cover
Contact Name
Mia Wimala
Contact Email
miasoejoso@unpar.ac.id
Phone
+6222-2032655
Journal Mail Official
josc@unpar.ac.id
Editorial Address
Jl. Ciumbuleuit No.94, Hegarmanah, Kec. Cidadap, Bandung, Provinsi Jawa Barat, 40141
Location
Kota bandung,
Jawa barat
INDONESIA
Journal of Sustainable Construction
ISSN : 29644437     EISSN : 28082869     DOI : https://doi.org/10.26593/josc
Core Subject : Engineering,
The Journal of Sustainable Construction (JoSC) is a double-blind peer-reviewed and open access journal that provides a venue for publishing original research articles focusing on promoting and advancing the research and applications of sustainable construction from both empirical and theoretical perspectives. The scope of the journal is as below but NOT LIMITED to: Construction management Project delivery system Green construction material, method, and technology Construction information technology Asset management and infrastructure Construction policy, law, and contract Construction risk management Human resources management Disaster risk management Construction automation
Articles 95 Documents
Developing a Sustainability Maturity Model for Construction Project Management in Nigeria: A Multi-Criteria Assessment Approach Hyginus Chidiebere Onyekachi Unegbu; Danjuma Saleh Yawas; Bashar Dan-asabe; Abdulmumin Akoredeley Alabi
Journal of Sustainable Construction Vol 6 No 1 (2026): Journal of Sustainable Construction
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/josc.v6i1.9214

Abstract

This study develops and validates a Sustainability Maturity Model (SMM) tailored to construction project management in Nigeria using a hybrid Multi-Criteria Decision-Making (MCDM) approach that integrates the Analytical Hierarchy Process (AHP) and the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The model was designed to address the limitations of imported sustainability assessment frameworks whose indicators, weighting structures, and implementation assumptions are often poorly aligned with Nigeria’s regulatory, economic, technical, and socio-cultural construction context. Sustainability indicators were identified from the literature and refined through stakeholder consultation, after which AHP was used to determine indicator weights and TOPSIS was applied to rank 20 Nigerian construction projects according to their relative sustainability maturity. The model assesses project performance across environmental, economic, and social dimensions and classifies projects into five maturity levels: Initial, Managed, Defined, Integrated, and Optimizing. Findings show that energy efficiency, waste management, and lifecycle costing received the highest priority weights, while social indicators such as community engagement and labor practices were comparatively underweighted. Higher-ranked projects demonstrated stronger integration of environmental and economic sustainability practices, whereas lower-ranked projects exhibited gaps in waste management, resource optimization, labor practices, and community engagement. The study contributes theoretically by extending sustainability maturity modelling to a developing-country construction context and methodologically by combining expert-based weighting with project-level ranking. 
Pemetaan Penelitian Manajemen Risiko pada Bangunan Gedung Hijau Jannuar Yeremy; Edward Liongson
Journal of Sustainable Construction Vol 6 No 1 (2026): Journal of Sustainable Construction
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/josc.v6i1.10275

Abstract

Perubahan iklim mendorong sektor konstruksi untuk mengadopsi konsep bangunan gedung hijau sebagai upaya mengurangi dampak lingkungan. Namun, implementasinya menghadapi berbagai risiko yang kompleks, baik dari aspek teknis, finansial, maupun regulasi. Penelitian ini bertujuan untuk memetakan perkembangan penelitian serta mengidentifikasi kesenjangan (research gap) dan arah pengembangan studi terkait manajemen risiko pada bangunan gedung hijau. Metode yang digunakan adalah Systematic Literature Review (SLR) dengan pendekatan PRISMA melalui proses identifikasi, penyaringan, dan seleksi literatur secara sistematis. Sebanyak 29 artikel ilmiah dianalisis untuk mengevaluasi tren penelitian dan tahapan manajemen risiko yang dikaji. Hasil penelitian menunjukkan bahwa kajian masih didominasi oleh pendekatan kualitatif dengan fokus pada identifikasi dan analisis risiko berbasis penilaian ahli. Sementara itu, penelitian terkait alokasi risiko dan strategi respons risiko masih terbatas. Padahal, kedua aspek tersebut penting dalam meningkatkan efektivitas pengelolaan risiko. Penelitian ini merekomendasikan pengembangan model alokasi risiko, integrasi teknologi analitik, serta inovasi pembiayaan untuk mendukung implementasi bangunan hijau secara berkelanjutan.  
A Regulatory Cross-Check of Indonesia's Port Planning Framework Against Green and Smart Port Requirements Adrian Firdaus
Journal of Sustainable Construction Vol 6 No 1 (2026): Journal of Sustainable Construction
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/josc.v6i1.10933

Abstract

Indonesia's Green and Smart Port (GSP) Assessment combines infrastructure, environmental, management, energy, and digital requirements. This study identifies GSP components relevant to pre-construction planning and cross-checks them against Indonesian port-planning regulations and technical guidelines using structured document analysis. Because the source guideline contains inconsistencies between its summary counts and detailed assessment tables, the analysis is limited to 20 recoverable items containing identifiable planning components. Planning coverage was assessed separately from complementary sectoral regulation. In the revised audit, three items were fully covered in the primary planning corpus, twelve were partially covered, and five planning requirements were not identified. Complementary regulations were identified for several uncovered components, including shore-power provision and use, domestic wastewater treatment, hazardous-waste management, energy management, and digital-service governance, but these do not necessarily constitute port-planning requirements. The results indicate that Indonesian planning instruments already address many GSP-related subjects, although coverage is more often partial than complete and is fragmented across planning and sectoral instruments. The study evaluates normative regulatory coverage only and does not establish project-level implementation, operational compliance, or GSP certification performance.
Evaluasi Constructability dan Interface Pekerjaan pada Konstruksi Underpass di Bawah Jalur Kereta Aktif Zahira Izzatie; Muhammad Faishal Jaelani; Y Djoko Setiyarto; Muhamad Rizki; Fajar Eka Guntara
Journal of Sustainable Construction Vol 6 No 1 (2026): Journal of Sustainable Construction
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/josc.v6i1.10989

Abstract

Konstruksi underpass di bawah jalur kereta aktif memiliki keterkaitan pekerjaan yang tinggi karena pekerjaan sementara, pekerjaan tanah, struktur permanen, operasi rel, alat berat, utilitas, dan koordinasi multipihak berlangsung dalam ruang dan waktu yang saling bergantung. Penelitian ini bertujuan untuk mengevaluasi constructability dan interface pekerjaan pada Proyek Underpass Jl. Gatot Subroto, Cimahi, melalui pemetaan ketergantungan 12 aktivitas dan penilaian 8 indikator pada skala 1–5. Constructability Score (CS) dan Interface Score (IS) dihitung secara terpisah, sedangkan prioritas relatif ditentukan menggunakan kuartil atas proyek, yaitu Q3(CS)=4,50 dan Q3(IS)=4,31. Hasil menunjukkan bahwa galian di bawah rel (CS=4,75; IS=4,75), pemasangan cross beam dan penataan track (4,50; 4,75), serta restorasi subballast, ballast, dan track (4,50; 4,50) merupakan aktivitas prioritas utama. Modifikasi bored pile tengah memiliki constructability tinggi (CS=4,75), tetapi interface lebih rendah (IS=4,00). Temuan diterjemahkan menjadi hold point, method statement, readiness check, railway working window, survey verification, dan monitoring. Kerangka ini membantu memfokuskan pengendalian pada aktivitas yang secara bersamaan sulit dilaksanakan dan kompleks dari sisi antarmuka.
Studi Komparasi Bangunan Gedung Baja SPSW dengan CBF Tipe Two-Story-X Ibnu Nugraha; Erma Desimaliana; Badriana Nuranita; Muhammad Ardya Azmi Harsono
Journal of Sustainable Construction Vol 6 No 1 (2026): Journal of Sustainable Construction
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/josc.v6i1.11017

Abstract

Pemilihan sistem penahan gaya lateral pada gedung baja memerlukan penilaian kekakuan, deformasi, dan respons nonlinier secara bersamaan. Penelitian ini bertujuan membandingkan respons gedung rumah sakit 12 lantai menggunakan special plate shear walls (SPSW) dan concentrically braced frame (CBF) tipe Two-Story-X. Kajian pemodelan menggunakan software ETABS pada dua alternatif desain gedung baja berketinggian 42 m di Tangerang. Parameter yang ditinjau meliputi periode modal, gaya geser dasar, perpindahan atap, simpangan antartingkat, dan kurva pushover. Hasil menunjukkan bahwa CBF menghasilkan perpindahan atap arah X sebesar 42,364 mm, lebih rendah 27,08% dibandingkan SPSW sebesar 58,096 mm. Simpangan antartingkat maksimum pada arah X berkurang 33,14%, sedangkan perbedaannya pada arah Y hanya 1,59%. Pada langkah pushover terakhir yang terdokumentasi, gaya geser SPSW arah X mencapai 55.149,734 kN, sementara CBF mencapai 37.235,662 kN. Sebaliknya, gaya geser akhir arah Y lebih besar pada CBF. CBF lebih menguntungkan untuk pengendalian deformasi arah pengaku pada konfigurasi yang dikaji, sedangkan SPSW memperlihatkan respons pascaelastik arah X yang lebih berkembang.