cover
Contact Name
Asep Rahmatullah
Contact Email
admin@lppmbinabangsa.id
Phone
+628121950044
Journal Mail Official
admin@lppmbinabangsa.id
Editorial Address
S1 Teknik Industri Jl. Raya Serang – Jakarta KM.3 No.1B (Pakupatan) Kota Serang Provinsi Banten Telp. (0254) 220158; Fax. (0254) 220157
Location
Kota serang,
Banten
INDONESIA
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri
ISSN : 2798964X     EISSN : 27989658     DOI : https://doi.org/10.46306/tgc
Core Subject : Engineering,
Taguchi Adalah Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri terbit secara daring pada bulan Juni dan Desember. untuk menyebarluaskan hasil-hasil penelitian dalam bidang keilmuan Teknik dan Manajemen Industri sesuai dengan Body Knowledge pada Teknik industri.
Articles 162 Documents
ANALISIS INTERVAL PENGGANTIAN KOMPONEN KNIFE STEEL PADA MESIN CANE KNIFE TEBU DI PABRIK GULA GEMPOLKREP MOJOKERTO Rizky Pratama Putra; I Nyoman Lokajaya
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.70

Abstract

PT. Archipelago Sugar Synergy Sugar Factory Gempolkrep is a company engaged in the production of sugar. Located at Jalan Raya Gempolkrep, Suko Sewu, Kec. Gedek, Kabupaten Mojokerto, Jawa Timur. Sugar factory started operating in 1889 until now. Functionally, Sugar Factory’s work system is divided into two parts, Namely the production process which is carried out every six months and lasts for four until six months. While the remaining six months are used for machine preparation, maintenance and total replacement (Overhaul) on the machine for the next production process. Problems often occur during the milling season, especially in the station area Diffuser. In the subject matter the machine under study is machinery Cane Knife Sugarcane. This is due to the repair or replacement of blades due to damage to the machine causing the production process to stop. When the machine suddenly breaks down during the production process, so that costs in the form of losses due to lost production opportunities can increase. The heavier and more broken blade, the replacement process will take longer. Replacing it too often disrupts the production process and maintenance costs are high. By using the program method Age Replacement expected to provide information about the time to replace the knife on the machine Cane Knife Sugarcane which aims to avoid sudden damage during the milling process. And it is hoped that the company’s maintenance costs will not be high
ANALISIS KARAKTERISTIK DAN KEBUTUHAN PARKIR DI PASAR PABEAN SEDATI Fadel Ibrahim; Nurani Hartatik
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.71

Abstract

Parking is an important component in the needs of the transportation system so the need for parking spaces must be known before planning the construction of for example traditional markets. The market is one of the economic sectors that is a place to interact between sellers and buyers, one of which is the Sedati Customs Market. Parking spaces at the Sedati Customs market cannot accommodate vehicles during peak hours due to lack of parking space. This study aims to analyze parking characteristics, parking capacity, and parking space needs in the Sedati Customs market. Based on the results of research conducted from Monday, May 1, 2023 to Sunday, May 7, 2023, it was found that the maximum accumulation occurred on Saturday, May 6, 2023 at peak hours, namely 07.00 – 08.00 of 35 vehicles. The vehicle volume on the peak day, Saturday, May 6, 2023, reached 327 vehicles. The percentage of parking index from Monday, May 1, 2023 to Sunday, May 7, 2023 has exceeded 100%, indicating that parking capacity is not enough to accommodate incoming vehicles. The parking capacity owned by the Sedati Customs market is only 20 SRP while the required capacity is based on a maximum accumulation of 35 vehicles. Parking needs at the Sedati Customs market found that parking spaces require 15 more SRP in order to accommodate vehicles during peak hours
ANALISIS BIAYA OPERASIONAL ALAT BERAT PADA PEKERJAAN TIMBUNAN PROYEK PEMBANGUNAN HOTEL 57 NGANJUK Anugerah Islam Pribadi Santoso; Hanie Teki Tjendani
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.73

Abstract

The development of the world of construction in this era has resulted in the increasing use and need for heavy equipment in every construction job. In the field of civil engineering, heavy equipment is used to assist humans in carrying out the work of constructing building structures. Even heavy equipment currently seems to be a vital resource in construction projects (Febrianti, 2018). The purpose of using this heavy equipment is to make it easier for humans to do their work so that the expected results can be achieved more easily in a relatively short time. In the construction of the Guets House 57 Nganjuk hotel, it certainly requires heavy equipment to make work easier, the heavy equipment used for heaps and excavations, namely Excavators and Dump Trucks, so that you can find out the time needed and the costs incurred for these 2 types of heavy equipment, the authors discuss in chapter 4 with a description of the volume of excavation work, namely 1,996 m3 and for the volume of embankment work, namely 1,387.28 m3 using 2 types of heavy equipment Exavator and Dump Truck with Mini PC 75 type for Exavator and Hino index 8 for Dump Truck from the calculation results of two types of heavy equipment it is obtained that the time for piling work is 9 days for Excavators and 6 days for Dump Trucks, for excavation work it takes 17 days for Excavators and 11 days for Dump Trucks, and for a daily fee of Rp. 3,675,816 for Excavators and Rp. 5,041,416 for Dump Trucks
ANALISIS PENJADWALAN PREVENTIVE MAINTENANCE MESIN KNEADER PADA PROSES PRODUKSI RUBBER FENDER: Studi Kasus: PT. SEKAR WANGI GROUP, Sidoarjo Muhammad Riki; Hery Murnawan
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.74

Abstract

PT. Sekar Wangi Groub is a manufacturing company engaged in the production of rubber products. PT. Sekar Wangi Groub is located on Jl. Ketapang - Suko No.34, Suko Hamlet, Sidoarjo Regency, East Java. Products produced by PT. Sekar Wangi Group is Rubber Fender, Elastomeric bearing pad and Rubber Roll. Activities in the company all use machine tools that operate non-stop during working hours, this is able to make the machine experience a decrease in performance, so that at certain time it will make the machine experience trobel. Therefore, efforts to avoid machine trobel or breakdown can be done by scheduling machine maintenance, routine maintenance on the machine can be done by applying the use of the Preventive maintenance method to make the engine life longer and avoid downtime, with regular maintenance and maintenance on the machine, it is expected to increase production and avoid breakdown in the machine. The result obtained is that the cost of machine maintenance using preventive maintenance results in a smaller total maintenance cost of Rp.7.100.000,- per year compared to the previous breakdown maintenance costs which reached Rp.12.070.741, - the total cost expenditure is smaller if implementing preventive maintenance so that this method is appropriately used by the company.
ANALISIS PRODUKTIVITAS PADA UD. PUJI MULYA Andrew Manuhutu; Zainal Arief
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.75

Abstract

UD. Puji Mulya” is a trading company engaged in the food sector, namely crackers that do not leave the taste of onions. This business was founded on November 17, 1998 by Mr. Sukandar. Prior to establishing this business, Mr. Sukandar worked in the same field. With his hard work, he founded this business with his wife. UD. Puji Mulya is located in the middle of the city crowd, precisely on Jl Medokan Semampir AWS 2 No 23 Kota Surabaya, East Java. In the beginning, this business was initiated by Mr. Sukandar, who wanted to start a business based on the experience he had gained. Armed with the skills and experience he gained from participating in the same business, he was able and succeeded in attracting market share so he could have employees. Initially, this business only had 3 production employees and 7 resellers. But with the passage of time, this cracker business is growing and has many employees. For the production process itself there are 5 employees, while for resellers as many as 20 people. The Marvin E. Mundel method has a different model from other productivity calculation models, namely the use of index numbers. An index number is a number or figures that can statistically indicate a change or difference in the price of one or several types of certain goods. Basically, an index number is a quantity that shows variations in changes in time or space regarding a particular matter. The use of this method is also to look for calculations of labor productivity, energy costs, other costs, raw material costs, machine costs. Capital, depreciation, fixed costs. For the calculation results can be formulated as follows. Labor Productivity Rp. 969,246, Energy Rp. 627,000, Other Expenses Rp. 1,159,247, Raw Material Rp. 448,600, Capital Rp. 447.198. Machine Rp. 14,336, Depreciation Rp. 9,746, Fixed Costs Rp. 79,109.
MEMINIMALKAN KECECACATAN HAK SEPATU PADA PROSES PRODUKSI GUNA MENINGKATKAN KUALITAS PRODUK di PT. ANGKADA RAYA Mukhammad Misbakh Saffana; Siti Mundari
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.76

Abstract

PT Angkada Raya is engaged in the shoe heel manufacturing industry, experiencing a decline in production due to defective products. By using the seven tools, product quality is analyzed, and factors that cause defects are identified. The company has a low level of quality control, with a defect percentage of 3.63%. Factors such as workers, work methods, environment, and machines contribute to these defects. To minimize the number of defects, standardization is carried out, improving production methods, improving the work environment. After this implementation, the percentage of defects decreased to 1.96%. PT Angkada Raya is committed to continuously improving product quality through effective quality control
PERBANDINGAN KINERJA DAN EFISIENSI STRUKTUR PENAHAN GEMPA SRPM DAN SISTEM GANDA SRPM DENGAN DINDING GESER (SHEAR WALL) DENGAN METODE PUSHOVER Muhammad Affan Ghaffar; Bantot Sutriono; Masca Indra Triana
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.77

Abstract

In planning a building structure the main aspects that must be considered are strength and efficiency, which in designing the structure must be designed as efficient as possible but its strength is guaranteed. To design reinforced concrete building structures, it is regulated in SNI-2847-2019. Because Indonesia is a country with high seismic activity, in planning high-rise building structures, it must also be designed to be earthquake-resistant according to SNI-1726-2019 regulations. In this study a comparison of the SRPM earthquake retaining structure and the SRPM Dual System with shear wall will be carried out to determine the comparison of performance and efficiency. The results of the analysis in this study show that the maximum drift story value of the SRPM structure in the X direction is 55.655 and the Y direction is 61.171, while for the Dual System structure the X direction is 42.191 and the Y direction is 44.495. The results of the structure performance level analysis with using the pushover analysis method based on REMA 440 of the SRPM and Dual System structures can be categorized under IO conditions (Immadiate Occupancy). For efficiency comparison result the SRPM structure has a reinforcement weight of 263,729.72 kg and a concrete volume of 1643.4 m3, while the Double Site structure has a reinforcement weight of 214,731.38 kg and a concrete volume of 1300.6 m3.
ANALISIS PERENCANAAN BAHAN BAKU TRIPLEK DAN PENERAPAN ENTERPRISE RESOURCE PLANNING (ERP) DI INDUSTRI FURNITURE Dian Fahma Suryani; Hery Murnawan
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.78

Abstract

Enterprise Resource Planning (ERP). Enterprise Resource Planning (ERP) is a sophisticated database system. Manufacturing companies have a production process, the production process is a process where raw materials are converted into finished products or have added value. Before carrying out the production process, it is necessary to determine raw material planning using the Material Requirement Planning (MRP) method. Material Requirement Planning (MRP) is a method required for production planning or procurement of components to meet the master production schedule (JIP). In the production process, especially in the procurement of raw materials, there are problems, namely the process of calculating the number of raw materials is only done by estimating the amount of production in advance and there is no calculation using this method and there is no ability within the company to control inventory so that the determination of the materials that will be needed is irregular. Therefore, researchers will determine the planning of raw material requirements for a certain period using the Material Requirement Planning (MRP) method. Then integration with the company's ERP system is one way to solve the problem so that it can help companies improve business process performance. Implementation of ERP applications in business processes is expected to improve business performance such as reducing excessively high lead times, improving customer service performance, eliminating required stages and others
OPTIMASI KETERSEDIAAN DAN KEBUTUHAN AIR IRIGASI DI DAERAH IRIGASI KETANDAN KABUPATEN KEDIRI MENGGUNAKAN PROGRAM LINIER Erfan Ferdiansyah; Faradlillah Saves
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.79

Abstract

Water is a very important component to support the needs of living things throughout the world. Deficiency or excess of water requires an appropriate and efficient handling of water allocation management, in an effort to ensure the availability of irrigation water, especially for agriculture. This research aims to analyze the existing irrigation water needs in the Ketandan irrigation area, then look for several alternatives to determine effective and efficient cropping patterns and planting schedules, as well as to maximize agricultural land so as to produce maximum profits. In addition, this study also calculates the need for irrigation water for each type of plant that is planned. The optimization method used in the calculations in this study is the linear method with the help of the QM for Windows 4 application. From the results of the calculations and discussion of the optimization of the help of the linear program, it can be seen that the existing water requirement in the Kebunan irrigation area is 17.79 l/s/ha, the pattern planting Palawija-Rice-Rice with early August I planting and yields for each type of plant planned in one season are alternative IV (Rice I: 3.47 l/s/ha), (Rice II: 8.64 l/s/ha), and (Palawija: 9.58 l/s/ha) is the result of the highest profit value of IDR 144,355,900,000 per year, with a planting area of 1,610 Ha
PENENTUAN WAKTU STANDAR GUNA MEMAKSIMALKAN KAPASITAS PRODUKSI PRODUK MEDIA TANAM Moh. Gunawan Pane; Handy Febri Satoto
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.80

Abstract

CV. Wira Jaya Nusantara is an agricultural product company. This company has employees in charge of producing planting media soil products. Planting media production employees at CV. Wira Jaya Nusantara has 10 employees with a total production of 135 planting media products per day. The planting media production workforce only has 4 workers, with a fairly large number of daily targets, workers experience quite a large workload due to quite a lot of production work on a scale. It is hoped that this research is the optimization of production based on working time. Data collection was carried out by means of the stopwatch time study method. The calculation results will be the beginning of determining the standard time of the planting media production process. Based on the analysis of working time, the standard time obtained by workers in the methane growing media production section is 29.47 minutes for mixing ingredients, 19.58 minutes for filling materials, 12.11 minutes for product sealers and product stickers is 5.58 minutes. While the npk planting media is 43.80 minutes for filling materials, 32.86 minutes for product sealers and product stickers is 15.12 minutes. Based on these calculations, production demand can be achieved with methane product conditions, mixing ingredients 2 regular time workers and 2 over time workers, filling materials 2 regular time workers and 1 over time worker, product sealer 1 regular time worker and 1 over time worker, and product stickers for 1 regular time worker. for NPK products, 1 regular time worker fills materials, 1 regular time worker product sealer and 1 regular time worker for product stickers

Page 7 of 17 | Total Record : 162