cover
Contact Name
Adhi Surya
Contact Email
J.Kacapuri@gmail.com
Phone
+6287782738533
Journal Mail Official
J.Kacapuri@gmail.com
Editorial Address
UPT Publikasi dan Pengelolaan Jurnal Universitas Islam kalimantan MAB Gd A lt 2, Jalan adhiyaksa No 2 Kayu Tangi Banjarmasin Kalsel-70123
Location
Kota banjarmasin,
Kalimantan selatan
INDONESIA
Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil
ISSN : 25023179     EISSN : 26566001     DOI : 10.31602
JURNAL KACAPURI terbit 2 (dua) kali setahun pada bulan Juni dan Desember. Diterbitkan oleh Program Studi (S-1) Teknik Sipil Universitas Islam Kalimantan Muhammad Arsyad Al Banjari. Redaksi menerima sumbangan artikel ilmiah dari para peneliti, pendidikan dan pemerhati masalah-masalah atau scope and focu
Articles 258 Documents
PORTAL BAJA OPEN FRAME SEBAGAI METODE PENANGANAN DELEKSI PIPA RAW WATER SUNGAI WAIN AREA BANGUNAN BENDALI REFINERY UNIT V BALIKPAPAN agus sugianto
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 1 (2019): JUNI JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2011.896 KB) | DOI: 10.31602/jk.v2i1.2059

Abstract

Pada saat penggalian proyek Bendali berdampak pada terbukanya posisi pipa dan terjadi defleksi pada 2 unit pipa RAW sungai Wain yang berfungsi mengalirkan air dari Sungai Wain ke unit Refinery Pertamina RU V dimana suplai air tersebut tidak diperbolehkan untuk terhenti atau terganggu.Penanganan defleksi pada pipa RAW sungai Wain dilakukaan dengan tujuan agar tegangan (stress) yang terjadi pada pipa menjadi berkurang sehingga resiko terhadap kegagalan material pipa dapat dikurangi, menggunakan peralatan mekanis serta struktur bantu berupa open frame dari baja profil. Pengangkatan menggunakan 4 portal open frame baja profile dengan perbedaan jarak yang tidak terpaut jauh, proses pengangkatan dilakukan bertahap dan bersamaan dengan tetap memperhatikan tinggi pengangkatan sehingga beban pada titik portal dapat diseimbangkan.Hasil analisa defleksi maksimal yang terjadi sebesar 20,76 mm < ∆ Ijin 40 mm. Tegangan yang terjadi sebesar 96,42 Kg/cm². < 1600 Kg/cm². dan Rasio maksimal 0,887 < , dari hasil tersebut diatas maka dapat disimpulkan bahwa Struktur Portal Temporary Support dapat digunakan untuk pengangkatan. During the excavation of the Bendali project, the pipe position was opened and deflection occurred on 2 RAW pipe units in the Wain river which served to drain water from Sungai Wain to Pertamina RU V Refinery unit where the water supply was not allowed to be stopped or interrupted.Dealing with deflection in the RAW pipe of the Wain river on the surface so that the stress that occurs in the pipe is reduced so that the risk of failure of the pipe material can be reduced, using mechanical equipment and an auxiliary structure in the form of open steel profile. Lifting using 4 profile steel open frame portals with different distances that are not far, the lifting process is carried out in stage and simultaneously while taking into account the height of the lift so that the load at the portal point can be balanced.The results of the maximum deflection analysis that occurred were 20.76 mm <∆ 40 mm permit. The stress that occurs is 96.42 Kg / cm². <1600 Kg / cm². and a maximum ratio of 0.887 <, from the results above, it can be concluded that the Temporary Support Portal Structure can be used for lifting. 
ANALISIS BIAYA OPERASIONAL KENDARAAN (BOK) DAN WTP (WILLINGNESS TO PAY) PADA BUS AKAP JURUSAN BANJARMASIN - SAMARINDA bagus nugroho putra; utami sylvia lestari
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 1, No 2 (2018): DESEMBER JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (344.528 KB) | DOI: 10.31602/jk.v1i2.1779

Abstract

Kota Banjarmasin adalah ibu kota provinsi dari Kalimantan Selatan dengan berbagai macam aktivitas. Salah satu angkutan umum Kota Banjarmasin adalah bus AKAP (Antar Kota Antar Provinsi) PO. Pulau Indah Jaya yang melayani transportasi penumpang dengan tujuan kota dan provinsi. Sarana transportasi memiliki tarif biaya yang ditentukan berdasarkan Biaya Operasional Kendaraan (BOK). Tujuan penelitian ini untuk mengetahui besar BOK bus AKAP dengan metode Pacific Consultant International (PCI) dan untuk mengetahui besar tarif yang diinginkan penumpang beserta tanggapan terhadap tarif yang berlaku saat ini Willingness To Pay (WTP).Penelitian ini dilakukan melalui survei wawancara untuk BOK kepada pihak PO. dan sopir bus dengan jumlah data 25 unit bus dan untuk WTP survei wawancara dengan sampel 200 penumpang bus di terminal KM 6 tempat pembelian tiket bus.Besar BOK yang dikeluarkan oleh PO. Pulau Indah Jaya Rp Rp 8.137.912.279 /tahun (bus Non AC) dengan tarif Rp 168.194 /penumpang dan Rp 8.712.239.580 /tahun (bus AC+Toilet) dengan tarif Rp 229.173 /penumpang. Besar nilai WTP bus Non AC Rp 185.000 /penumpang dan AC+Toilet Rp 245.000 /penumpang. Tanggapan terhadap tarif bus AKAP Non AC Rp 175.000 /penumpang dan AC+Toilet Rp 235.000 /penumpang adalah harga tarif bus  sesuai dengan kemampuan penumpang membayar dan mau membayar lebih dengan syarat adanya penambahan pelayanan dan fasilitas.Kata Kunci: Bus AKAP, Biaya Operasional Kendaraan (BOK), Willingness To Pay (WTP)banjarmasin city is the capital of the province of South Borneo with a wide range of activities. One of the public transportation of Banjarmasin city is the bus AKAP (Inter-City Inter Province) PO. Pulau Indah Jaya which serves passenger transportation with a city and provincial destinations. Transportation facilities have a fee that is determined based on Vehicle Operating Costs (VOC). The purpose of this study is to find out the size of the bus AKAP VOC with the Pacific Consultant International (PCI) method and to find out the number of tariffs desired by passengers along with responses to the current rates of Willingness To Pay (WTP).This research was conducted through interview surveys for VOC to PO. parties and bus drivers with data on 25 bus units and for WTP interview surveys with a sample of 200 bus passengers at the terminal KM 6 places to buy bus tickets.VOC amount issued by PO. Pulau Indah Jaya Rp. 8.137.912.279 /year (Non AC buses) with a tariff of Rp 168.194 /passenger and Rp. 8.712.239.580 /year (AC + Toilet bus) at a rate of Rp. 229.173 /passenger. The value of the Non AC WTP bus is Rp. 185.000 /passenger and the AC + Toilet Rp. 245.000 /passenger. The response to the AKAP Non AC bus fare of Rp. 175.000 /passenger and AC + Toilet Rp. 235.000 /passenger is the price of the bus fare according to the ability of the passengers to pay and pay more on the condition of additional services and facilities.Keywords: Bus AKAP, Vehicle Operating Costs (VOC), willingness to pay (WTP) 
PENGELOLAAN DAN PENGOLAHAN SAMPAH PASAR DESA GUDANG TENGAH MELALUI KONSEP 3 R DAN TEKNOLOGI LINGKUNGAN Adhi Surya; Dewi Ariefah Noor
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 2 (2019): DESEMBER JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1374.674 KB) | DOI: 10.31602/jk.v2i2.2675

Abstract

Permasalahan lingkungan hidup yang terjadi di berbagai daerah pada saat ini adalah penurunan daya dukung lingkungan sebagai akibat rendahnya kesadaran masyarakat terhadap pentingnya pengelolaan lingkungan hidup. Hal ini dipicu oleh beberapa faktor, antara lain perubahan fungsi dan tatanan lingkungan, penurunan daya dukung lingkungan dan mutu lingkungan, tidak adanya keterpaduan pengelolaan sumber daya manusia, alam, dan buatan dalam pengelolaan lingkungan hidup antar berbagai pihak, kurang optimalnya pemanfaatan ruang kota, serta pencemaran lingkungan yang dihasilkan oleh adanya sampah. Tujuan suatu sistem pengelolaan sampah ialah mengkonversi sampah menjadi bahan yang berguna secara efisien dan ekonomis dengan dampak lingkungan seminimal mungkin. Untuk melakukan konversi sampah diperlukan adanya informasi tentang karakter sampah, karakter teknis teknologi konversi yang ada, karakter pasar dari produk pengolahan, implikasi lingkungan, persyaratan lingkungan, dan ketersediaan dana. Aktifitas pasar subuh desa gudang tengah dimulai dari jam 00.00 s.d. 08.00 WITA. Untuk aktifitas pasar tidak berhenti kecuali hari libur Agama Islam. Kebanyakan barang yang didagangkan adalah jenis sayur-mayur, buah-buahan dan ikan yang hidup. Terbukti dari sampah yang banyak adalah jenis sayur-mayur dan buah-buahan serta jenis sampah plastik. Pengelolaan Sampah Pasar melalui konsep 3R (Reduce-ReuseRecycle) dan Teknologi lingkungan. Oleh karena itu dipandang perlu untuk melakukan pengelolaan pasar subuh Desa Gudang Tengah Kabupaten Banjar dalam program Pengabdian Kepada Masyarakat (PKM) Universitas Islam Kalimantan Muhammad Arsyad Al Banjari Banjarmasin dengan mitra Desa Gudang Tengah Kabupaten Banjar.
KAJIAN EFEKTIFITAS KUAT TEKAN BETON MUTU TINGGI FC’ 35 MPA DENGAN MENGGUNAKAN AGREGAT LOKAL SPLIT BIRAYANG KABUPATEN HULU SUNGAI TENGAH arif budi haryono; Adhi Surya; Eka Purnamasari
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 1, No 1 (2018): JUNI JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (393.663 KB) | DOI: 10.31602/jk.v1i1.1436

Abstract

Beton merupakan salah satu pilihan sebagai bahan infrastruktur. Beton merupakan campuran dari agregat halus dan agregat kasar (pasir, kerikil, batu pecah atau jenis agregat lain) dengan semen, yang dipersatukan oleh air dalam perbandingan tertentu. Untuk menghasilkan beton yang berkualitas baik dan perlu diperhatikan kuat tekan beton tersebut. Karena semakin besar kuat tekan beton, maka semakin baik juga kualitas beton tersebut. Kuat tekan beton (f’c) menyatakan kekuatan tekan luas bidang permukaan yang disyaratkan (dalam MPa). Tujuan dari penelitian ini adalah mengetahui efisiensi pemakaian batu birayang, mengetahui pengaruh jenis semen dengan penambahan zat aditif terhadap  beton, mengetahui formula korelasi kuat tekan beton dilaboratorium dan dilapangan.Pengujian  ini  dilakukan  di  Laboratorium  Struktur  dan  Bahan  Politeknik  Negeri  BanjarmasinKalimantan Selatan dengan menggunakan metode SNI ( Standar Nasional Indonesia). Pengujian ini terdiri atas pengujian semen, agregat (kasar dan halus) dan beton. Pengujian terhadap semen meliputi: berat jenis semen, kehalusan semen, kosistensi semen dan waktu pengikatan. Untuk pengujian terhadap agregat (kasar dan  halus)  meliputi:  analisa  saringan,  pemeriksaan  berat  jenis,  abrasi  dengan  mesin  los  angeles, pemeriksaan kadar air , kadar  lumpur, berat  isi,  kandungan organik. Untuk pengujian  beton meliputi: pengujian slump test, kadar udara, dan pengujian kuat tekan.Bedasarkan hasil penelitian ini maka dapat  disimpulkan bahwa split  birayang  lebih efisien dan ekonomis 41 % lebih rendah dari harga split palu,  hasil pengujian dilaboratorium dengan menggunakan semen gresik dan tambahan zat aditif sika kuat tekan rata-rata umur 28 hari didapat 38.79 Mpa  dan dari hasil rata-rata nilai kuat tekan dilaboratorium dan dilapangan hasil nya pun mencapai target estimasi Fc’ 35Mpa sehingga memenuhi syarat yang ditentukan.
UJI KEASAMAN AIR DENGAN ALAT SENSOR pH DI STT MIGAS BALIKPAPAN jufriadi karangan; Bambang Sugeng; Sulardi Sulardi
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 1 (2019): JUNI JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (784.422 KB) | DOI: 10.31602/jk.v2i1.2065

Abstract

Tujuan penelitian adalah untuk memberikan gambaran alat uji sensor pH meter SKU SEN0161 untuk pengukuran tingkat keasaman air yang dipergunakan dilingkungan Sekolah Tinggi Teknologi Migas Balikpapan. Metode penelitian yang digunakan adalah metode studi kasus yakni studi kasus kualitas air utilitas dan air domestic. Hasil penelitian menunjukan bahwa pengujian keasaman air dengan alat ukur sensor pH meter SKU SEN0161 dengan kesalahan 1.65% dan tingkat akurasi 98.35% terhadap alat ukur pH standar. Dari hasil penelitian selanjutnya memberikan saran bahwa alat ukur sensor pH dapat digunakan sebagai alternative pengukuran keasaman air disamping pengukuran secara manual dengan kertas lakmus.The purpose of the study was to provide an overview of the pH meter sensor sensor test SKU SEN0161 for measuring the acidity of water used in the Balikpapan Oil and Gas Technology College. The research method used is a case study method that is a case study of the quality of utility water and domestic water. The results showed that testing the acidity of the water with a pH meter sensor measuring instrument SEN0161 with an error of 1.65% and an accuracy rate of 98.35% for a standard pH measuring instrument. From the results of further research, it is suggested that the pH sensor can be used as an alternative measurement of water acidity in addition to manual measurement with litmus paper.
KOMPARASI METODE ANALYTICAL HIERARCHY PROCESS (AHP) DAN SIMPLE ADDITIVE WEIGHTING (SAW) DALAM PENENTUAN SKALA PRIORITAS PROYEK PEKERJAAN (Studi Kasus : CV. EUK Samarinda ) Achmad Jaya Adhi Nugraha
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 1 (2019): JUNI JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (310.299 KB) | DOI: 10.31602/jk.v2i1.2069

Abstract

Semua proyek pekerjaan yang dikeluarkan oleh PT. PLN (Persero) Wilayah Samarinda secara resmi diumumkan melalui e-procurement. Masalah yang muncul adalah bagaimana CV. EUK dapat menentukan tawaran proyek pekerjaan mana yang layak untuk dikerjakan sehingga secara tidak langsung dapat mempengaruhi kenaikan harapan pada Laba Kotor yang akan diterima. Masalah ini juga terkait langsung bagaimana menentukan penjadwalan proyek kerja yang dilakukan pada skala prioritas. Metode AHP diterapkan untuk menentukan Skala Prioritas Kerja yang akan dipilih dengan B / C Analysis sebagai model pengambilan keputusan. Diharapkan penerapan metode ini secara tidak langsung dapat meminimalkan keterlambatan dalam penyelesaian pekerjaan dan meningkatkan harapan penerimaan Laba Kotor. Sebagai pembanding digunakan metode SAW. Hasil penelitian menunjukkan bahwa metode AHP jauh lebih baik daripada metode SAW, dan mampu menunjukkan kelemahan metode pemilihan proyek yang digunakan CV. EUK sejauh ini.All job projects issued by PT. PLN (Persero) Area Samarinda is officially announced through e-procurement. The problem that arises is how the CV. EUK can determine which job project bid is feasible to work so that it can indirectly affect the increase of expectation on Gross Profit to be received. This problem is also directly related to how to determine the scheduling of work projects undertaken on a priority scale. The AHP method is applied to determine the Work Priority Scale to be selected with B / C Analysis as a decision-making model. It is hoped that the implementation of this method can indirectly minimize the delay in the time of completion of the work and increase the expectation on the acceptance of Gross Profit. As a comparison used SAW method. The results showed that AHP method is much better than SAW method, and able to show weakness of project selection method used CV. EUK so far. 
PENERAPAN VALUE ENGINEERING (VE) PADA PEMBANGUNAN GEDUNG KAMPUS II UNIVERSITAS MUHAMMADIYAH PALANGKARAYA hendra cahyadi; Rida Respati; Galibur Rahman
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 1, No 2 (2018): DESEMBER JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (690.058 KB) | DOI: 10.31602/jk.v1i2.1774

Abstract

Menganalisa kembali sebuah perencanaan pembangunan gedung menjadi salah satu pilihan untuk menghemat biaya, namun masih sesuai ketentuan dan standar yang berlaku. Banyak alternatif yang digunakan untuk menghemat biaya-biaya dengan mengurangi atau menghilangkan biaya yang tidak diperlukan. Salah satu alternatif yang dapat digunakan adalah value engineering (rekayasa nilai).  Value  Engineering  (VE)  dapat  didefinisikan  sebagai  sebuah teknik  dalam  manajemen  pendekatan  yang  sistematis  untuk  mencari keseimbangan fungsi terbaik antara biaya, kendala kinerja sebuah proyek serta mengurangi atau menghilangkan biaya yang tidak penting.Pada penelitian ini analisa VE dilakukan berdasarkan item yang dianalisis menggunakan distribusi Paretto, kemudian selanjutnya dilakukan analisa dengan beberapa tahap/ fase yaitu tahap informasi, tahap kreatif, tahap analisa dan tahap rekomendasi. Untuk Rancangan Anggaran Biaya dikelompokan lebih ringkas menjadi beberapa kelompok selanjutnya dilakukan distribus Paretto sehingga diperoleh item yang akan dilakukan Value Engineering yaitu Pekerjaan Struktur, Pekerjaan Dinding, Lantai dan Plafond serta Pekerjaan Saluran dan Ruas Jalan.Rancangan usulan yang diterapkan pada studi ini adalah penggantian item pondasi Konstruksi Sarang Laba-Laba menjadi Bored Pile ditambah dengan pekerjaan yang menyertainya sehingga diperoleh selisih biaya untuk pekerjaan struktur sebesar                 Rp. 435.419.421. Rancangan usulan pekerjaan dinding hanya mengganti  partisi  dinding  dari  Gypsum board 5 mm (kayu  kelas  II)  menjadi Triplek 6  mm sehingga   diperoleh selisih biaya sebesar Rp. 17.034.473. Rancangan  pada  pekerjaan  ruas  jalan  hanya  me-review  untuk  pemanacangan galam per- m2dengan selisih biaya Rp. 1.050.000.000. Berdasarkan perhitungankeseluruhan total biaya hasil yang diperoleh pada studi penerapan valueengineering  ini  relatif  kecil  yaitu  hanya berkisar 7,4% dari  total  kesuluruhanbiaya.Kata kunci: rancangan anggaran biaya, rekayasa nilai, gedungRe-analyzinga building development plan to be anoption to save costs, but still in  accordance with applicable terms  and standards. Many alternatives are used to save costs by  reducing or eliminating unnecessary  costs. One of the alternatives                             that can be used is value engineering (VE). Value Engineering (VE) can be defined as atechnique in the management of a systematic approach to finding the best balance of functions between cost, performance constraints of  a  project  and reducing  or eliminating unnecessary costs.In this research VE analysis is done based on the items analyzed using Paretto distribution, then next done by analysis with some phase/phase that is stage information, creative  phase, analysis phase  and recommendation phase. For the Budget Plan, it will bedivided into several groups, then distributed by Paretto so that the items will be done Value Engineering is Structural Work,Wall Work, Floor and Ceilingas wellas Channel and Road Works.The proposed draft applied in this study is there placement of the foundation of the Sarang Laba-Laba Construction to Bored Pile plus the accompanying work so that the cost difference for the structural work is Rp. 435,419,421. The proposed wall work only replaces the wall partition of Gypsumboard 5 mm (class II wood) into Triplek 6 mm so that the cost difference of Rp.17.034.473. The design on the road works is only reviewed for perforation of the 2nd marine with a cost difference of Rp.1.050.000.000. Based on th ecalculation entire of the cost of the results obtained in the study of the application of value engineering is relatively small that is only about 7.4% entire of cost.Keywords: budget draft, value engineering and building
ANALISIS KEBUTUHAN RUANG PARKIR KENDARAAN RODA DUA DI KAMPUS UNISKA MAB BANJARMASIN Adhi Surya
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 2 (2019): DESEMBER JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1158.577 KB) | DOI: 10.31602/jk.v2i2.2676

Abstract

Banjarmasin sebagai salah satu kota dengan kepadatan penduduk yang cukup tinggi menyebabkan peningkatan dalam aspek trasportasi dengan setiap harinya kemacetan yang sering terjadi menandakan bahwa pemakaian kendaraan di kota banjarmasin meningkat dengan cepat, dengan meningkatnya volume lalu lintas kendaraan maka dibutuhkan suatu ruang parkir untuk kendaraan. Universitas Islam Kalimantan Muhammad Arsyad Al Banjari (UNISKA MAB) Banjarmasin adalah salah satu tujuan daripada mahasiswa dari berbagai daerah, mulai dari kota Banjarmasin sendiri sampai dari luar kota, dengan demikian setiap mahasiswa, dosen dan karyawan menggunakan transportasi sendiri-sendiri, mulai dengan transportasi umum sampai kendaraan pribadi. Kendala dari salah satu transportasi tersebut adalah kendaraa pribadi, dimana UNISKA harus menyediakan ruang parkir untuk kendaraan mahasiswa, dosen dan karyawan. Semakin bertambahnya pengguna kendaraan pribadi maka semakin banyaknya ruang yang harus disediakan untuk kebutuhan parkir. Sebelum adanya kebijakan pemerintah Kota Banjarmasin dalam hal ini Dinas Perhubungan melakukan larangan parkir dibahu jalan sepanjang Jalan Adhyaksa mengakibatkan semakin berkurangnya lahan parkir yang ada untuk mahasiswa, dosen dan karyawan. Dari pihak kampus setelah disediakan lahan untuk parkir, kini mahasiswa dan dosen dapat parkir di tempat tersebut. Tetapi pada kenyataannya lahan parkir itu masih tidak mampu menampung kendaraan roda dua mahasiswa, dosen dan karyawan untuk itu penelitian ini bertujuan untuk menganalisis kebutuhan ruang parkir kendaraan roda dua di kampus UNISKA MAB Banjarmasin.
ANALISA PEMBEBANAN STRUKTUR ATAS JEMBATAN BETON PRATEGANG PADA JEMBATAN SULAWESI II DI BANJARMASIN MENGGUNAKAN SNI 1725:2016 rohayah rohayah; Abdurrahman Abdurrahman; Eka Purnamasari
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 1, No 1 (2018): JUNI JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (220.947 KB) | DOI: 10.31602/jk.v1i1.1437

Abstract

Jembatan Sulawesi I sudah saatnya untuk ditingkatkan dari segi kapasitas yang ada dan konstruksijembatan yang masih menggunakan kayu. Karenanya dibangun jembatan baru di sisi timur dari yang sudah ada dan disebut jembatan Sulawesi II dengan panjang 63,5 m. pada saat di rencanakan dan dibangun jembatan ini di tahun 2016 masih menggunakan peraturan pembebanan jembatan RSNI 2005, seiring dengan waktu, standart tersebut perlu diperbarui sesuai dengan kondisi terkini menggunakan SNI 1725:2016.Perhitungan analisa struktur jembatan Sulawesi II menggunakan program SAP 2000 V19. Sedangkan, perhitungan penulangan pelat lantai prategang pada Jembatan Sulawesi II ini menggunakan metode Bittner.Berdasarkan hasil analisa struktur menggunakan program SAP 2000 yaitu momen akibat beban sendiri adalah 6421.140 kg.m, momen akibat beban mati adalah  11713.134 kg.m, momen akibat beban  hidup  adalah  58640.708  kg.m sedangkan analisis  perhitungan penulangan pelat  lantai menggunakan  metode  Bittner  didapatkan  desain  yang  lebih  rapat  jarak  penulangannya  dandiameter tulangan yang lebih besar yaitu arah memanjang jembatan menggunakan diameter 16 ∅ –100 mm dan arah melintang jembatan diambil diameter 16 ∅ –150 mm. Hasil analis perhitunganbeton prategang didapat  gaya prategang awal (F0)  diperoleh sebesar 77398.224 kg .  Desainprategang menggunakan kabel sistem VSL dengan ASTM A-416 Grade 270 dan diperoleh tipe angkur E5-31 dan Ɵ selongsong 12.540 mm. Dari hasil perhitungan didapatkan jumlah tendon sebanyak 5 buah dengan jumlah strand tiap tendon sebanyak 31strand.
PENGARUH BEBAN LALU LINTAS TERHADAP KERUSAKAN PERKERASAN JALAN (STUDI KASUS SEGMEN JALAN BANJARBARU – BATI-BATI Jihan Alya Nabillah; Iphan F Radam
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 2, No 2 (2019): DESEMBER JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (672.503 KB) | DOI: 10.31602/jk.v2i2.2669

Abstract

Page 2 of 26 | Total Record : 258