cover
Contact Name
Rizki Amalia Tri Cahyani
Contact Email
rizkiatcahyani@gmail.com
Phone
+6285233000052
Journal Mail Official
media.teknik.sipil@umm.ac.id
Editorial Address
Jl. Raya Tlogomas 246 Malang, East Java, Indonesia, Postal Code: 65144
Location
Kota malang,
Jawa timur
INDONESIA
Media Teknik Sipil
ISSN : 16933095     EISSN : 25977660     DOI : 10.2229.
Core Subject : Engineering,
Arjuna Subject : -
Articles 433 Documents
ANALISA TARIF ANGKUTAN UMUM BERDASARKAN BIAYA OPERASIONAL KENDARAAN, ATP DAN WTP Arum, Sekar; ., Samin
Media Teknik Sipil Vol 12, No 2 (2014): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v12i2.2290

Abstract

ANALISA TARIF ANGKUTAN UMUM BERDASARKAN  BIAYA OPERASIONAL KENDARAAN, ATP  DAN WTPAnalysis of Public Transport Rates Based Vehicle Operating Costs , And WTP ATPSekar Arum1 & Samin21,2Jurusan Sipil Fakultas Teknik Sipil Universitas Muhammadiyah MalangAlamat Korespondensi : Jl. Raya Tlogomas No.246, Malang (0341) 464318Email : 1)arumsekar887@yahoo.comAbstractThe determination of trasportation tariff needs a wise manangement and policy because for able to bridge the passengers’ interest as the consumers and the public trasportation operator. NUANSA INDAH city bus a public trasportation servers the strategic areas which is expected to represent the publick trasportation passengers particularly city bus in kab. Paser. Data is collected by distribute questionnaire to passngers of NUANSA INDAH city bus and also interview whit NUANSA INDAH bus operators, output of data analysus is to find out amount of vehicle Oprational Cost (BOK) by NUANSA INDAH and to find out the passengers’ ability to pay and willingness to pay the city bus tariff. The result of research shows tariff based on BOK is 14.140,4, based on ability to pay (ATP) on wekday is Rp. 22.500 for public category and Rp 12.500 for public category and Rp  22.500 for student category. The value of Willingness To Pay (WTP) on weekday is Rp 22.291,9 for public category and is Rp. 22.656,25 for student category. WTP on weekend season is Rp. 23.100,172 for public category and Rp. Rp. 19.192,30 for student category.Keywords : tariff, vehicle Oprational Cost (BOK), ability to pay (ATP), (WTP).AbstrakPenentuan besaran tarif angkutan membutuhkan penanganan dan kebijakan yang arif, Data di dapat dengan penyebaran kuisioner kepada pengguna angkutan bus PO. NUANSA INDAH dan juga wawancara dengan pengelola bus PO. NUANSA INDAH kemudian data di analisis, hasil data analisis untuk memenuhi besarnya biaya oprasional kendaraan (BOK) yang di keluarkan oleh oprator PO. NUANSA INDAH dan mengetahui daya beli penumpang dari kemampuan (ability) dan kemauan (willingeness) untuk membayar tarif bus kota. Hasil analisis dan menunjukan tarif berdasarkan BOK Rp. 14.140,4, berdasarkan Ability To Pay (ATP) pada hari kerja sebesar Rp. 22.500 untuk kategori umum dan Rp. 12.500 untuk kategori pelajar pada hari libur sebesar Rp. 22.500 untuk kategori umum dan Rp. 12.500 untuk kategori pelajar. Besarnya nilai Willingness To Pay (WTP) pada hari kerja sebesar Rp. 22.291,9 untuk kategori umum dan Rp 22.656,25 untuk kategori pelajar hari libur sebesar Rp. 23.100,172 untuk kategori umum dan Rp. 19.192,30 untuk kategori pelajar. Kata kunci : tarif Biaya Oprasional Kendaraan BOK, ATP dan WTP
PENGARUH PENGEKANGAN GFRP TERHADAP KEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK Achmad, Karmila; SMD, Agoes; ., Tavio
Media Teknik Sipil Vol 10, No 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1789

Abstract

Karmila Achmad1, Agoes SMD2 & Tavio31Mahasiswa Program Magister Teknik Sipil Struktur Universitas Brawijaya, Malang dan Dosen Politeknik NegeriBalikpapan2 Guru Besar Teknik Sipil Struktur Universitas Brawijaya, Malang3Dosen Teknik Sipil Struktur-FTSP Institut Teknologi Sepuluh Nopember, SurabayaEmail : milabpp@yahoo.co.idABSTRACTThe aim of this research is to get improving of strength and ductility in column specimen giventhe GFRP strengthener (Glass Fiber Reinforced Polymer) toward with original column, by using thecyclic load as the fix representative of quake load. There are two specimens full scale used. Theyare C-1 (original column) and C-1G (column with GFRP strengthener 1 layer). From the researchgot Pmax sequentially is 278,9 kN and 372.4 kN, and dmax is 53.24 mm and 56.78 mm, each for C-1and C-1G. For C-1 column, the concrete gets damage in plastic hinge zone at drift ratio 3.5%indicated by bending of longitudinal steel bar and spalling of cover concrete. The test for C-1G endsin third cycle at drift ratio 5% and gets damage in fracture of GFRP in plastic hinge zone. Thedamage is the changing of resin color the circumferential direction in three spots. They are as longas 10, 11 and 18 cm. Ductility index taken on three positions are plastic hinge zone, column with ahalf high effective and as high as effective column. From the analyze result got ductility index C-1on the three positions are 1.65; 1.70; 1,97 and ductility index C-1G are 1,44; 1,44 and 1,38 each forplastic hinge zone, a half high effective and as high as effective columnKey words : ductility, GFRP, strength, external confinement, cyclic
OPTIMALISASI WAKTU PENYELESAIAN PEKERJAAN PROYEK KONSULTAN PENGAWASAN PADA DINAS PEKERJAAN UMUM DI KOTA TARAKAN Syaihu, Acmad; Anwar, M. Ruslin; Pujiraharjo, Alwafi
Media Teknik Sipil Vol 14, No 2 (2016): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v14i2.3700

Abstract

Penelitian yang dilakukan ini bertujuan untuk mengetahui waktu optimal pekerjaan proyek dan pengawasan. Proyek pada umumnya memiliki batas waktu (deadline), artinya proyek harus diselesaikan sebelum atau tepat pada waktu yang telah ditentukan. Selain itu adanya keterlambatan berakibat kehilangan peluang pekerjaan pengawasan lain. adapun bagi owner keterlambatan penyelesaian pekerjaan proyek akan menyebabkan catatan yang tidak baik, sehingga penggunaan hasil pembangunan proyek menjadi mundur atau terlambat. Dengan metode PERT dan CPM dapat menentukan lintasan kritis (network planning) dalam suatu kegiatan proyek tahap demi tahap secara berurutan untuk penyelesaian kegiatan proyek tersebut.Dengan time schedule dapat menyusun network planning dan menentukan hitungan maju mundur dan kelongaran waktu.Hasil analisa pelaksanan dan pengawasan yang diambil tiga bidang PSDA,Bina Marga dan Cipta Karya terdiri dari 120 hari kalender,150 hari kalender dan 360 hari kalender. Dapat optimalisasi waktu fisik  menjadi 91 hari kalender menjadi 118 dan  menjadi 280 hari kalender dan Bidang PSDA, Bina Marga dan Cipta Karya pengawasan dapat menyelesaikan 104 hari kalender, 134 dan 300 hari kalender,kesimpulan dari penelitian ini ketiga bidang Optimal waktu dapat menyelesaikan pekerjaan,nilai Z= (99.99%, 98.98%, and 99.99%) dan pengawasan dapat meyelasaikan dilapangan kegiatan proyek tepat pada waktu yang telah ditentukan (95,91%, 93,94%, 99,99%). 
Konsumen Perumahan Kepada Developer (Studi Kasus Perumahan di Kabupaten Jember) Gunasti, Amri
Media Teknik Sipil Vol 12, No 2 (2014): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v12i2.2281

Abstract

Konsumen Perumahan Kepada Developer (Studi Kasus Perumahan di Kabupaten Jember)Product Innovation Effect Of Housing Housing Consumer Confidence To Developer (A Case Study Of Housing In Jember )Amri GunastiJurusan Teknik Sipil-Manajemen Konstruksi Universitas Muhammadiyah JemberAlamat Korespondensi : Jl. Karimata No. 49 JemberAmri.gunasti@yahoo.co.idAbstractHousing construction industry in Jember district in general is relatively undeveloped . Nevertheless , there are still some developers who have difficulty in marketing their products . This is evidenced by the house that they marketed products are not sold in a matter of months or even years and not infrequently the developer is unable to continue its business by closing the company , for that is necessary to do research on the influence of product innovation residential housing to consumer confidence to developers . This research included in this type of research because the goal confirmatory study describes causal relationships between variables through hypothesis testing using SEM method that allows to estimate on a number of different regression equations . The results showed housing product innovation significantly influence the direction of the housing consumer confidence positive relationship . It is seen from the positive path coefficient of 0.829 with CR for 2527 and obtained a significant probability ( p ) of 0000 Smaller than the significance level ( á ) required 0.05 , which means that if the consumer perception of product innovation housing will increase , it will be meningkatkankan housing consumer confidence and vice versa if the consumer perception of product innovation housing down will lower consumer confidence housingKeywords : product innovation , trust , Developer AbstrakIndustri Konstruksi perumahan di kabupaten jember secara umum relatif berkembang. Namun demikian, masih ada beberapa pengembang yang mengalami kendala dalam memasarkan produknya. Hal ini dibuktikan dengan produk rumah yang mereka pasarkan tidak terjual dalam hitungan bulan bahkan tahunan dan tidak jarang pengembang tidak dapat melanjutkan bisnisnya dengan menutup perusahaannya, untuk itulah perlu dilakukan penelitian tentang pengaruh inovasi produk perumahan terhadap kepercayaan konsumen perumahan kepada developer. Penelitian ini termasuk dalam jenis penelitian confirmatory research karena tujuannya menjelaskan hubungan kausal antar variabel melalui pengujian hipotesis dengan menggunakan metode  SEM yang memungkinkan untuk melakukan estimasi atas sejumlah persamaan regresi yang berbeda. Hasil penelitian menunjukkan Inovasi produk perumahan berpengaruh signifikan terhadap kepercayaan konsumen perumahan dengan arah hubungan positif. Hal ini terlihat dari koefisien jalur positif sebesar 0,829 dengan CR sebesar 2.527 dan diperoleh probabilitas signifikan (p) sebesar 0.000 Lebih kecil dari taraf signifikan (á) yang disyaratkan 0,05,  yang berarti bahwa jika persepsi konsumen akan inovasi produk perumahan meningkat, maka akan meningkatkankan kepercayaan konsumen perumahan dan sebaliknya jika persepsi konsumen akan inovasi produk perumahan turun maka akan menurunkan kepercayaan konsumen perumahan Kata kunci :  Inovasi Produk, Kepercayaan, Developer.
Pedoman & Redaksi Jurnal Media Teknik Sipil, Volume 10, Nomor 2, Agustus 2012 & Redaksi, Pedoman
Media Teknik Sipil Vol 10, No 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1746

Abstract

Pedoman & Redaksi Jurnal Media Teknik Sipil, Volume 10, Nomor 2, Agustus 2012
Analisis Capaian Sistem Penyedian Air Minum Perdesaan di Desa Sumberkima, Bali Sudarsana, D.K.
Media Teknik Sipil Vol 14, No 1 (2016): Februari
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v14i1.3287

Abstract

The government announced a settlement infrastructure performance achievement in 2019 with 100% access to drinking water, 0%  slump, 100% sanitary, known as 100-0-100 initiative. MDG'S 2015 settlement infrastructure sectors targeted are 68-10-62. To determine the achievement of this target needs to be evaluated. In this paper specifically analyze the achievement of rural drinking water supply system (SPAMDes). Descriptive method is used in this study. Studies conducted in the village Sumberkima, District Grokgak, Bali Province. Data collected by census method. Variables to determine the indicators of access to drinking water using the terms of reference of the Ministry of Public Works. The analysis finds access of  drinking water service until August 2015 reached 85%. The achievement of the access to drinking water service is sourced from the piping connection from  BUMDES 32%, 26% of shallow wells and deep wells 27%. Although the service is access to drinking water reached above the 2015 target (85%> 68%), but needs to be improved serviceability with access to drinking water piping connection system of BUMDES to improve the safer of quality.
Pemakaian Fine Coarse Aggregate Sebagai Bahan Paving Tahan Aus (Fine Coarse Aggregate Usage As Raw Materials Of Abrasion Resistant Paving) Rommel, Erwin Rommel
Media Teknik Sipil Vol 9, No 1 (2011): Februari
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v9i1.1113

Abstract

Paving blocks are widely used in pavement construction such as container terminals, highways, parking lots, other open areas. Ease of installation, low maintenance and meet of the aestethics aspect cause more paving blocks of preferred. The FCA (fine coarse aggregate) paving blocks has the advantage in a mixture of 1:4:3, which is made by full-pressing method at 100 kg/cm2 with a strength reaches 406 kg/cm2 (grade-1); impact resistance is the best on the mixture of paving the heering-bone pattern. This further research will look at the quality aspects of paving from the abrasion resistance and the absorption rate of FCA paving blocks to provide paving mixture variables in (1; 4; 0, 1; 4; 3, 1; 4; 5) and the amount of pressing (60; 80 and 100 kg/cm2). The research results obtained minimum the abrasion resistance obtained at the paving 1; 4; 3 is given pressing 100 kg/cm2, abrasion value of 0.046 mm / min on a top layer of paving using admixture 1; 2 and 0.089 mm / min on without a top layer of paving blocks. The best absorption levels obtained at the paving with the same composition but at 60 kg/cm2 pressing provision.Key-word :  pressing, strength, abrasion resistance
Prediksi Beban Sedimentasi Waduk Selorejo Menggunakan Debit Ekstrapolasi dengan Rantai Markov Setyono, Ernawan; Ismijayanti, Devi
Media Teknik Sipil Vol 13, No 1 (2015): Februari
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v13i1.2542

Abstract

Prediksi Beban Sedimentasi Waduk Selorejo Menggunakan Debit Ekstrapolasi dengan Rantai MarkovPrediction of Reservoir Sedimentation Selorejo Loads Using Debit Extrapolation Markov ChainErnawan Setyono1 & Devi Ismijayanti21,2Jurusan Teknik Sipil – Fakultas Teknik Univ. Muhammadiyah MalangAlamat Korespondensi : Jl. Raya Tlogomas 246 Malang 65144Email : 2)dhevieismijayanti.1992@gmail.comAbstractSelorejo reservoirs in operation since 1970 and is expected to operate and serve the needs of water up to the year 2020. The main problem encountered in the construction and operation of reservoirs is how to keep the service life of the reservoir as planned, one of which causes the sediment that settles at the bottom of the reservoir , Based on the results of recent measurements, it is known that the dead storage capacity of 1.71 million m3. Each year has an additional volume of sediment that settles that require greater storage capacity. The results showed that in 2014 increased storage capacity for additional volume of sediment that settles at 3,223,797.64 m3 and storage capacity increased to 4,933,797.64 m3. 2015 dead storage capacity increased to 7,920,967.58 m3 and continued to increase until 2020 dead storage capacity reaches 25,585,055.30 m3. This situation shows that the volume of sediment elevation has crossed the level of low-water line (LWL) and already exceeds the volume of the sediment storage capacity die before the age of reservoirs that have been planned so that it takes some effort to reduce the rate of sedimentation in the reservoir.Keywords: reservoirs, dead storage capacity, sedimentAbstrakWaduk Selorejo beroperasi sejak tahun 1970 dan diharapkan dapat beroperasi dan melayani kebutuhan air hingga pada tahun 2020. Masalah utama yang dihadapi dalam pembangunan dan pengoperasian waduk adalah bagaimana menjaga agar umur layanan waduk sesuai dengan yang direncanakan, salah satunya penyebabnya adanya sedimen yang mengendap di dasar waduk. Berdasarkan hasil pengukuran terakhir, diketahui bahwa kapasitas tampungan mati 1,71 juta m3. Setiap tahun memiliki tambahan volume sedimen yang mengendap sehingga memerlukan kapasitas tampungan yang lebih besar. Hasil penelitian menunjukkan bahwa pada tahun 2014 kapasitas tampungan meningkat karena penambahan volume sedimen yang mengendap di 3,223,797.64 m3 dan kapasitas tampungan meningkat menjadi 4,933,797.64 m3. Tahun 2015 kapasitas tampungan mati meningkat menjadi 7,920,967.58 m3 dan terus meningkat hingga 2020 kapasitas tampungan mati mencapai 25,585,055.30 m3. Situasi ini menunjukkan bahwa volume elevasi sedimen telah menyeberangi tingkat garis air rendah (LWL) dan sudah melebihi volume kapasitas tampungan sedimen mati sebelum usia waduk yang telah direncanakan sehingga dibutuhkan beberapa upaya untuk mengurangi tingkat sedimentasi ke dalam reservoir.Kata kunci: waduk, kapasitas tampungan mati, sedimen
STUDI PERENCANAAN TPA MASUKAU DENGAN SISTEM SANITARY LANDFILL DI KABUPATEN TABALONG KALIMANTAN SELATAN Nazhary, Rahmat; K, Warih
Media Teknik Sipil Vol 12, No 1 (2014): Februari
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v12i1.2047

Abstract

STUDI PERENCANAAN TPA MASUKAU DENGAN SISTEMSANITARY LANDFILL DI KABUPATEN TABALONGKALIMANTAN SELATANRahmat Nazhary1, Warih K21&2 Jurusan Teknik Sipil Fakultas Teknik – Universitas Muhammadiyah MalangAlamat korespondensi : Jalan Raya Tlogomas 246 Malang 65144ABSTRACTOpen Dumping merupakan salah satu metode pengelolaan sampah yang murah dan mudahuntuk dilakukan pada pengoperasiannya. Metode ini memiliki banyak kekurangan, karena lindi yangdihasilkan tidak dapat dikontrol, menimbulkan bau, estetika yang buruk, pencemaran air tanah danpermukaan, serta dampak negative lainnya. Namun metode inilah yang digunakan di seluruh TPAyang ada di Kabupaten Tabalong, dimana tidak ada pengelolaan/pencegahan yang baik terhadappencemaran baik air, udara, dan tanah, serta control terhadap sanitasi lingkungan.Perlu adanya perubahan metode pengelolaan sampah dari Open Dumping menjadi SanitaryLandfill sesuai UU no.18 tahun 2008 tentang pengelolaan sampah. sistem sanitary landfill inimerupakan salah satu sistem pengolahan sampah terkontrol dengan sistem sanitasi yang baik. Sampahdibuang ke Tempat Pemprosesan Akhir (TPA), kemudian sampah dipadatkan dengan bulldozer danselanjutnya di tutup tanah.Dari hasil analisa diperoleh jumlah penduduk tahun 2032 sebanyak 5.394.643 jiwa dan timbulansampah sebesar 668.760,08 m3. Dari analisa stabilitas lereng didapat nilai FS dengan menggunakanmetode Bishop = 4,322, Fellenius = 4,019, dan metode Janbu = 3,814 dinyatakan aman.Kata Kunci : Sanitary Landfill, Stabilitas Lereng, Gas Metan.
PENGARUH BUKAAN (OPENING) TERHADAP KAPASITAS LENTUR BALOK BETON BERTULANG Wijaya, Handika Setya
Media Teknik Sipil Vol 15, No 1 (2017): Februari
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v15i1.4491

Abstract

Dalam konstruksi bangunan-bangunan modern, instalasi perpipaan dibutuhkan untuk mengakamodasi kebutuhan mekanikal dan elektrikal. Salah satu alternatif rencana untuk melewatkan instalasi perpipaan tersebut adalah dengan membuat bukaan (opening) pada balok. Penelitian ini bertujuan untuk mencari seberapa besar pengaruh pemberian beberapa variasi jumlah bukaan yang diberikan di zona tarik beton terhadap kekuatan dan kekakuan lentur balok beton bertulang. Pengujian yang dilakunan adalah pengujian lentur dengan benda uji balok berukuran (15 x 25 x 200) cm. Variasi penelitian ini yaitu jumlah bukaan berdiameter 5 cm yang berjumlah dua bukaan (BB2) dan empat bukaan (BB4) dan balok tanpa bukaan (BK). Dari hasil penelitian menunjukkan bahwa pemberian bukaan pada zona tarik beton mereduksi kekuatan lentur meskipun tidak signifikan. Jika dibandingkan dengan BK, reduksi kekuatan lentur untuk balok BB2 sebesar 1.26% dan reduksi untuk balok BB4 sebesar 5.66%. Untuk kekakuan lentur pada kondisi praretak, terjadi reduksi kekakuan lentur. Jika dibandingkan dengan BK, reduksi kekakuan lentur untuk balok BB2 sebesar 9% dan reduksi untuk balok BB4 sebesar 15.24%. Untuk kekakuan lentur pada kondisi pascaretak, terjadi reduksi kekakuan lentur juga. Jika dibandingkan dengan BK, reduksi kekakuan lentur untuk balok BB2 sebesar 13.03% dan reduksi untuk balok BB4 sebesar 18.68%.