cover
Contact Name
Asep Rahmatullah
Contact Email
admin@lppmbinabangsa.id
Phone
+628121950044
Journal Mail Official
admin@lppmbinabangsa.id
Editorial Address
S1 Teknik Industri Jl. Raya Serang – Jakarta KM.3 No.1B (Pakupatan) Kota Serang Provinsi Banten Telp. (0254) 220158; Fax. (0254) 220157
Location
Kota serang,
Banten
INDONESIA
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri
ISSN : 2798964X     EISSN : 27989658     DOI : https://doi.org/10.46306/tgc
Core Subject : Engineering,
Taguchi Adalah Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri terbit secara daring pada bulan Juni dan Desember. untuk menyebarluaskan hasil-hasil penelitian dalam bidang keilmuan Teknik dan Manajemen Industri sesuai dengan Body Knowledge pada Teknik industri.
Articles 162 Documents
PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN EARNED VALUE CONCEPT PADA PROYEK PEMBANGUNAN JALUR GANDA REL KERETA API LINTAS SELATAN JAWA MOJOKERTO-SEPANJANG Damarhuda Afdholi Martin; Budi Witjaksana
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.92

Abstract

The train flow between Mojokerto - Along the South Cross of Java, which is now only Single Tracking, is a train operation line that is heavy with traffic so that there are often delays in train travel. During the implementation of the Mojokerto-Sepanjang double-track railway construction project in week 43 – week 53, there was a schedule discrepancy in the field work with what had been planned, which could eventually result in time delays and cost overruns for project completion. From the existing background, the problem found is how is the performance of time and cost in the Mojokerto-Along Railway Double Line Construction project (Package 9)? The results of research using the Earned Value method in weeks 43 to 53 are CPI values < 1, this shows that the cost of implementing the work is greater than budgeted, so that the estimated cost of the project to be completed is IDR 53,236,370,349,979, Which means here the project suffers losses in terms of cost. Meanwhile, in terms of time in week 43, the SPI value > 1, meaning that time performance is on schedule or even ahead of plan. While in week 44 to week 53 the SPI value < 1, This means that the project is experiencing delays from the planned schedule. The calculation of the EAS value in week 53 results in the estimated project completion time of 853,993 days or 122 weeks, meaning that the project is delayed from the planned schedule
ANALISIS WAKTU STANDAR DALAM PENENTUAN JUMLAH TENAGA KERJA PADA PRODUKSI CAGE WHEEL DENGAN METODE STOPWATCH TIME STUDY Dea Ayu Maharani Andris; Handy Febri Satoto
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.93

Abstract

CV. Lancar Jaya is an industrial company in the field of manufacturing spare parts for agricultural equipment, one of which is Cage Wheel spare parts. In the production process, this company has several obstacles, including not having a standard time for workers to complete one unit of spare parts, so that each worker does not have a set target for completing how many units in a day. This causes some production to be unfulfilled, as well as fluctuating demand, where every month the total demand is not fixed. The assembly process is also done manually, so workers in the assembly section are an important factor in having a standard completion time in setting monthly production targets. The purpose of this study is to determine the standard time for workers to complete one Cage Wheel unit, as well as to find the required workforce for each division. The method used to solve the above problems is using the Stopwatch Time Study method. Data processing results obtained standard time on wheel cage size 16 for 20.48 minutes, wheel cage size 14 for 18.25 minutes and wheel size 12 for 17.10 minutes. With a vulnerable workforce of 1-2 people in each division
PENGENDALIAN KUALITAS UNTUK MEMINIMALKAN CACAT PRODUK PIPA STAINLESS STEEL PADA PT. PPW Dhoan Prasetyo Widanarko Cahyono; Siti Mundari
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.94

Abstract

Quality is an important key in a production process, especially in an increasingly developing era such as the current era of globalization. PT PPW is a company engaged in the stainless steel pipe industry. In the production process, there are three processes that use three production machines. Where the three machines still often experience defects in the second and third processes that exceed the tolerance standards set by the company. The problems that occur are the types of defects that arise in each process and what causes them, as well as how to minimize the number of defective products. Methods that can be used to identify defects and causes of defects can use the SPC method. Meanwhile, to minimize defective products, you can use FMEA analysis to implement the proposal according to the causes of the most critical defects. The results showed that the most critical types of defects were imperfect welds in the second process and imperfect polishing in the third work station. The cause of defects in the second work station was due to machine setting errors, while the causes of defects were due to the end of the polishing material and the physical condition of the product
ANALISIS KUALITAS SPAREPART PIPA PADA PRODUKSI MESIN FIILING UNTUK MENGURANGI JUMLAH CACAT STUDI KASUS DI PT XYZ Fandra Zakariyah; Muslimin Abdulrahim
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.95

Abstract

Rapid development in the business world and increasingly advanced economic development that causes various problems in the industry, but the company does not stop there because in reality there are still products that do not meet the specifications that have been determined or defective products. In the flow of the production process, filling machines experience several defects in the product production process which often experience defects in the pipe production section. From these data can later be identified the most types of defects and the level of characteristics using pareto diagrams, and the cause and effect of the production process. Statistical Process Control (SPC) explains that this tool is used to continuously monitor the production process on an ongoing basis and identify damage that occurs during the production process. Based on the results of the retro diagram, it was concluded that 32.2% of the number of defects in the production of filling machines in pipe product parts, namely leaky pipes. i.e. the process at the operator's work is less than the procedure. Companies have standards but the behavior of workers who lack discipline in carrying out their work during the production process (work method)
ANALISIS TINGKAT BISING PADA MESIN MOLEN DAN PENGARUH TERHADAP PRODUKTIVITAS KERJA DI CV. XYZ Athok Urrahman; Sajiyo Sajiyo
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.96

Abstract

Noise is still a serious problem. Like other problems, noise can also reduce the quality of life in humans and create a threat of danger to humans. Usually the noise occurs in traffic, and industry. Noise in the workplace must always be controlled to create a safe work area for workers. Problems such as health problems, psychological disorders, and communication disorders are the main problems that need to be controlled. Therefore this study aims to control noise that exceeds the applicable regulations. After leq analysis, the results obtained are operator point 3 = 104 dBA operator point 5 = 95.6 dBA, operator point 2 = 92.4 dBA, operator point 1 = 88.4 dBA, and operator point 4 = 85.5 dBA with an average -average 93.2 dBA . Then the results of the hypothesis test showed a correlation value of -0.885 and a significant value of 0.019 <0.05, which means that there is a negative and significant relationship between noise and productivity
ANALISIS KETERSEDIAAN DAN KEBUTUHAN AIR BERSIH DI DESA DESA PURUT KECAMATAN LUMBANG KABUPATEN PROBOLINGGO Maulana Rizal Bisri; Faradillah Saves
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.97

Abstract

The availability of potable raw water can be a difficult problem to fulfill. In the realities found in rural areas, the need for clean water is very important to ensure the quality of health, welfare, and economy of the community. Unpredictable natural factors and rapid population growth lead to an increase in the need for clean drinking water consumption. This analysis uses population data for the last 5 years requested at the village office in Purut Village, Lumbang District, Probolinggo Regency. This research will use several predetermined calculation methods so as to obtain a valid comparison for reference to the calculation of subsequent clean water needs and where from the 3 methods, 1 method was chosen, namely Geometric to be a reference for projected calculations. The purpose of this analysis is to determine the need and availability of clean water in the research location so that further accurate fulfillment planning activities can be carried out. The total clean water demand of Purut Village in 2032 according to the predicted population is 6.88 liters/second, the maximum daily demand is 8.25 liters/second, and the peak hour discharge is 11.00 liters/second. While the demand for clean water in 2032 according to the prediction of the number of each type of customer is 2.48 liters / second, the maximum daily requirement is 4.59 liters / second, and the discharge at peak hours is 6.12 liters / second. With the total demand and availability that is inversely proportional, other alternative raw water must be sought such as the addition of Pump Houses and Reservoirs in Purut Village and its surroundings so that the discharge and spring pressure can be stable and meet the need for clean water.
ANALISIS PENGENDALIAN KUALITAS PRODUK KERTAS DENGAN METODE STATISTICAL QUALITY CONTROL PADA PT ADIPRIMA SURAPRINTA GRESIK Muhammad Fahmi Idris; Istantyo Yuwono
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.99

Abstract

PT Adiprima Suraprinta is a subsidiary of Jawa Pos Group which is located in Sumengko Village, Wringinanom, Gresik. PT. Adiprima Suraprinta was founded in 1997, this factory is one of the industrial companies in Indonesia that produces paper. With paper industry competition being very tight, PT Adiprima Suraprinta needs to innovate and pay attention to the quality of its products to maintain stability in quality in order to become the leading paper company in Indonesia. Based on the results of the research and discussion analysis that has been described, it is known that the production of News Print Paper type newsprint in the 2022 period is 52174 Tons with defective conditions that occur in production of 14633 Tons of copies. The average defect in each production in a one-month period is 30%. in several production times there were defects that exceeded the target of the number of production. The analysis method used is check sheet, control chart, pareto and fishbone. This is based on observations made where damage to newsprint paper occurs during the production process using the company's Paper Mill machine where each machine is run by several operators. Therefore, efforts to overcome the occurrence of defects caused by these factors can be carried out by providing training to workers, creating a new work appraisal system with the aim of motivating workers' performance to be better. Checking the readiness of the machine before and after use so that it is in accordance with operational standards and Immediately replace damaged engine components so that they do not hinder the production process
EVALUASI PENERAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) MENGGUNAKAN METODE HIRARC PADA PROYEK PRESERVASI JALAN RIGID PAVEMENT BABAT-LAMONGAN-GRESIK Maria Fransiska Trinity Juraman; Michella Beatrix
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.100

Abstract

Human resources play an important role for the success of an organization or company system. Because humans are living assets that need special attention by companies. The fact that humans are the main asset in an organization or company, must receive serious attention and be managed as well as possible. This is intended so that the human resources owned by the company are able to provide optimal contributions in efforts to achieve organizational goals. It is in the management of human resources that management is required to be able to manage resources in a systematic, planned and efficient manner. In human resource management, there is also one thing that must be a concern, namely, the occupational safety and health system. Occupational safety and health (K3) issues in general in Indonesia are often neglected. This is indicated by the still high number of work accidents. In Indonesia, especially in the business world that requires a large workforce such as construction projects, occupational health and safety is often ignored with the classic reason by business owners that the costs for occupational health and safety for workers are considered expensive. As is the case with PT. Cahya Indah, which is a company engaged in the construction sector with a large work capacity, it is fitting that the Occupational Health and Safety of workers be considered. Implementation of Occupational Safety and Health (K3) carried out by the construction sector. One example of construction sector activity is at PT. Beautiful Light. PT Cahya Indah is one of the companies in Indonesia engaged in construction. Where this company is engaged in the Rigid Pavement Road Preservation Project Tripe Lamongan Gresik. The road in this project has a long span of 16.5 km, located at stations 27 + 440 - 35 + 100 KM located on Jalan Raya Babat - Lamongan - Gresik, East Java. This study uses the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. HIRARC is a process of identifying hazards that can occur in both routine and non-routine activities, which is then carried out by an assessment process based on the identified hazards or risks to determine the high or low value of a risk so as to assist in the control process. In its preparation, HIRARC is divided into 3 stages including: hazard identification, risk assessment, and risk control
STRATEGI MANAJEMEN REVENUE GUNA UNTUK MENINGKATKAN PENDAPATAN DI FIFTEENTH CAFÉ SURABAYA Baskoro, Farhan Maulana; Herlina, Herlina
Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i2.101

Abstract

The decline in the number of visitors is caused by the emergence of many competitors and business places today which make business owners worry that their business will fade away until they eventually go bankrupt. One of the factors causing a decrease in revenue at Fifteenth Café is the large number of empty seats during the cold hours. On the other hand, when it's hot, it's difficult for customers to get a seat. This requires a strategy to increase cafe revenue. Revenue management is a method used to sell the right inventory to the right customers at the right time at the right price. Revenue Management is carried out using 5-steps where in this study it was only carried out up to the third step, namely establishing a baseline, analyzing problems, and creating a revenue management strategy. The problems experienced by Fifteenth Cafe were caused by reservation policies, difficulty attracting visitors, inefficient table-chair composition, and delays in the service system process. From these problems, several strategic recommendations were obtained, such as hold tables on reservation policies, changes in table-chair composition and service process improvements
RANCANG BANGUN SAFETY GUARDING TABLE SAW MACHINE GUNA MENINGKATKAN PRODUKTIFITAS PADA PT. BENTENG API TECHNIC Achmad Rizal Triandiko
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.102

Abstract

Safety Guarding is a machine protective equipment that aims to minimize potential hazards contained in Table saw Machine. By reducing potential hazards that can eliminate operator working hours due to work accidents that result in reducing productivity in the Brick Form Department, PT. Technic Fire Fortress. By designing Safety Guarding, it is expected to overcome existing problems, by making direct observations and collecting statistical data on work accidents at PT. Benteng Api Technic as a support for research, conducting concept screening, specification identification, specification determination, prototype trials, and evaluating the results of the application of safety guarding table saw machines to get the expected results.There were 13 cases of work accidents in 2022 at PT. The Technic Fire Fortress due to lack of security on the machines was at risk, resulting in as much as 20 days of total lost work time. The operation  of the Table Saw Machine was diverted to the use of Jigsaw as a woodcutting tool as an effort to reduce the number of work accidents, but the productivity of the Brick Form Department also decreased. With the implementation of safety guarding, namely to restore the original activity on the Table Saw Machine and increase productivity at PT. The previously declining Technic Fire Fortress. So that from this research an effective machine protection concept was produced to dispel unauthorized cases that cause work accidents, dispel material exposure from cutting activities, without reducing the performance of  the Table Saw Machine, increase  user safety and increase the company's reputation

Page 9 of 17 | Total Record : 162