cover
Contact Name
Andi Muhammad Ikhsan
Contact Email
andimuhammad.ikhsan@umi.ac.id
Phone
+6281342502866
Journal Mail Official
losari.arsitekturjurnal@umi.ac.id
Editorial Address
Jl. Urip Sumohardjo Km.5 Kampus Universitas Muslim Indonesia Fakultas Teknik Program Studi Arsitektur
Location
Kota makassar,
Sulawesi selatan
INDONESIA
Losari : Jurnal Arsitektur, Kota dan Pemukiman
ISSN : 25024892     EISSN : 25278886     DOI : https://doi.org/10.33096/losari.v6i1
Core Subject : Engineering,
LOSARI Jurnal Arsitektur Kota dan Pemukiman adalah jurnal yang terbit 2 kali setiap tahun pada bulan Februari dan Agustus.  LOSARI Jurnal Arsitektur Kota dan Pemukiman adalah  peer reviewed jurnal yang memuat artikel-artikel ilmiah mengenai arsitektur dan Rancang  Kawasan  Binaan pada lingkup ilmu arsitektur, lansekap, interior, perencanaan wilayah kota dan kawasan. 
Articles 161 Documents
Studi Pengembangan Perparkiran di Kota Baubau Lukman, Muhammad Yusri; Andi, Muhammad Ikhsan; Zaki, Muhammad
LOSARI : Jurnal Arsitektur Kota dan Pemukiman Vol. 2, No. 1, Februari 2017
Publisher : Universitas Muslim Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The increase in development in every city, especially business centers, has not been able to provide sufficient parking space, so that thesurrounding road bodies are used for parking lots. If the road body is passed by a large enough amount of traffic, it can be ensured that parking onthe road body will cause traffic problems (speed decreases and travel time increases. The emergence of parking problems in big cities invites thepublic and experts to think and really understand the parking system. The concept and characteristics of parking, analysis of parking needs,geometric planning of parking lots, and parking policies are one of the ideas that can be implemented to deal with parking problems, especially inBaubau City. This study aims to examine the feasibility of the best, optimal parking location and have good prospects for the development of theBaubau City area, Examine the socio-cultural feasibility of the community in relation to the plan Determination of parking locations, both microscale (socio-cultural feasibility in selected locations) and macro scale (socio-cultural feasibility associated with Baubau City as a whole), Assessenvironmental feasibility at parking location points so that it does not environmental degradation occurs due to parking location planning,Examining economic aspects and taking into account the level of income at the time of operation of the parking system, estimating the investmentcost needed for the construction of the parking area and estimating the return on investment with rational and realistic assumptions. The datacollection method is carried out in two ways, namely secondary surveys and primary surveys.