cover
Contact Name
Putu Aryastana
Contact Email
aryastanaputu@warmadewa.ac.id
Phone
+6281222788222
Journal Mail Official
paduraksa.sipil@gmail.com
Editorial Address
Jl. Terompong 24 Tanjung Bungkak Denpasar Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Paduraksa : Jurnal Teknik Sipil Universitas Warmadewa
Published by Universitas Warmadewa
Core Subject : Social, Engineering,
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 2303-2693 (Print ISSN), 2581-2939 (Electronic ISSN) is a journal of civil engineering provides a forum for publishing research articles or review articles which published by Warmadewa University Press jointly with Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa. This journal is also dedicated to provide an intellectual space of scholarly discussion how journal of civil engineering able to create the new global formation of civil engineering and similar issues. This journal has been distributed by Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa started from Volume 1 Number 1 Year 2012 for Print and Oline from Volume 3 Number 1 Year 2014 to present. This journal encompasses original research articles, review articles, and short communications, including: Civil Engineering; Water Resources; Construction Management; Transportation; Structure; Geotechnics; Environment; Others Engineering
Articles 1 Documents
Search results for , issue "114-120" : 1 Documents clear
IDENTIFIKASI FAKTOR-FAKTOR RISIKO PADA PROYEK INFRASTRUKTUR DASAR DAN FASILITAS UMUM PENUNJANG PARIWISATA DI PELABUHAN BENOA, BALI I Komang Agus Ariana; I Gusti Ngurah Putu Dharmayasa; I Nengah Riana; Nyoman Bayu Kurniawan Bendesa
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 114-120
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.1.6154.114-120

Abstract

In general, risks in construction projects can affect project objectives, namely affecting costs, quality and time. In a construction project, a risk factor is a possibility that causes a loss. This study was conducted to determine the dominant risk factors and risk mitigation that caused delays in the implementation of the basic infrastructure and tourism support public facilities project at Benoa Harbor. In this study, data was collected through a questionnaire which was then checked for validity, correlation and reliability using SPSS. Furthermore, to determine the dominant risk, the Severity Index method is used. Based on this research, there are 20 risk factors that cause project delays. The dominant risks based on the level of risk are unexpected events (natural disasters, fires) of 12%, changes in work that has been completed by 10%, environmental changes including changes in weather or climate. at project sites by 10%, repairs that are not in accordance with specifications by 8%, and limited authority of personnel/owners in making decisions by 8%. The dominant risks identified in the project really need to find solutions because they have a very significant impact on project performance.

Page 1 of 1 | Total Record : 1