cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 30 Documents
Search results for , issue "Volume 4, Nomor 1, Februari 2021" : 30 Documents clear
PERBANDINGAN INVESTASI DENGAN SEWA ALAT BERAT PADA PROYEK PEMBANGUNAN HOTEL IBIS RADEN SALEH JAKARTA Geraldy Marcell; Hendrik Sulistio
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10480

Abstract

The Ibis Raden Saleh Hotel's construction project by PT Andal requires the use of heavy equipment as a supporting factor for development. Heavy equipment reviewed in this study are excavators, dump trucks, and tower cranes. The research carried out wants to consider investment or heavy equipment rental whether it is feasible or not feasible as a decision making. This study's data collection method is the interview method as primary data and documentation as secondary data. Methods of data analysis using financial analysis, namely NPV (Net Present Value), IRR (Internal Rate of Return), BCR (Benefit Cost Ratio), and PBP (Payback Period). From the calculation results, the NPV value of investment is - IDR 12,216,701,317.38 and the NPV value for rent is IDR 16,083,224,759.60. The IRR value for investment is 0% and the IRR value for rent is 22.28%. The BCR value for investment is 0.62 and the BCR value for lease is 4.81. The PBP value for investment cannot yet be assessed and the PBP value for the lease is 5.0596 months. From this research, it can be concluded that a feasible activity is heavy equipment rental. ABSTRAKProyek konstruksi Hotel Ibis Raden Saleh oleh PT Andal membutuhkan pemakaian alat berat sebagai salah satu faktor penunjang pembangunan. Alat berat yang ditinjau pada penelitian ini adalah excavator, dump truck, dan tower crane. Penelitian dilakukan untuk mempertimbangkan pemilihan antara investasi atau sewa alat berat menguntungkan atau tidak menguntungkan untuk dilakukan sebagai pengambilan keputusan. Metode pengumpulan data yang digunakan pada penelitian ini adalah metode wawancara sebagai data primer dan dokumentasi sebagai data sekunder. Metode analisis data menggunakan studi analisis finansial yaitu NPV (Net Present Value), IRR (Internal Rate of Return), BCR (Benefit Cost Ratio), dan PBP (Payback Period). Berdasarkan hasil perhitungan didapatkan nilai NPV untuk investasi sebesar – Rp 12,216,701,317.38 (NPV < 0) dan nilai NPV untuk sewa sebesar Rp 16,083,224,759.60 (NPV > 0). Besaran nilai IRR untuk investasi sebesar 0% (IRR < MARR) dan nilai IRR untuk sewa sebesar 22.28%. (IRR > MARR). Besaran nilai BCR untuk investasi sebesar 0.62 (BCR< 1) dan besaran nilai BCR untuk sewa sebesar 4.81 (BCR > 1). Besaran nilai PBP untuk investasi belum dapat dinilai (PBP > umur proyek) dan besaran nilai PBP untuk sewa adalah 5.0596 bulan (PBP < umur proyek). Berdasarkan penelitian, dapat disimpulkan kegiatan yang menguntungkan dilakukan adalah sewa alat berat.
ANALISIS PERILAKU PENUMPANG KRL BOGOR – JAKARTA KOTA PADA MASA PANDEMI DAN PENGARUHNYA TERHADAP POLA PERJALANAN Yohanes William Lois; Dewi Linggasari; Hokbyan Angkat
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10464

Abstract

Transportation is a primary need that cannot be separated from life to continue their daily activities, especially nowadays which require a trip bya transportation. Transportation has many options, one of the primadonna for trips in the city of Jabodetabek is the KRL Commuter Line, provided by PT. Kereta Commuter Indonesia. However, currently the Covid-19 pandemic has an impact on transportation trips, including the KRL Commuter Line. Since then, policies regulated by the government have been implemented to stop the spread of Covid-19, such as limiting the number of passengers and enforcing health protocols for passengers and officers. The existence of these restrictions has an effect on transportation travel. This research was conducted to determine the level of awareness of KRL passengers behavior toward the health protocols applied when carrying out activites outside the home and the effect on their travel patterns, as wel as to find out the policies realized by KRL operator officers. The research data were obtained through a questionnaire, then processed by normative anda descriptive analysis methods. From the analysis, it was found that both passengers and officers were quite alert and good at implementing existing policies and passengers revealed that this policy affects their travel patterns. ABSTRAKTransportasi merupakan kebutuhan primer yang tidak dapat dipisahkan dari kehidupan untuk menyambung kegiatannya sehari-hari khususnya pada masa sekarang yang memerlukan suatu perjalanan dengan transportasi. Transportasi punya banyak pilihan, yang menjadi salah satu primadona perjalanan dalam kota Jabodetabek adalah KRL Commuter Line, yang disediakan oleh PT. Kereta Commuter Indonesia. Namun, saat ini adanya wabah pandemi Covid-19 memberikan dampak dalam perjalanan transportasi tidak terkecuali pada KRL Commuter Line. Semenjak itu diterapkanlah kebijakan-kebijakan yang diatur pemerintah guna memutus penyebaran Covid-19, seperti pembatasan jumlah penumpang dan pemberlakuan protokol kesehatan untuk penumpang maupun petugas. Adanya batasan-batasan ini menyebabkan pengaruh pada perjalanan transportasi. Penelitian ini dilakukan untuk mengetahui tingkat kesadaran perilaku penumpang KRL terhadap protokol kesehatan yang diterapkan ketika melakukan kegiatan di luar rumah dan pengaruh terhadap pola perjalanannya, juga untuk mengetahui kebijakan yang direalisasikan oleh petugas operator KRL. Data penelitian didapat melalui kuesioner, lalu diolah dengan metode analisis normatif dan deskriptif. Dari hasil analisis, didapatkan baik penumpang maupun petugas sudah cukup awas dan baik dalam menerapkan kebijakan yang ada dan penumpang mengungkapkan dengan adanya kebijakan ini mempengaruhi pola perjalanannya.
DESAIN ULANG DAN ANALISIS RESPONS STRUKTURAL PERKERASAN LENTUR PADA JALAN TOL JAKARTA-CIKAMPEK Verell Rengga Harsvardan; Anissa Noor Tajudin
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10504

Abstract

This research will redesign the flexible pavement on the Kalihurip-Cikampek toll road using three flexible pavement design methods, namely the 2002, 2013 and 2017 methods, and analyze the structural responses that occur in the form of horizontal and vertical strain, the main components. In calculating the value of repetition of permits against fatigue damage (Nf) and groove cracks (Nd), it is processed using the KENPAVE program. Furthermore, the calculation results of the flexible pavement thickness, the value of repetition of permits against fatigue damage (Nf) and groove crack damage (Nd) were compared from the three methods. The method used is mechanistic-empirical. Primary data is obtained from the Ministry of Public Works and Public Housing and LHR0 starting in 2020, taking into account traffic growth from 2020 to 2035, as well as secondary data assumptions by referring to previous regulations and research. The results of this study indicate that the 2002 method produced the largest pavement thickness, while the 2013 and 2017 methods produced relatively the same pavement thickness. However, the 2002 method produced the largest repetition of permits against fatigue damage (Nf) and groove cracks (Nd). So it can be concluded that the 2017 method produces a better design. ABSTRAKPenelitian ini akan mendesain ulang perkerasan lentur pada Jalan Tol Jakarta-Cikampek ruas Kalihurip-Cikampek menggunakan tiga metode desain perkerasan lentur yaitu metode 2002, 2013, dan 2017, serta menganalisis respons struktral yang terjadi berupa regangan horisontal dan vertikal, komponen utama dalam menghitung nilai repetisi izin terhadap kerusakan fatik (Nf) dan retak alur (Nd), diolah menggunakan program KENPAVE. Selanjutnya dibandingkan hasil perhitungan tebal perkerasan lentur, nilai repetisi izin terhadap kerusakan fatik (Nf) dan kerusakan retak alur (Nd) dari ketiga metode tersebut. Metode yang digunakan mekanistik-empiris. Data primer didapat dari Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) dan LHR0 dimulai pada tahun 2020, memperhitungkan pertumbuhan lalu lintas dari tahun 2020 sampai 2035, serta data sekunder asumsi dengan tetap mengacu pada peraturan dan penelitian sebelumnya. Hasil penelitian ini menunjukkan bahwa metode 2002 menghasilkan tebal perkerasan terbesar, sedangkan metode 2013 dan 2017 menghasilkan tebal perkerasan yang relatif sama. Namun metode 2002 menghasilkan repetisi izin terhadap kerusakan fatik (Nf) dan retak alur (Nd) terbesar. Sehingga disimpulkan metode 2017 menghasilkan desain lebih baik.
PERBANDINGAN EFISIENSI LATERAL FREE DAN FIXED HEAD MENGGUNAKAN ELEMEN HINGGA PADA GALIAN TANAH KOHESIF DAN NON-KOHESIF Arya Arya; Inda Sumarli; Ali Iskandar
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.11055

Abstract

ABSTRACTFoundation is the important way for designing upper structure or below structure. Designing foundation is a must, especially for the complicated structure. There are so many things to be focused on sturdy foundation. One of those design steps is designing foundation with lateral loading. Lateral loadings are so many different variances of it, depends on the location of installation. Then, we can identify the efficiency of individual pile on group pile cause of lateral loadings. The efficiency of pile can be analysed by Finite Element metho, which is the foundation is located on the real condition of loading and soils between the pile. And then, Finite Element is supposed to identify the foundation with free-headed pile or fixed-headed pile on cohesive or cohesionless soils. ABSTRAKFondasi merupakan hal penting bagi struktur atas maupun struktur bawah. Perencanaan fondasi sendiri sangat dibutuhkan, apalagi untuk membuat struktur yang rumit, diperlukan fondasi yang kuat. Banyak sekali hal-hal yang harus diperhatikan untuk bisa merancang fondasi yang kokoh. Salah satunya dengan perancangan pembebanan akibat beban lateral. Beban lateral sendiri dapat bermacam-macam bentuknya, bergantung pada pondasi tersebut dipasang di daerah yang seperti apa. Efisiensi lateral tiang yang umum digunakan, didapatkan dari eksperimen di lapangan, dimana kondisi kepala tiang adalah pada kondisi free-head. Hal ini bertujuan juga untuk melihat kinerja fondasi tersebut apabila dalam kondisi Free Head, maupun Fixed Head dengan tanah kohesif dan non-kohesif.
ANALISIS KESTABILAN JALAN GIRIAN - KEMA PADA DAERAH PERBUKITAN MINAHASA UTARA Pricilia Imanuela Jozias; Gregorius Sandjaja Sentosa
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10493

Abstract

The construction of a highway in a hilly area requires attention to the stability of the land on which the road body is laid. On the widening of the road between the cities of Girian-Kema, North Sulawesi, the road body is designed to pass through hillside areas that have a slope of about 36°. In designing the road body in the hilly area must be considered the stability of the slopes on the left and right side of the road, the ability to support the soil and other structures so that the road is in a safe condition. To check the safety of this roadway, three locations of the most critically considered points will be selected to fail. At the location, slope stability analysis was carried out using the MIDAS GTS NX program and obtained the most critical security factors ranging between 1,1 and 1,4. To find out the carrying capacity of the soil, calculated the possibility of roads supporting the most extreme load using standard a crated load of 80 kN, from the analysis is known that the stress that occurs if strengthened with soil geogrid can support the load better by 46,1042 kN/m2, and obtained efficiency of 18,83%.Pembuatan jalan raya di daerah perbukitan memerlukan perhatian terhadap kestabilan tanah tempat badan jalan diletakkan. Pada pelebaran jalan antar kota Girian-Kema, Sulawesi Utara, badan jalan dirancang harus melewati daerah lereng perbukitan yang memiliki kemiringan lereng sekitar 36°. Dalam merancang badan jalan pada daerah perbukitan tersebut harus diperhatikan kestabilan lereng yang berada di kiri dan kanan jalan, kemampuan daya dukung tanah dan struktur lainnya agar jalan berada dalam kondisi aman. Untuk memeriksa keamanan lintasan jalan ini, dipilih tiga lokasi titik yang dianggap paling kritis akan mengalami kegagalan. Pada lokasi tersebut dilakukan analisis kestabilan lereng dengan menggunakan Program aplikasi MIDAS GTS NX dan diperoleh Faktor kemanan paling kritis berkisar antara 1,1 dan 1,4. Untuk mengetahui daya dukung tanah, dihitung kemungkinan jalan mendukung beban yang paling ekstrem menggunakan beban gandar standar 80 kN, dari analisis diketahui bahwa tegangan yang terjadi jika diperkuat dengan geogrid tanah dapat mendukung beban dengan lebih baik sebesar 46,1042 kN/m2, dan diperoleh efisiensi 18,83%.
ANALISIS SISA MATERIAL DAN PENYEBAB UTAMANYA PADA PROYEK BANGUNAN RUMAH TINGGAL Jonathan Felixius; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10393

Abstract

Material is one of the most important components with a 40-60% contribution of all the project costs. Waste in the construction field can be interpreted as a loss or a loss of material resources, time (about labor and equipment) and capital, which is caused by activities that cost money, directly or indirectly, but does not add any value to the product for users of construction services. This research aims to search for the waste material with the most impact and its percentage, along with the main cause behind the presence of the waste material. This research was conducted by processing primary data in the form of a Likert scale questionnaire.  In the process, this research used the Relative Importance Index (RII) method with a significance level of 5% and assisted with Statistical Product and Service Solutions (SPSS) application to test and calculate the data. The result of this research shows that waste material with the most impact is ready mix concrete 10%, reinforcing steel 9.87%, and ceramics 9.5%. The main causes which result in the presence of the waste material are lack of blueprint information, error due to the labor, and the act of abandoning or throwing the material. ABSTRAKMaterial berfungsi sebagai bahan dalam pekerjaan lapangan yang mempunyai peranan sangat penting sebesar 40 – 60% dari seluruh biaya proyek tersebut. Sisa dalam konstruksi dapat kita artikan sebagai kehilangan atau kehilangan sumber daya materi, waktu (dengan melihat tenaga kerja dan peralatan) dan juga modal, hal ini disebabkan oleh aktivitas yang memerlukan biaya, baik secara langsung atau tidak langsung, tetapi sama sekali tidak menambahkan nilai pada produk jasa konstruksi. Tujuan dalam penelitian ini ialah mencari sisa material yang paling mempengaruhi beserta persentasenya dan penyebab utama dari sisa material tersebut. Penelitian ini dilakukan dengan mengolah data primer berupa kuesioner skala Likert. Dalam prosesnya, penelitian ini memakai Metode Relative Importance Index (RII) dengan taraf signifikansi 5% dan dibantu dengan aplikasi Statistical Product and Service Solutions (SPSS) untuk menguji dan menghitung data. Hasil dari penelitian ini mendapati sisa material yang paling mempengaruhi proyek ialah beton ready mix 10%, baja tulangan 9.87%, dan keramik 9.5%. Penyebab utama dari sisa material tersebut ialah informasi gambar yang kurang, kesalahan yang diakibatkan oleh tenaga kerja, dan membuang atau melempar material.
STUDI IDENTIFIKASI RISIKO PADA PROYEK INFRASTRUKTUR DI INDONESIA Wilwin Wilwin; Arianti Sutandi
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10646

Abstract

Infrastructure projects such as buildings and transportation infrastructure have many risks and uncertainties in the implementation process. To minimize this risk, it is necessary to apply risk management in project implementation. In this study, a literature study was conducted to analyze the risk identification methods and potential risks involved in Indonesia's infrastructure projects. An analysis was conducted by comparing the risk identification method and the risk potential in the infrastructure project risk journal collected using the basic mathematic method. Based on research, the most widely discussed identification method is the questionnaire. Furthermore, a risk comparison was carried out in the 2 most discussed categories. The checklist method was carried out so that the material and equipment, and humans were obtained as the most discussed category. The results showed that in building projects, the most discussed risk was the increase in material prices (71%) in the material and equipment category and labor accidents (86%) in the human category. Meanwhile, in transportation infrastructure projects, the most discussed risks were unavailability or shortage of material (67%) in the material and equipment category and the low quality of labor (83%) in the human category. ABSTRAK Proyek infrastruktur seperti bangunan gedung dan prasarana transportasi memiliki banyak risiko dan ketidakpastian dalam proses pelaksanaannya. Untuk meminimalkan risiko tersebut perlu diterapkannya manajemen risiko didalam pelaksanaan proyeknya. Dalam penelitian ini dilakukan studi literatur untuk menganalisa metode identifikasi risiko dan potensi risiko yang terdapat pada proyek infrastruktur di Indonesia. Dilakukan analisa dengan melakukan perbandingan metode identifikasi risiko dan potensi risiko pada jurnal risiko proyek infrastruktur yang telah dikumpulkan menggunakan metode matematis sederhana. Berdasarkan penelitian, metode identifikasi yang paling banyak dibahas adalah kuisioner. Selanjutnya dilakukan perbandingan risiko pada 2 kategori yang paling banyak dibahas, penentuan kategori ini dilakukan dengan metode checklist sehingga didapatkan kategori material dan peralatan, dan manusia sebagai kategori yang paling banyak dibahas. Hasil penelitian menunjukkan bahwa pada proyek bangunan gedung, risiko yang paling banyak dibahas adalah kenaikan harga material (71%) pada kategori material dan peralatan dan kecelakaan tenaga kerja (86%) pada kategori manusia. Sedangkan pada proyek prasarana transportasi, risiko yang paling banyak dibahas adalah tidak tersedianya atau kekurangan material (67%) pada kategori material dan peralatan dan rendahnya kualitas tenaga kerja (83%) pada kategori manusia.
ANALISIS PENGARUH PENCARIAN SENSASI DAN LOCUS OF CONTROL TERHADAP PILIHAN KECEPATAN SAAT MENGEMUDI DI JABODETABEK Alfredo Samuel; Widodo Kushartomo; Leksmono Suryo Putranto
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10381

Abstract

Speed is the amount that indicates the distance traveled by the vehicle divided by the time traveled. Sensation-seeking and locus of control play an important role when humans choose speed options while driving. Sensation seeking is a personality tra feature expressed in search of new, varied, complex experiences and intense accompanied by a willingness to take risks in order to feel the experience. Meanwhile, the locus of control is the belief that the individual has about the causes that occur in the life of the individual. This study was conducted to find out how much influence sensation seeking as well as locus of control on a person's driving speed choices and know how much locus of control affects a person when looking for sensation. Data for the study was obtained through an online questionnaire. This research will use Structural Equation Modeling Method or SEM. The results of the study found that sensation seeking is a factor that greatly influences a person's speed choice of 65.61%, while the locus of control is a factor that slightly affects a person's speed choice of 1.64%. In addition, the locus of control is quite affecting a person when looking for sensations which is 23.04%.ABSTRAKKecepatan adalah besaran yang menunjukan jarak yang ditempuh kendaraan dibagi waktu yang ditempuh. Pencarian sensasi dan locus of control mempunyai peran penting ketika manusia memilih pilihan kecepatan saat mengemudi. Pencarian sensasi adalah ciri kepribadian yang diekspresikan dalam hal untuk mencari pengalaman baru, bervariasi, kompleks dan intens yang disertai kemauan untuk mengambil risiko agar merasakan pengalaman tersebut. Sedangkan, locus of control adalah keyakinan yang dimiliki individu mengenai penyebab yang terjadi di kehidupan individu tersebut. Penelitian ini dilakukan untuk mengetahui seberapa besar pengaruh pencarian sensasi serta locus of control terhadap pilihan kecepatan mengemudi seseorang dan mengetahui seberapa besar locus of control mempengaruhi seseorang ketika mencari sensasi. Data untuk penelitian didapatkan melalui kuesioner online. Penelitian ini akan menggunakan Metode Structural Equation Modeling atau SEM. Dari hasil penelitian didapatkan bahwa pencarian sensasi merupakan faktor yang sangat mempengaruhi pilihan kecepataan seseorang yaitu sebesar 65,61%, sedangkan locus of control merupakan faktor yang sedikit mempengaruhi pilihan kecepatan seseorang yaitu sebesar 1,64%. Selain itu, locus of control cukup mempengaruhi seseorang ketika ingin mencari sensasi yaitu sebesar 23,04%.
ANALISIS ATP-WTP PENUMPANG KERETA BANDARA LINTAS MANGGARAI-SOEKARNO HATTA Calvin Viryananda; Dewi Linggasari; Hokbyan Angkat
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10452

Abstract

In determining public transport rates, it is necessary to compare the value of Ability to Pay (ATP) and Willingness to Pay (WTP) for Soekarno-Hatta Airport Train service users to pay a sum of money to pay for the services and facilities they receive. The purpose of this research is to analyze the value of ATP and WTP of Soekarno-Hatta Airport Train service users. The method of collecting research data online is to all respondents of the Soekarno-Hatta Airport Train who have used this service. The research data obtained were then processed and analyzed to obtain the results of the characteristics of the respondents, the ATP value, and the WTP value. The results of the analysis on the existing tariff at the BNI City / Manggarai Station are Rp. 70,000, - the ATP and WTP values are Rp. 75,260, - and Rp. 63,887, -. The ATP and WTP values for Duri Station are Rp. 75,260, - and Rp. 64,424, -. The results of this study indicate that the ATP value is greater than the WTP and the WTP value is smaller than the existing tariff. This data shows that the prevailing tariffs are not commensurate with the services received.ABSTRAKDalam menentukan tarif angkutan umum perlu dibandingkan nilai Ability to Pay (ATP) dan Willingness to Pay (WTP) pengguna jasa Kereta Bandara Soekarno Hatta untuk membayar sejumlah uang untuk membayar jasa dan fasilitas yang diterimanya. Tujuan dari penelitian ini adalah untuk menganalisis besaran nilai ATP dan WTP pengguna jasa Kereta Bandara Soekarno-Hatta. Metode pengumpulan data penelitian secara online kepada seluruh responden Kereta Bandara Soekarno-Hatta yang pernah menggunakan jasa tersebut. Data penelitian yang diperoleh kemudian diolah dan dianalisis untuk mendapatkan hasil karakteristik responden, nilai ATP, dan nilai WTP. Hasil analisis pada tarif eksisting pada Stasiun BNI City/Manggarai sebesar Rp.70.000,- didapat nilai ATP dan WTP masing-masing adalah Rp. 75.260,- dan Rp. 63.887,-. Nilai ATP dan WTP untuk Stasiun Duri masing-masing adalah Rp. 75.260,- dan Rp. 64.424,-. Dari hasil penelitian ini menunjukkan bahwa nilai ATP lebih besar dibandingan WTP dan nilai WTP lebih kecil dibandingan tarif eksisting. Data ini menunjukkan bahwa tarif yang berlaku saat ini tidak sepadan dengan pelayanan yang diterima.
KARAKTERISTIK PERILAKU BEKERJA DARI RUMAH SELAMA PANDEMI COVID-19 TERHADAP FREKUENSI PERJALANAN SEHARI-HARI Rudy Suko Haryanto; Leksmono Suryo Putranto
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10510

Abstract

During this pandemic, the government enforced PSBB so that the majority of office workers were required to do work from home (work from home). However, there are still many problems with people who can do their work from home and people who have to come to their place of work. Therefore this study aims to determine the frequency of trips of the Jabodetabek community based on the trips they took during PSBB period which was enforced by the government. This research was conducted online by distributing online questionnaires to people who live in Jabodetabek and who are already working. Processing data analysis using the help of the Statistical Package for the Social Sciences (SPSS) application. Based on the processed data, the results are, there is no significant difference between respondents who do work from home and not. Based on the characteristics table during PSBB, respondents who work from home tend to meet clients via video call compared to respondents who do not work from. home. Based on the characteristics table before PSBB, respondents who work from home tend to be stuck in traffic when leaving or coming home from work compared to respondents who do not work from home.ABSTRAKDimasa pandemi ini, pemerintah memberlakukan PSBB sehingga mayoritas pekerja kantoran diwajibkan untuk melakukan pekerjaan dari rumah (work from home). Akan tetapi masih terdapat banyak masalah pada orang-orang yang bisa melakukan pekerjaannya dari rumah dan orang yang harus datang ke tempat mereka bekerja. Oleh sebab itu penelitian ini bertujuan untuk mengetahui frekuensi perjalanan masyarak jabodetabek berdasarkan perjalanan yang mereka lakukan saat masa PSBB yang diberlakukan oleh Pemerintah. Penelitian ini dilakukan secara online dengan menyebarkan kuesioner online kepada orang-orang yang berdomisili di jabodetabek dan yang sudah bekerja. Pengolahan analisis data menggunakan bantuan aplikasi Statistical Package for the Social Sciences (SPSS). Berdasarkan data yang sudah diolah didapatkan hasil yaitu, Berdasarkan tabel karakteristik saat PSBB,responden yang melakukan work from home cenderung bertemu client via video call di banding responden yang tidak melakukan work from home. Berdasarkan tabel karakteristik sebelum PSBB responden yang melakukan work from home cenderung terjebak kemacetan saat berangkat atau pulang kerja di bandingkan responden yang tidak melakukan work from home.

Page 2 of 3 | Total Record : 30