cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 40 Documents
Search results for , issue "Volume 7, Nomor 1, Februari 2024" : 40 Documents clear
METODE KONSTRUKSI RIGID PAVEMENT PADA PROYEK JALAN TOL Suganda, Raihan; Untari, Yenny
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26652

Abstract

Road the most widely used means of land transportation on daily basis compared to non-stop air transportation, so volume of vehicles passing through the road must be supported by hardness the exit and entry roads passing through it so that road has a big impact on comfort, welfare and safety for road. Therefore, toll road construction was carried out where implementation planning was carried out using Pd T-14-2003 method which began by determining CBR value, construction of development project from land clearing, soil filling, soil compaction and rigid pavement. The technical formulation and aim is find out how rigid pavement worked thickness layers of rigid pavement has influenceon durability of toll roads by combining explanations regarding the construction process method. This research uses 2 data collection methods with qualitative and quantitative measurement data analysis. Furthermore, conclusion obtained that in the 2017 revised road pavement design manual stated that applicable regulations must be used to determine design life of new pavement. It is important to know according to the CBR provisions, if CBR value is less than 6% then land requires repair, conversely if the CBR value is greater than 6% then there is no need to repair the land. Abstrak Jalan merupakan sarana penting bagi manusia untuk mencapai suatu lokasi yang ingin dijangkau. Dengan adanya perkembangan perbaikan rigid pavement untuk kemajuan struktur jalan baik di metropolitan maupun pedesaan, maka pemerintah terus melakukan peningkatan besar pada jalan-jalan negara. Rigid Pavement merupakan sistem pembuatan jalan yang digunakan pada jalan tol. Keuntungan dari perkerasan kaku juga umurnya yang panjang, visibilitas permukaan pengendaraan yang lebih baik dan perawatan yang lebih sedikit. rumusan dan tujuan penulisan jurnal untuk mengetahui bagaimana teknik pengerjaan rigid pavement jalan tol. Ketebalan pengerjaan rigid pavement memberi pengaruh terhadap ketahanan jalan tol atau terdapat faktor lain di luar keterlibatan pelaksanaan rigid pavement sehingga memadukan penjelasan terkait metode kontruksinya. Hasilnya pengerjaan rigid pavement tentu memberi efek di masa depan dengan ketebalan penggunaan semen beton tidak boleh dilakukan secara suka hati karena perencanaan Perkerasan Jalan (MDPJ) 2017 disebutkan bahwa tebal pelat beton diarahkan dalam perencanaan dengan menggunakan metode Pd T-14-2003. Dimana kontruksi pembangunan jalan tol yang dimulai dari pembersihan lahan – penimbunan tanah- pemadatan tanah – rigid pavement sampai dengan jalan siap pakai dapat direncanakan dengan rencana umur 20-40 tahun juga harus pas dalam penentuan CBR
EVALUASI PENGGUNAAN RANGKA BAJA HOLLOW SEBAGAI SISTEM PENYANGGA BEKISTING PLAT LANTAI PADA PROYEK X Wijaya, Angga; Wijaya, Hendy
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26666

Abstract

In the construction industry, the protection of formwork is a crucial aspect in designing and constructing sturdy and safe structures. Therefore, the success of an effective and efficient formwork support system plays a crucial role in ensuring the safety of the structure. One solution implemented in this industry is the use of hollow steel (square-shaped pipes) as a formwork support system for floor plates. This study presents the results of the analysis of hollow steel used in construction, particularly in buildings. The research aims to determine the ability of hollow steel in supporting the load of floor formwork. Data collection methods involve observation, interviews, and testing using a structural analysis program to determine the strength of hollow steel in supporting the load of floor formwork. The research results indicate that the hollow steel frame has a deflection of 0.0641 m, where the deflection is still below the maximum allowable limit. The hollow steel frame produces balanced lateral forces and moment forces, making it safe for use. However, the strength ratio of the steel frame does not meet the requirements due to a strength ratio greater than 1. Therefore, additional support is needed in the middle of the floor plate. Abstrak Dalam industri konstruksi, perlindungan terhadap bekisting merupakan aspek yang sangat krusial dalam merancang dan membangun struktur yang kokoh dan aman. Oleh karena itu, keberhasilan sistem penyangga bekisting yang efektif dan efisien memiliki peran yang sangat penting dalam memastikan keselamatan struktur. Salah satu solusi yang telah diimplementasikan di dalam industri ini adalah penerapan baja hollow (pipa berbentuk kotak) sebagai sistem penyangga bekisting plat lantai. Studi ini menyajikan hasil analisis baja hollow yang digunakan dalam konstruksi khususnya pada bangunan. Penelitian ini bertujuan untuk mengetahui kemampuan baja hollow dalam menahan beban bekisting plat lantai. Metode pengumpulan data dilakukan dengan melakukan pengamatan dan melakukan wawancara, serta untuk metode pengujian dilakukan dengan menggunakan salah satu program analisis struktur untuk menentukan kekuatan baja hollow dalam menahan beban bekisting plat lantai. Hasil penelitian menunjukkan bahwa rangka baja hollow memiliki lendutan sebesar 0,0641 m dimana besar lendutan yang terjadi masih di bawah batas maksimum lendutan yang diperbolehkan dan rangka baja hollow menghasilkan gaya dalam lintang dan gaya dalam momen yang seimbang, sehingga rangka hollow aman untuk digunakan. Namun rasio kekuatan dari rangka baja belum memenuhi persyaratan karena terdapat rasio kekuatan yang lebih besar dari pada 1, maka diperlukan penyangga tambahan pada bagian tengah plat lantai.
ANALISIS PERAN QUANTITY SURVEYOR PADA PROYEK JISC (JATILUHUR INDUSTRIAL SMART CITY) Theddy, Vincent; Asriningsih Pranoto, Wati
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26672

Abstract

Infrastructure development in Indonesia continues to increase overtime, not only in the capital area but in other cities as well. With infrastructure development in Indonesia, the need for labor has also increased. Not only are contractors, architects or consultants needed, but there are also quantity surveyors. QS’s a job that has an important role in construction. However, QS are still not well known by students or the general public. One of the roles of QS is to calculate cost estimates for construction, but there are still many roles for a QS. The problem to be discussed in this research is the role of quantity surveyors in the Jatiluhur Industrial Smart City (JISC) project, especially on the owner's side. The purpose of this discussion is to find out what QS’s role is, especially on the owner's side. The research method is to conduct a literature study. Literature studies are carried out by reading and studying several journals and books. The results of the literature study were analyzed and concluded. QS is a job that is really needed by the owner to run the project smoothly. QS's role includes making BQs, participating in tenders, making work orders, controlling construction progress, procuring goods. Abstrak Pembangunan infrastruktur di Indonesia seiring waktu terus bertambah, tidak hanya di daerah ibukota saja melainkan di kota-kota lainnya juga. Dengan adanya Pembangunan infrastruktur di Indonesia ini kebutuhan akan tenaga kerja pun meningkat. Tidak hanya kontraktor, arsitek, ataupun konsultan yang dibutuhkan dalam suatu proyek, melainkan ada juga quantity surveyor. Quantity surveyor merupakan salah satu pekerjaan yang memiliki peran penting dalam sebuah konstruksi. Namun quantity surveyor masih belum terlalu dikenal oleh mahasiswa atau masyarakat umum. Salah satu peran quantity surveyor adalah menghitung estimasi/perkiraan biaya pada suatu konstruksi. Quantity surveyor melakukan estimasi biaya dengan membuat rancangan anggaran biaya atau bill of quantities. Bill of quantities dibuat berdasarkan gambar dan spesifikasi proyek. Permasalahan yang ingin dibahas pada jurnal ini adalah peran quantity surveyor pada proyek JISC terutama pada pihak owner pada proyek JISC. Tujuan dari pembahasan ini adalah untuk mengetahui apa saja peran quantity surveyor terutama pada pihak owner pada proyek JISC dari tahap awal hingga akhir. Metode penelitian yang digunakan pada penelitian ini ada pengumpulan data primer dan sekunder. Dengan penelitian primer berupa studi literatur atau studi kepustakaan dengan membaca dan mempelajari jurnal dan buku dan sekunder berupa observasi dan wawancara dengan quantity surveyor.
OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK X MENGGUNAKAN METODE LEAST COST ANALYSIS Tanuwihardjo, Gervan Abraham; Anondho, Basuki
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26678

Abstract

Construction projects can be completed on time and the costs incurred are appropriate based on what was carefully planned. Optimizing time and costs is an effort to utilize relatively short time with minimum costs to achieve work with good results and profits while still paying attention to the quality and qualities of a project. The research on project X aims to analyze the optimum time and costs with additional workforce. This research uses the least cost analysis method. By using this method, the optimal project duration can be obtained with the minimum possible total project costs calculated from the activities that have the lowest cost slope. This research requires secondary data in the form of a Cost Budget Plan (RAB), time schedule and unit price analysis list. Based on research using the least cost analysis method with additional labor, it was found that the completion duration was reduced by 48 days with a total cost of Rp.12.527.874.866, direct costs of Rp.12.262.603.151, and indirect costs of Rp.265.271.714. Abstrak Optimalisasi waktu dan biaya adalah usaha pemanfaatan waktu yang relatif singkat dengan biaya yang minimum untuk mencapai suatu pekerjaan dengan hasil dan keuntungan yang baik dengan tetap memperhatikan mutu dan kualitas suatu proyek. Penelitian pada proyek X ini bertujuan untuk menganalisis waktu dan biaya optimum dengan adanya penambahan tenaga kerja. Penelitian ini menggunakan metode least cost analysis. Dengan menggunakan metode ini dapat diperoleh durasi proyek yang optimal dengan biaya total proyek seminimal mungkin dihitung dari kegiatan yang memiliki cost slope terendah. Pada penelitian ini memerlukan data sekunder berupa Rencana Anggaran Biaya (RAB), time schedule dan daftar analisa harga satuan. Berdasarkan penelitian melalui metode least cost analysis dengan penambahan tenaga kerja didapat pengurangan durasi penyelesaian selama 48 hari dengan biaya total sebesar Rp.12.527.874.866, biaya langsung sebesar Rp.12.262.603.151, dan biaya tak langsung sebesar Rp.265.271.714.
ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PENGERJAAN KOLOM DI PROYEK DNL Iskandar, Daniel Nathan; Pranata, Giovanni
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26716

Abstract

Productivity is key to a company's competitiveness, influencing project success and costs. This research analyzes labor productivity in column work on the DNL project by comparing it with SNI standards and the PUPR Ministerial Regulation. The method used in this research is Worksampling on the DNL project. The research results show a large difference between field and reference productivity. Reinforcement work has a productivity difference of 0.46 times from SNI and 1.28 times from PermenPUPR. This is due to the use of more efficient tools and implementation methods in the field. Increased productivity also occurs in formwork and casting work through the use of appropriate technology and tools. These comparisons provide important insights for project planners and future workforce performance assessments. Abstrak Produktivitas merupakan kunci daya saing perusahaan, mempengaruhi keberhasilan proyek dan biaya. Penelitian ini menganalisis produktivitas tenaga kerja pada pengerjaan kolom di proyek DNL dengan membandingkannya dengan standar SNI dan PermenPUPR. Metode yang digunakan dalam penelitian ini adalah Worksampling  pada proyek DNL. Hasil penelitian menunjukkan perbedaan besar antara produktivitas lapangan dan acuan. Pekerjaan pembesian memiliki perbedaan produktivitas sebesar 0,46 kali dari SNI dan 1,28 kali dari PermenPUPR. Hal ini disebabkan oleh penggunaan alat bantu dan metode pelaksanaan yang lebih efisien di lapangan. Peningkatan produktivitas juga terjadi pada pekerjaan bekisting dan pengecoran melalui penggunaan teknologi dan alat bantu yang sesuai. Perbandingan ini memberikan wawasan penting bagi perencana proyek dan penilaian kinerja tenaga kerja di masa mendatang.
PROYEKSI POTENSI PENGHEMATAN AIR DENGAN SISTEM PEMANENAN AIR HUJAN PADA RUSUNAWA Kurniawan, Vittorio; Sutandi, Arianti; Raharja, Michael Randy
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26747

Abstract

The declining supply of freshwater is the challenge in modern times and rainwater harvesting (RWH) is an alternative to solve the problem. This paper studies the potency of water saving at Rusunawa Muara Baru (Muara Baru Public Flat) by daily analysis instead of monthly or yearly analysis in order to take into account the rainwater tank’s capacity. The research is performed by projecting the daily rainfall during January 2019 – August 2020 onto the daily water use of the public flat occupants. Because the daily water consumption data does not exist, the paper sets the daily water consumption as per the issued standard and validates it with the real data. The water conservation rate of the RWH is determined by having the factual water usage volume reduced by the stored rainwater volume in daily timescale. The analysis presents 7,55 % water conservation during the research period. and 6,57 % by assuming average annual rainfall for Jakarta region. The daily analysis in this case does not produce different outcome compared to monthly or yearly analysis because the rainwater tank has large volume. However, daily analysis will be relevant when the storage capacity is small.. Abstrak Ketersediaan air bersih yang semakin sedikit merupakan tantangan di dunia modern dan sistem pemanenan air hujan (SPAH) merupakan salah satu alternatif solusi. Artikel ini meneliti potensi penghematan air di Rusunawa Muara Baru dengan analisis harian, bukan dengan analisis bulanan atau tahunan untuk mempertimbangkan kapasitas tampungan tangki air hujan. Penelitian ini dilakukan dengan memproyeksikan hujan pada Januari 2019 – Agustus 2020 ke kebutuhan air harian dari penghuni rusunawa. Karena data penggunaan air harian tidak ada, penelitian ini mengambil angka berdasarkan standar yang berlaku dan divalidasi dengan kebutuhan air faktual. Lalu, tingkat penghematan air oleh SPAH dihitung dengan mengurangi volume pemakaian air harian dengan volume air hujan yang ditampung secara harian. Hasil analisis menunjukkan bahwa SPAH menghemat air sebesar 7,55 % sepanjang periode penelitian dan 6,57 % dengan curah hujan tahunan rata-rata di wilayah Jakarta. Analisis harian di kasus ini tidak menghasilkan hasil yang berbeda dengan analisis bulanan atau tahunan karena besarnya volume tangki air hujan. Namun, analisis harian akan diperlukan bila kapasitas tampungan bervolume kecil.
PENERAPAN AUDIT KESELAMATAN JALAN DAN METODE HIRARC UNTUK PENANGANAN LOKASI RAWAN KECELAKAAN Pembuain, Ardilson; Matitaputty, Vemara M.; Waas, Richrisna H.; Pellaupessy, Yesly
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.27325

Abstract

Traffic accidents can occur due to unsafe road infrastructure. It is because deficiencies in road infrastructure create the potential for traffic accidents. Jalan Captain Piere Tendean in Ambon City which was included in the category of accident-prone areas. This research aims to determine potential risk of road hazard and suggestions for improvements. AKJ was used to identify and describe potential road infrastructure hazards, then the HIRARC method was used to assess the magnitude of the risk of potential hazards and provide suggestions for handling these potential hazards. The results of the analysis showed that the risk of potential hazard on the Captain Piere Tendean road section of those that was considered high risk are trees and plants on the side of the road, visibility at intersections and road lighting. Apart from that, intersection alignments, pedestrians, parking, traffic signs and edge drainage was included in the medium risk category. Meanwhile, markings, safety fences and road surface damage were included in the low risk. Improving safety on Jalan Captain Piere Tendean will be done by addressing or improving the safety problems identified above. Treatment should be prioritized for problems with high, medium, and low risks respectively. Abstrak Kecelakaan lalu lintas dapat terjadi karena infrastruktur jalan yang tidak berkeselamatan. Hal tersebut dapat terjadi karena defisiensi infrastruktur jalan menimbulkan potensi terjadinya kecelakaan lalu lintas. Ruas Jalan Kapten Piere Tendean, Kota Ambon termasuk dalam kategori daerah rawan kecelakaan. AKJ digunakan untuk mengidentifikasi dan mendeskripsikan potensi bahaya infrastruktur jalan kemudian metode HIRARC digunakan untuk menilai besar risiko potensi bahaya dan memberikan saran penanganan potensi bahaya tersebut. Hasil analisis menunjukkan bahwa risiko potensi bahaya pada ruas jalan Kapten Piere Tendean dari yang termasuk risiko tinggi adalah pohon dan tanaman sisi jalan, jarak pandang pada simpang dan penerangan jalan. Selain itu, alinyemen simpang, pejalan kaki, parkir, rambu lalu lintas, dan drainase tepi termasuk dalam kategori risiko sedang. Sedangkan marka, pagar pengaman dan kerusakan permukaan jalan termasuk dalam risiko rendah. Peningkatan keselamatan pada ruas Jalan Kapten Piere Tendean dapat dilakukan dengan penanganan atau perbaikan terhadap permasalahan keselamatan yang telah diidentifikasi di atas. Penanganan sebaiknya diprioritaskan untuk permasalahan dengan risiko tinggi, sedang, dan rendah secara berturut-turut.
Redaksi Vol. 7 No. 1 Sandjaya, Arif
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kata Pengantar Vol. 7 No. 1 Sandjaya, Arif
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Daftar Isi Vol. 7 No. 1 Sandjaya, Arif
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar