry Battalion in Bengkulu. This study uses a descriptive comparative method. The analysis was conducted on cross-sections in the support areas, namely B1–K1 and B2–KP, and in the field areas, namely B1, B2, and K1. AutoCAD modeling was carried out using Polyline, Region, and Massprop commands to determine the geometric properties of each cross-section. The results show that the field-area cross-sections have very similar results between the manual and AutoCAD methods. The difference in centroid coordinates was 0.00%, while the moment of inertia deviation was very small, approximately 0.00000004%. However, larger differences were found in the support areas. The X-coordinate differences were 58.58% and 64.29%, while the Y-coordinate differences were 33.28% and 40.00%. The moment of inertia differences were 4.32% and 4.01%. The manual method provides detailed calculation steps but requires more time. AutoCAD is faster and more efficient, especially for complex cross-sections. However, its accuracy depends on the drawing data and only represents gross cross-sectional geometry.
Seismic Performance of Reinforced Concrete Hotels with Different Shear Wall Configurations Muhammad Febrian Syifa'ul Mufid; Meity Wulandari
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1734

Abstract

The seismic performance of high-rise reinforced concrete buildings is strongly influenced by the configuration of their lateral force-resisting system. This study evaluates a 15-story reinforced concrete hotel building by comparing five structural configurations: an existing moment-resisting frame, bearing wall, core wall, perimeter shear wall, and combined wall systems. Three-dimensional structural models were developed in SAP2000 and analyzed using Response Spectrum Analysis according to SNI 1726:2019 for Site Class SD and Seismic Design Category D, while reinforced concrete members were designed based on SNI 2847:2019. Structural performance was evaluated using the fundamental natural period, modal mass participation, inter-story drift, story displacement, and dual-system behavior. All modified configurations reduced the natural period, indicating greater structural stiffness than the existing model. The combined wall system exhibited the most balanced seismic performance by satisfying inter-story drift limits in both principal directions while distributing lateral base shear between the moment-resisting frame and shear walls at 60.15%/39.85% in the X-direction and 74.88%/25.12% in the Y-direction. These findings demonstrate that an appropriate shear wall configuration significantly improves the seismic performance of reinforced concrete buildings in seismic regions.
GIS-Based Weighted Overlay Analysis for Assessing the Potential of Bioretention and Rain Gardens for Stormwater Management Intan Aprillyanti; Mohd. Abi Rafdi
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1739

Abstract

The increase in built-up areas in the Dr. Cipto Mangunkusumo Street Corridor in Cirebon City has caused a lack of water absorption areas, thus increased surface runoff and potentially caused puddles. This condition indicates the need for the implementation of green infrastructure as an effort to manage rainwater sustainably. This study aims to analyze the potential for implementing Bioretention and Rain Garden based on the level of land suitability in the research area. The method used is a spatial quantitative method with primary data from field observations and secondary data obtained from BPBD, PUPR, and BIG. The analysis was carried out using a Geographic Information System (GIS). Land suitability analysis uses the Weighted Overlay method based on land use parameters, soil type, and slope gradient. The results show that the Dr. Cipto Mangunkusumo Street Corridor in Cirebon City is dominated by trade and service areas with a fairly high level of runoff. Based on the Weighted Overlay analysis, most of the research area is included in the suitable class for the implementation of Bioretention and Rain Garden. The application of both types of green infrastructure has the potential to reduce surface runoff, increase infiltration and support sustainable urban drainage management in Cirebon City.
Ultimate Load and Workability Optimisation of Coconut-Shell Plain-Concrete Beams Incorporating Sikament-NN Fahrizal Zulkarnain; Ainurrasyid
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1741

Abstract

Agricultural coconut-shell waste offers a renewable alternative to mineral aggregate, but its porous surface may reduce concrete workability and mechanical performance. This study evaluates whether Sikament-NN can compensate for these effects in plain-concrete beams. Twenty-one specimens measuring 600 x 150 x 150 mm were produced in seven mixtures: a normal-concrete control, three mixtures containing 1.5%, 1.7% and 1.9% coconut-shell fragments as partial coarse-aggregate replacement, and three corresponding mixtures incorporating 2.3% Sikament-NN by cement mass. Slump, 28-day compressive strength and ultimate beam load under central loading were assessed. Increasing coconut-shell content without admixture reduced slump from 100 to 75 mm and decreased mean ultimate beam load from 37.00 to 35.37 kN. Sikament-NN restored slump to 100-110 mm and maintained mean ultimate beam load between 36.50 and 36.87 kN. The mixture containing 1.9% coconut shell and Sikament-NN achieved 29.73 MPa compressive strength and a 36.80 kN ultimate beam load, retaining 98.78% and 99.46% of the control values, respectively. Because the archived test record did not preserve sufficient crack-pattern evidence to distinguish diagonal-shear failure from mid-span flexural-tensile failure, the response is reported as ultimate beam load rather than shear capacity. The findings indicate that Sikament-NN effectively offsets the workability loss and most of the mechanical-performance reduction associated with low-volume coconut-shell incorporation.
Analysis Of Supply Chain Management Effectiveness in Improving Project Time and Cost Performance Through Digitalism Supply Chain Management Ely Mulyati; Muhammad Wahyu Desriandi
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1743

Abstract

The increasing complexity of oil and gas construction projects requires effective Supply Chain Management (SCM) supported by digital integration to achieve efficient schedule and cost performance. This study aims to analyze the effectiveness of SCM and Digital Supply Chain Management (DSCM) in the Demineralized Facility Construction Project at Company ABC. A quantitative approach was employed using purposive sampling involving 58 respondents engaged in supply chain, procurement, engineering, logistics, project management, and contractor activities. Primary data were collected through a structured five-point Likert-scale questionnaire and analyzed using IBM SPSS Statistics 31 through validity, reliability, multicollinearity, descriptive, and multiple linear regression analyses. The independent variables comprised SCM practices and DSCM implementation through Smart-GEP, Enterprise Resource Planning (ERP), and IOG E-Commerce, while the dependent variable was project performance, measured through schedule and cost performance. The regression model was statistically significant (F = 107.953, p < 0.001) and explained 79.7% of the variation in project performance (R² = 0.797). DSCM showed a significant positive effect on project performance, demonstrating that integrated digital platforms strengthen procurement transparency, information integration, real-time monitoring, and project coordination. These findings emphasize the strategic contribution of DSCM to schedule and cost performance in oil and gas construction projects.
Optimization of the Leachate Drainage System and Methane Gas Utilization at the Tamangapa Landfill: An Infrastructure and Energy Engineering Study Muhammad Agus Budiawan; Astuti Indah Amalia; Subhan Najamuddin; Darwis Baso
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1745

Abstract

This research evaluates the leachate drainage system and methane gas utilization at the Tamangapa Landfill and formulates optimization strategies based on infrastructure and energy engineering. A quantitative descriptive method was employed using field observations, interviews, and primary and secondary data analysis. The evaluation covered drainage hydraulic capacity, operational conditions, leachate quality, and methane utilization potential. Results showed that the existing drainage hydraulic capacity was 0.074 m³/s, whereas leachate flow reached 0.090 m³/s, resulting in a 17.8% capacity deficit. BOD concentrations exceeded the effluent quality standard of 150 mg/L, while COD exceeded 300 mg/L and TSS exceeded 100 mg/L. Conversely, Total Nitrogen (<60 mg/L) and Cd (<0.1 mg/L) remained within applicable standards at all monitoring points and periods. Using the IPCC FOD method, methane generation potential was estimated at 45,245 m³ CH₄/day, with 27,147 m³ CH₄/day recoverable at 60% collection efficiency. Assuming 35% generator efficiency and 10% parasitic load, net electricity generation potential reached 3.54 MW, equivalent to 30.97 GWh/year. Integrating drainage optimization and LFGTE can improve leachate management, recover energy, and reduce methane emissions. These estimates provide an initial scenario for engineering planning and require field verification, detailed design, and further techno-economic assessment under actual operating conditions and seasonal variations.