Dimensi Utama Teknik Sipil
ISSN : -     EISSN : 26563312     DOI : https://doi.org/10.9744/duts
Core Subject : Engineering,
Jurnal Dimensi Utama Teknik Sipil (DUTS) promotes the widest possible dissemination of civil engineering knowledge by encouraging researchers to conduct research, build new or extend existing theoretical foundations, and contribute to practice at the corporate and national level. We aim to improve the dissemination quality in civil engineering field. The DUTS Journal welcomes technical/review/research papers, which publishes articles under the following fields: Construction Project Management, Construction Materials, Structural Engineering, and Geotechnical Engineering
Articles 171 Documents
STRATEGI RESILIENSI ADAPTIF MAL DI SURABAYA UNTUK MEMPERTAHANKAN JUMLAH PENGUNJUNG SELAMA MASA NEW NORMAL Dicky Hendranata Soelatiep; Timoticin Kwanda; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.116-135

Abstract

Pusat perbelanjaan (mal) dan sektor ritel merupakan faktor penting untuk menyokong pertumbuhan ekonomi dan kehidupan sosial perkotaan. Namun karena pandemi COVID-19, pemerintah harus menerapkan berbagai kebijakan yang membatasi aktivitas di tempat umum. Berbagai kebijakan tersebut menghambat aktivitas perkotaan yang memicu bencana krisis ekonomi dan sosial bagi mal di area perkotaan tersebut. Sehingga mal harus memiliki strategi untuk mempertahankan jumlah pengunjung selama masa New Normal. Oleh sebab itu penelitian ini bertujuan untuk menganalisa faktor faktor yang membentuk strategi resiliensi adaptif mal selama masa New Normal. Faktor yang dianalisa yaitu suasana internal mal, campuran tenan mal, komunikasi & aktivitas promosi mal, fasilitas & pelayanan mal. Penelitian ini dilakukan di kota Surabaya saja, penelitian dilakukan melalui sudut pandang pengunjung dan sudut pandang manajer mal. Data pengunjung dikumpulkan secara kuantitatif melalui survei dan data manajer dikumpulkan secara kualitatif melalui wawnacara semi terstruktur. Kemudian data kuantitatif dan kualitatif diolah dengan metode campuran (Mix Method Research).
ANALISIS NON-LINEAR STRUKTUR TENSEGRITY MENGGUNAKAN TOTAL POTENTIAL ENERGY OPTIMIZATION WITH METAHEURISTIC METHODS (TPO/MA) Denalyn Tanist Istianto; Wong Foek Tjong; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.97-115

Abstract

Total potential energy optimization with metaheuristic methods (TPO/MA) adalah metode analisis struktur yang berdasarkan pada prinsip energi minimum. Metode ini dapat melakukan analisis non-linear pada berbagai struktur tanpa modifikasi yang signifikan dalam prosesnya. Salah satu struktur yang bersifat sangat non-linear adalah struktur tensegrity. TPO/MA dengan tiga algoritma metaheuristik yaitu teaching–learning-based optimization (TLBO), harmony search (HS), dan symbiotic organisms search (SOS) diaplikasikan dalam analisis non-linear geometri pada struktur tensegrity dua dan tiga dimensi. Analisis struktur dilakukan dengan pemberian beban bertahap (incremental) untuk menghasilkan grafik load-displacement yang menunjukkan perilaku non-linear struktur. Hasil penelitian menunjukkan TPO/MA dapat melakukan analisis non-linear pada struktur tensegrity dengan akurasi dan konsistensi yang tinggi. TLBO dan SOS memiliki performa yang lebih baik dibandingkan HS dalam menyelesaikan analisis non-linear pada struktur tensegrity menggunakan TPO/MA.
IDENTIFIKASI DAN ELIMINASI PEMBOROSAN DENGAN MENGGUNAKAN KOMBINASI METODE VALUE STREAM MAPPING (VSM) DAN COST TIME PROFILE (CTP): STUDI KASUS DI PT SABE INDONESIA Jonatan Kurnia; I Gede Agus Widyadana
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.168-183

Abstract

Tantangan yang dihadapi perusahaan di industri manufaktur saat ini adalah efektivitas biaya, lead time yang singkat, dan kualitas produk yang baik. Penelitian ini dilakukan di perusahaan manufaktur atap metal yang memiliki banyak variasi bahan baku dan barang jadi. Perusahaan ini memproduksi atap metal sesuai pesanan dan kebutuhan pelanggan (job order). Penggunaan Metode Value Stream Mapping (VSM) dimulai dengan mengidentifikasi Value Stream, kemudian dilanjutkan dengan pembuatan Current State VSM, identifikasi pemborosan, penentuan kuadran pemborosan, penentuan alternatif perbaikan, dan diakhiri dengan pembuatan Future State VSM. Fokus VSM lebih ke segi waktu. Setelah itu, metode Cost Time Profile (CTP) digunakan untuk menganalisa dari segi biaya terhadap Current State VSM dan Future State VSM tersebut. Kesimpulan yang didapat dari penelitian ini adalah adanya potensi perbaikan yang dapat dicapai yaitu waktu proses bisa lebih cepat 83.78% dan Direct Cost bisa berkurang sebesar 38.72%.
Faktor-Faktor yang Mempengaruhi Kualitas Konstruksi Rumah Menengah dan Mewah di Surabaya Ambrosius Mintardjo; Timoticin Kwanda; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol. 6 No. 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.1.17-24

Abstract

The quality factor is considered when people will buy a house. People are willing to pay more for good quality house, as it will have high value to resell. Hence, it is important to realize quality factor in construction. The respondent answered how was the house construction quality in Surabaya and factors affecting it. The result of this research found 8 expected factors that affects the middle and high-end landed house construction quality in Surabaya. These factors were budget allocation for quality management and occupational health and safety, comprehensive review to the architecture and structure design, supplier management, process management, human resource management, written working standard, customer satisfaction oriented, and proper construction specification and drawing. Out of 8 factor, there was only 1 factor that affects the most, it was proper construction specification and drawing. This research also found there was a difference in factors affecting middle & high-end landed house construction quality in Surabaya.
ANALISA QUANTITY TAKE-OFF DENGAN MENGGUNAKAN AUTODESK REVIT Danny Laorent; Paulus Nugraha; Januar Budiman
Dimensi Utama Teknik Sipil Vol. 6 No. 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.1.1-8

Abstract

Quantity Take-Off merupakan salah satu upaya dari kontraktor dengan melakukan perhitungan volume, yang nantinya akan digunakan sebagai bahan untuk menyusun BQ dalam tender dan nantinya juga dijadikan bahan untuk melakukan procurement. Oleh sebab kontraktor yang dapat melakukan quantity take-off dengan akurat akan mendapatkan beberapa keuntungan seperti pengefisiensian material yang datang karena sesuai dengan aktual. Autodesk Revit merupakan sebuah tools atau aplikasi yang berbasis Building Information Modeling (BIM) yang mampu melakukan quantity take-off. Dalam penelitian ini akan dibahas bagaimana kelebihan dan kelemahan dari Autodek Revit dalam melakukan quantity take-off pada volume beton, bila dibandingkan dengan metode yang selama ini dipakai, yaitu menghitung volume dengan menggunakan gambar dari Autocad dan dengan bantuan Microsoft Excel. Hasil dari penelitian ini menunjukkan bahwa Autodesk Revit dapat melakukan quantity take-off dengan baik dan memiliki beberapa kelebihan seperti, memiliki efisiensi terhadap waktu karena dapat menghitung volume dengan lebih cepat dibandingkan dengan metode sebelumnya, apalagi bila terdapat perubahan desain. Akan tetapi dalam membuat permodelan pada Revit membutuhkan waktu yang cukup lama dan harus teliti agar memperoleh hasil yang akurat. Quantity Take-Off is one of the efforts of contractors to make calculations volume, which will be used as the object for making Bill of Quantity in the tender and will also be made to make procurement. Therefore contractors who can do quantity take-off accurately will get some advantages such as efficiency material that came as it was in accordance with the actual. Autodesk Revit is a tools or application based on Building Information Modeling (BIM) which is capable of performing quantity take-off. In this research will be discussed how advantages and deficiency of Autodek Revit in quantity take-off to calculate concrete volume, when compared with the method that have been used, it is calculating volume using image from Autocad and help with Microsoft Excel. Result of this research showed that Autodesk Revit can do quantity take-off with good and has a number of advantages such as, have efficiency to the time because they can calculate volume with more rapidly than method before, especially if there is a redesign. But in making modeling in Revit takes a lot of time for a long time to have a careful and is to be accurate results.
ANALISA ASPEK-ASPEK DALAM PROSEDUR CHANGE ORDER PADA PROYEK KONSTRUKSI Michael Halmar Kosasi; Andi Andi; Lie Arijanto
Dimensi Utama Teknik Sipil Vol. 6 No. 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.1.9-16

Abstract

Change order merupakan perubahan kondisi kontrak yang mengubah harga, dan schedule proyek. Penelitian sebelumnya menunjukan claim change order mencapai 50% dari keseluruhan claim, dimana 76% diantaranya merupakan change order lisan dan separuhnya mengalami kegagalan claim. Tujuan penelitian adalah mengetahui berbagai aspek dalam prosedur change order. Metode penelitian yaitu dengan membuat kuesioner berdasarkan literatur terhadap “frekuensi kejadian” dan “tingkat kepentingan”. Data dianalisa deskriptif untuk mendalami kondisi proyek dan literatur beserta penyebabnya secara mendalam, yang kemudian dilakukan analisa perbedaan kontraktor dan MK melalui uji T-Test. Berdasarkan analisa diketahui saat identifikasi, change order diprakarsai owner, kontraktor, MK dengan site instruction, selanjutnya kontraktor harus mengajukan proposal gambar, spesifikasi, harga, dokumentasi. Selanjutnya owner akan mengevaluasi harga satuan dan mengukur volume bersih berdasar perubahan gambar. Pada tahapan approval, owner memberikan tanda tangan berdasarkan harga yang disetujui. Payment dilakukan dengan invoice terpisah sesuai progress change order beserta biaya tidak langsung, sedangkan tambahan waktu diberikan dalam hari kalender Change orders are changes in contract conditions change prices, and the project schedule. Previous research shows change order claims reaches 50% of total claim, where 76% given in verbal, and half have failed. The research objective is to determine the various aspects of the change order procedure. The research method is to create a questionnaire based on the literature of the "frequency of occurrence" and "level of interest". Data were analyzed descriptively to explore the conditions of the project and literature and how it happens, analyzed the differences contractors and MK through T-Test. Based on the analysis found that identification phase, change orders initiated by the owner, the contractor, MK with site instruction, then the contractor must submit a proposal drawings, specifications, price, documentation. Next phase, owner will evaluate the unit price and measuring the net volume based on changes drawing. At approval phase, owner provides a signature based on the agreed price. Payment is done by a separate invoice based on progress including indirect costs, while additional time is given in calendar days.
OPTIMASI TOPOLOGI DAN UKURAN PENAMPANG STRUKTUR RANGKA BATANG BAJA DENGAN METODE METAHEURISTIK Ricky Agusta Hartono; Doddy Prayogo; Wong Foek Tjong
Dimensi Utama Teknik Sipil Vol. 6 No. 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.1.33-42

Abstract

Optimasi topologi dari struktur rangka batang baja memberikan hasil yang lebih optimal dibandingkan optimasi ukuran penampang karena batang dan nodes yang tidak berguna pada struktur dapat dihilangkan. Fungsi objektif dari algoritma metaheuristik adalah untuk meminimalkan massa struktur rangka batang baja terhadap constraints statis dan dinamis berdasarkan studi kasus dan spesifikasi bangunan baja struktural Indonesia, SNI 1729:2015. Empat algoritma yang digunakan pada studi ini adalah: Particle Swarm Optimization, Differential Evolution, Teaching-Learning-Based Optimization, dan Symbiotic Organisms Search. Keempat algoritma tersebut diuji pada studi kasus 24-bar truss. Performa dari algoritma diukur dari lima kriteria massa, yaitu: massa terbaik, terburuk, rata-rata, standar deviasi, dan median dari struktur rangka batang baja. Hasil penelitian menunjukkan SOS menunjukkan performa terbaik pada studi kasus 24-bar truss.
PENGGUNAAN METODE TAKT TIME UNTUK PERENCANAAN JADWAL PEKERJAAN FINISHING DAN MEKANIKAN ELEKTRIKAL PLUMBING PADA SEBUAH PROYEK APARTEMEN Vedi Wihono Susilo; Andi Andi
Dimensi Utama Teknik Sipil Vol. 6 No. 1 (2019): April 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.1.25-32

Abstract

ABSTRAK: Penjadwalan merupakan suatu hal yang sangat penting karena akan menentukan sebuah proyek selesai pada waktu yang ditentukan atau malah melebihi dari yang ditentukan, apabila melebihi dari yang ditentukan maka akan terkena sanksi. Penelitian ini dilakukan studi kasus pada proyek apartemen yang berlokasi di Surabaya bagian barat dimana metode yang dilakukan adalah dengan menggunakan takt time planning pada pekerjaan finishing dan MEP. Data-Data yang dibutuhkan didapatkan dengan cara meminta kepada chief engineering dan setelah data tersebut didapatkan maka diolah menjadi suatu perencanaan baru dengan menggunakan metode takt time planning. Dalam pengolahannya dibutuhkan koordinasi dengan orang-orang dilapangan supaya tidak terjadi kendala pada saat pelaksanaan nya sehingga dapat menghasilkan hasil yang diharapkan. Hasil dari penelitian ini didapatkan bahwa perencanaan dengan menggunakan metode takt time yaitu terjadinya keselarasan dalam tiap-tiap pekerjaan selain itu juga dapat mempercepat durasi proyek sebesar 1 minggu dari perencaan awal.
OPTIMIZED MANAGEMENT STRATEGY FOR CONSTRUCTION PROJECTS CONSIDERING THE TRADE-OFF OF ESTIMATE SCHEDULE AND COST AT COMPLETION Liem Stefani Meilia Gunawan; Min-Yuan Cheng; Doddy Prayogo
Dimensi Utama Teknik Sipil Vol. 6 No. 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.2.26-37

Abstract

Nowadays, the minimization of project time and cost is an important issue. However, time and cost problems are difficult to solve. They are affected by the uncertain factor. Then, the construction project always fails to achieve the effectiveness of time and cost performance. It causes delays and cost overrun. In this research, SOS-NN-LSTM is required to establish the estimate schedule to completion (ESTC) and estimate cost to completion (ECTC) prediction model based on time now performance. Then, the prediction model will be integrated with MOSOS to obtain the optimal prediction value. The integration is needed because there is no direct equation to calculate the ESTC and ECTC. The Pareto curve identified based on the prediction values of MOSOS. The Pareto curve is used to determine the optimal trade-off between project duration and project cost. Then, the indifference curve is used to solve the trade-off problem between estimate schedule at completion (ESAC) dan estimate cost at completion (ECAC) which give the decision-maker preference.
Faktor-Faktor Yang Mempengaruhi Keputusan Calon Pembeli Dalam Melakukan Pembelian Apartemen Mewah di Surabaya Williams Dennis Masamitsu; Timoticin Kwanda; Jani Rahardjo
Dimensi Utama Teknik Sipil Vol. 6 No. 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.2.38-48

Abstract

Williams Dennis Masamitsu: Postgraduate Thesis Factors That Influence Prospective Buyer's Decisions to Buy Luxury Apartment in Surabaya This research aims to find out factors that influence prospective buyer’s decision to buy luxury apartment in Surabaya. Data which were collected through online survey from 68 respondent from various city in Indonesia who have the desire to buy luxury apartments in Surabaya. Research gap in this study is that researchers add 2 new variables that have not been studied before. These variables are the another apartments costs and property management. This type of research is quantitative causal. This research used regression models to analyze the effect of price and scheme, another apartment costs, motivation, lifestyle, environment and relation, location, facility, building design and structure, property management, and promotion on prospective buyers to buying decision to luxury apartment in Surabaya. The result showed that simultaneously all the variable have positive and significant influence on consumer buying decision. Partially, the result showed that environment and relation, building design and structure, and property management has the most dominant effect on prospective buying

Page 10 of 18 | Total Record : 171