cover
Contact Name
Rofi Budi Hamduwibawa
Contact Email
rofi.hamduwibawa@unmuhjember.ac.id
Phone
+628124990200
Journal Mail Official
hexagon@unmuhjember.ac.id
Editorial Address
Program Studi Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Jember Alamat: Jl. Karimata No. 49 Jember-Jawa Timur-Indonesia 68124 Phone & Fax: (0331)336728 | 337957 Email: hexagon@unmuhjember.ac.id
Location
Kab. jember,
Jawa timur
INDONESIA
Jurnal Rekayasa Infrastruktur Hexagon
ISSN : 25282379     EISSN : 25408135     DOI : https://dx.doi.org/10.32528/hgn
Core Subject : Engineering,
Jurnal Rekayasa Infrastruktur Hexagon dikelola oleh Program Studi Teknik Sipil Fakultas Teknik dan di terbitkan oleh Universitas Muhammadiyah Jember secara berkala dua kali dalam setahun pada bulan Juni dan Desember. Journal Infrastruktur Hexagon memfokuskan pada bidang ketekniksipilan berisi artikel-artikel tentang perencanaan, perancangan dan evaluasi pada bangunan dan objek teknik sipil
Articles 130 Documents
EVALUASI PERCEPATAN PEMBANGUNAN PROYEK RUSUNAWA ASN PEMKAB MALANG MENGGUNAKAN METODE CRASHING DENGAN SISTEM SIHFT KERJA Ninda Rizki Apriliana; Amri Gunasti; Totok Dwi Kuryanto
HEXAGON Vol 5, No 1 (2020): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v5i1.3584

Abstract

In construction projects there are three things that must be considered, namely time, cost and quality. However, reality shows that there is still often a delay time of implementation. One way to overcome delay in construction projects is to do with the crashing. This research was conducted on the project of the construction of the building Rusunawa ASN Malang Regency. The method of crashing used by wayof a work shift. The calculation of the needs of the work shift using the guidelines for the calculation of Unit Price Analysis of Workers (AHSP) in 2018. The results showed that the project can be accelerated for 24 working days, so the duration of the project which was originally 197 working days to 173 days of work. Direct costs the project has increased from Rp.12.763.192.497.58 in 197 days to Rp. 12.937.000.000.00 in 173 days (up 1,3554%).
KAJIAN SEDIMENTASI DI SUNGAI SAMPEAN BONDOWOSO MENGGUNAKAN PROGRAM HEC-RAS VERSI 4.1 Khafid Iswahyudi; Noor Salim; Taufan Abadi
HEXAGON Vol 3, No 2 (2018): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v3i2.2916

Abstract

Sedimentasi sungai yaitu proses pengendapan suatu material – material yang terangkut aliran air sungai dan dapat mengakibatkan terjadinya delta sungai, sedangkan sedimen merupakan batuan yang terbentuk karena proses pelapukan, erosi, transportasi, dan deposisi (pengerasan) yang terjadi pada suatu wilayah aliran sungai. Delta sungai yang terjadi karena proses sedimentasi tersebut dapat mengurangi jumlah debit air yang terbawa, sehingga kebutuhan irigasi di daerah hilir tidak bisa terpenuhi secara maksimal karena terhalang oleh penumpukan delta. Karakteristik sedimentasi di hilir terjadi perlahan dan berlangsung menerus selama suplai muatan sedimen yang tinggi terus berlangsung. Prediksi sedimentasi yang terjadi pada sungai dilakukan dengan memperhitungkan besar laju sedimentasi berdasarkan metode perhitungan analitik, namun untuk mempermudah dalam menggambarkan sedimentasi yang terjadi pada sungai  sampean  Bondowoso  dilakukan  metode  pemodelan  menggunakan  progam  aplikasi HEC-RAS. Progam HEC-RAS sendiri merupakan salah satu progam pemodelan analisis angkutan sedimen pada saluran maupun sungai.
EVALUASI KEBUTUHAN LAHAN PARKIR OFF STREET PARKING DI PASAR TANJUNG JEMBER Arik Sebastian; Totok Dwi Kurniawan; Irawati Irawati
HEXAGON Vol 3, No 1 (2018): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v3i1.2907

Abstract

Pasar  tanjung  merupakan  pasar  rakyat  terbesar  dijember  dengan  luas  ±24.970  m2,yang berlokasi  disebelah  selatan    Jl.trunojoyo,  sebelah  utara  Jl.untung  suropati,  sebelah  timurJl.dokter  wahidin  dan  sebelah  barat  Jl.  Samanhudi.  Dari  tahun  ketahun  animo  pedagang maupunkonsumensemakinmeningkatjumlahnya.sehinggakebutuhanfasilitasparkirdidalampasarsemakinmeningkat.Studiinibertujuanuntukmerencanakanareaoffstreetparkinguntuk kendaraan  roda2dengan  menganalisakarakteristik  parkiryang  adadi3lokasi  offstreetparking   yaitudisisijalandokterwahidin(lokasi1),disisijalansamanhudi(lokasi2),disisi jalanuntungsuropati(lokasi3).Parameteryangdicariyaitu:volumeparkir,durasiparkir,akumulasiparkir,turnover,indeks parkir,luas lahanyangakandirencanakan.Surveidilakukan dalam24jamselama7haridalamsatubulandenganpengumpulandataprimerdansekunder.Hasilanalisismenunjukkanvolumetertinggiberadadilokasi1yaitu1369kendaraan.Durasi kendaraanparkirtertinggiberkisar60-120menit.Akumulasitertinggiberadadilokasi2yaitu250kendaraan.Turnovertertinggiyaituberadadilokasi3yaitu9,545kali.Indeksparkir tertinggi  berada  dilokasi  2  yaitu  91%.  Berdasarkan  perhitungan  dari  karakteristik  parkir,kebutuhanparkirberjumlah 1323kendaraan roda 2.Lahanparkiryangdirencanakan  beradadi lantai3gedungpasartanjung,memilikiluas6050m2  danmemilikikapasitasparkir2240 kendaraanroda2. 
USULAN PENYEDERHANAAN DESAIN TULANGAN DAN ANALISIS KOLOM BETON BERTULANG PADA PENAMPANG KONDISI KEGAGALAN TARIK DISAAT TULANGAN TEKAN TELAH LELEH SESUAI SNI 2847:2013 Pujo Priyono
HEXAGON Vol 5, No 2 (2020): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v5i2.3934

Abstract

Semenjak terbitnya SNI 2847:2013, syarat batasan tulangan maksimum sudah bukan suatu hal yang konstan lagi, melainkan tergantung pada jenis mutu baja tulangan yang digunakan dalam desain , karena nilai regangan baja tulangan tarik  pada kondisi kuat lentur nominal harus lebih besar atau sama dengan 0,005.Di SNI 2847:2013 ,nilai faktor reduksi   ditentukan berdasarkan nilai regangan tarik pada serat terluar yang terjadi ,(Net Tensiile Strain,NTS). Yang bisa dijelaskan bahwa nilai  dibedakan atas saat penampang terkendali tekan, terkendali tarik dan daerah transisi. Bila  maka penampang dikatakan terkendali tekan dan nilai , saat  maka penampang dalam keadaan transisi dan nilai Ø=0,65+(εt- ), serta saat  penampang dikatakan terkendali tarik maka nilai dengan 0,005.Penampang kegagalan tarik memiliki tingkat daktilitas yang baik ,untuk penampang kolom terjadi saat nilai eksentrisitas gaya aksial tekan, e, lebih besar dari nilai eksentrisitas gaya aksial tekan kondisi setimbang,eb. Langkah analisisnya yang rasional adalah melakukan cara coba-coba dan menyesuaikan, yang merupakan tahapan yang melelahkan.Tujuan studi ini, adalah memandu desain luas tulangan lentur dan aksial tekan yang berada pada kategori kegagalan tarik  saat tulangan tekan telah leleh sesuai yang disyaratkan oleh SNI 2847:2013 dengan langkah yang sederhana,  penulangan  dua sisi.Metode studi  ini pada dasarnya mengolah kembali rumus-rumus dasar  teori kekuatan penampang  kolom beton bertulang yang telah diturunkan oleh beberapa penulis sebelumnya serta SNI 2847:2013 agar mendapatkan sebuah perumusan lain yang dapat digunakan secara umum dengan tujuan bisa dibuat  grafik yang dapat digunakan sebagai alat bantu untuk mempermudah dan menyederhanakan desain luas tulangan lenturnya.                 Studi telah menghasilkan suatu perumusan umum dan grafik yang bisa digunakan untuk segala jenis mutu baja dan  mutu beton yang lebih kecil atau sama dengan 28 MPa.
PENINJAUAN PENGARUH BEBAN GEMPA TERHADAP STRUKTUR ATAS YANG BERINTERAKSI DENGAN TANAH DENGAN JENIS PONDASI SETEMPAT sinta Dewi Fajarelia; Pujo Priyono; Arief Alihudien
HEXAGON Vol 2, No 2 (2017)
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v2i2.1430

Abstract

Indonesia's geological condition has earthquake potential that covers most of its territory. To reduce the risk of disaster, it needs earthquake resistant building construction. Generally in existing calculations, the calculation of earthquake loading that is assigned to the ETABS program or SAP 2000 is the result of manual data input and placed at the center of each floor by assuming the upper and lower structure (foundation) are separate. In fact, the structure and the ground (foundation) become a unity.The study was conducted by analyzing the magnitude of the reaction due to conventional analysis to be equivalent to spring by taking into account the amount of the support settlement.The results of the study showed that the momentary support of the exterior beam interaction analysis (spring) decreased for all floors. While in the field moment the beam of interaction analysis (spring) increased, and at the moment of the pedestal beam interior interaction analysis (spring) increased. Keywords : Consolidation, Impact of earthquake loads on soil, immediate settlement.
EVALUASI KAPASITAS STRUKTUR GEDUNG MEOTEL BY DAFAM JEMBER DENGAN METODE PUSHOVER ANALYSIS Ajeng Safira Kusuma Wardhani; Pujo Priyono; Adhitiya Surya Manggala
HEXAGON Vol 4, No 2 (2019): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v4i2.3563

Abstract

The territory of Indonesia, including areas prone to disasters, especially geological natural disasters, is caused by Indonesia's position located at the confluence of 3 (three) world tectonic plates. One of the geological natural disasters that often occurs in Indonesia is an earthquake. The Meotel by Dafam Jember building deserves to be analyzed by the pushover analysis method because it is a multi-storey building that is 10 floors so it must have earthquakeresistance as tectonic activity increases in Indonesia. The study was conducted with the help of SAP2000 v.20 software. Through the ATC-40 curve, the target value of the displacement target and the base shear force in the X direction at the control point of the performance point in the modelling are displacements of 0.075 m and the base shear of 7338.716 kN. The value of the roof drift ratio X direction of 0.1928% is included in the Immediate Occupancy category. The results of the pushover analysis on the structure of Meotel by Dafam Jember show the performance of the building at the level of Immediate Occupancy (IO).
PERENCANAAN STRUKTUR ATAS JEMBATAN JALAN RAYA DENGAN KONTRUKSI LENGKUNG DI SUNGAI DISANAH DESA MARPARAN KECAMATAN SRESEH KABUPATEN SAMPANG Moh Qosim; Pujo Priyono; Ilanka Cahya Dewi
HEXAGON Vol 1, No 1 (2016): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v1i1.197

Abstract

Perencanaan jembatan ini menggunakan kontruksi beton bertulang dengan tipe Deck Arch yang mengacu pada RSNI T-02-2005 (peraturan pembebanan untuk jembatan) dan RSNI T-12-2004 (perencanaan struktur beton untuk jembatan). Jembatan yang direncanakan memiliki panjang bentang total sepanjang 160 meter yang terletak pada wilayah gempa zona 2. Permasalahan yang diambil adalah perencanaan elemen-elemen struktur atas. Analisis struktur menggunakan program komputer SAP 2000 V.14. Struktur dimodelkan sebagai open frame tiga dimensi. Perancangan struktur struktur jembatan tersebut meliputi perencanaan pelat, balok memanjang, balok melintang, balok kantilever, tiang railing, kolom, dan balok pelengkung. Perencanaanya meliputi tulangan lentur, geser, torsi dan hubungan balok kolom. Sedang beban yang dianalisis meliputi beban tetap, beban lalulintas, beban gaya rem, beban untuk pejalan kaki, beban pengaruh temperatur, beban angin, dan beban akibat gempa. Dari hasil perancangan, dihasilkan berbagai variasi dimensi dan penulangan untuk masing-masing elemen struktur yang dalam analisis telah memenuhi syarat kekuatan dan keamanan struktur. Untuk pelat lantai kendaraan digunakan pelat dengan tebal 220 mm. Pada balok memanjang di gunakan dimensi 1000 mm x 1200 mm sedangkan balok melintang digunakan dua tipe balok dengan dimensi dan penulangan yang berbeda-beda. Untuk kolom terdiri dari tiga buah tipe dengan dimensi 1000 mm x 1000 mm (K1), 1000 mm x 1500 mm (K2), dan 1000 mm x 2000 mm (K3). Elemen balok pelengkung berdimensi 1000 mm x 1300 mm. Untuk balok kantilever berdimensi 400 mm x 300 mm. Kata Kunci: Jembatan, balok pelengkung, deck arch, beban jembatan.
PERENCANAAN TEBAL PERKERASAN JALAN DAN RAB JALAN RAYA GLENMORE KABUPATEN BANYUWANGI ( Perbandingan Metode Bina Marga tahun 1987 dan 2013 ) Ahmad Basit Bustomi; Irawati Irawati; Taufan Abadi
HEXAGON Vol 4, No 1 (2019): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v4i1.3481

Abstract

Tol lenmore Kabupaten Banyuwangi merupakan jalan raya yang berbatasan dengan Tol Kalibaru dan Tol Genteng Kabupaten Banyuwangi. Seperti diketahui, Tol Glenmore Kabupaten Banyuwangi merupakan perempatan timur berbagai destinasi. Misalnya kendaraan berat (angkutan) dari pulau Jawa menuju pulau Bali atau sebaliknya yang akan melewati jalan raya Glenmore kabupaten Banyuwangi khususnya pada KM 250 - KM.252 ini. Kendaraan berat yang melewati jalan raya Glenmore di kabupaten Banyuwangi memiliki tujuan berbeda. Kendaraan berat yang melewati jalan raya Glenmore di kabupaten Banyuwangi memiliki tujuan berbeda. Misalnya truk trailer atau semi trailer yang mengangkut barang komoditas atau barang lainnya. Lokasi penelitian ini adalah lokasi strategis yang dekat atau mengarah ke gudang distributor yang berlokasi di Glenmore, Kabupaten Banyuwangi. Dengan kondisi tersebut maka perlu dilakukan evaluasi terhadap ketebalan perkerasan pada jalan tersebut. Dengan adanya evaluasi perhitungan ketebalan perkerasan dan perhitungan rencana anggaran, nantinya akan memberikan alternatif baru atau memberikan kontribusi pemikiran teknis dalam penentuan ketebalan lapisan perkerasan dan perhitungan rencana anggarannya.
Pemodelan Plaxis Dengan FEM Terhadap Perilaku Tahanan Vertikal Grup Pile 2x2 Pada Tanah Pasir Loose Dan Medium Arief Alihudien; Adhitya Surya Manggala
HEXAGON Vol 7, No 1 (2022): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v7i1.7677

Abstract

Dalam merancang pondasi harus memenuhi standar daya dukungnya yang cukup. Untuk mendapatkan kappasitas yang nyata terhadap tanah yang ada di wilayah tersebut haruslah dilakukan test yang sesuai dengan karakteristik pasir yang ada. Dalam penelitian ini akan diteliti pengaruh kepadatan Tanah Pasir Loose sampai dengan medium wilayah Jalan lintas Selatan Jember  terhadap tahanan vertikal tiang pancang . Adapun metodelogi yang digunakan adalah pemodelan menggunakan aplikasi plaxis dengan finite element method (FEM). Berdasarkan hasil pengujian tanah pasir pada wilayah Kawasan Jalan Lintas Selatan Jember memiliki potensi likuifaksi dilihat dari kriteria tanah yang secara keseluruhan memenuhi syarat terjadinya likuifaksi. Dari grafik hubungan tegangan ijin dengan kepadatan relatif, perbengaruh terhadap tahanan vertikal pondasi grup, hal ini dibuktikan bahwa semakin tinggi kepadatan relative tanah maka semakin tinggi tegangan ijin yang terjadi. Perlu dilakukan perkuatan pada tanah untuk menghindari kehilangan kekuatan dan kakuan akibat adanya tegangan.
Pemanfaatan Ex-Bantaran Rel Kereta Api Dan Jembatan Layang Untuk Sarana Publik Yang Kreatif Zulkifli Siregar; Andri Andri
HEXAGON Vol 7, No 1 (2022): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v7i1.8076

Abstract

This research study was conducted in the underpass of the flyover in the corridor of Jalan Ampera Medan. The purpose and objective is to provide a scientific concept related to the arrangement of the space under the flyover which is not currently well managed and tends to cause vandalism in the space. just linearly below it. Utilization of the structural elements of the flyover and its environment can provide attractiveness and be used as a medium of information to convey moral messages through creativity and well-managed works. Thus the space under the flyover which was initially unproductive will turn into an interest point for the surrounding environment. Furthermore, space and area that have been well-organized will certainly give birth to an economic revival through the support of a well-planned and correct management system. The initial material needed for this research is the condition of the existing linear space under the flyover of the Ampera Medan road corridor. Observations to the research location were carried out to determine and map the conditions of land use, the shape of the flyover construction structure that will be used as a point of interest and the potentials of the surrounding environment that can be used as support for creative and innovative public space planning. Primary materials taken from the field will be described into a CAD application so that they become site plan products and base materials. Furthermore, the site plan is also used in the analysis process and relates it to other secondary materials.

Page 12 of 13 | Total Record : 130