cover
Contact Name
Putu Aryastana
Contact Email
aryastanaputu@warmadewa.ac.id
Phone
+6281222788222
Journal Mail Official
paduraksa.sipil@gmail.com
Editorial Address
Jl. Terompong 24 Tanjung Bungkak Denpasar Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Paduraksa : Jurnal Teknik Sipil Universitas Warmadewa
Published by Universitas Warmadewa
Core Subject : Social, Engineering,
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 2303-2693 (Print ISSN), 2581-2939 (Electronic ISSN) is a journal of civil engineering provides a forum for publishing research articles or review articles which published by Warmadewa University Press jointly with Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa. This journal is also dedicated to provide an intellectual space of scholarly discussion how journal of civil engineering able to create the new global formation of civil engineering and similar issues. This journal has been distributed by Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa started from Volume 1 Number 1 Year 2012 for Print and Oline from Volume 3 Number 1 Year 2014 to present. This journal encompasses original research articles, review articles, and short communications, including: Civil Engineering; Water Resources; Construction Management; Transportation; Structure; Geotechnics; Environment; Others Engineering
Articles 1 Documents
Search results for , issue "195-202" : 1 Documents clear
Analisis perbandingan biaya, waktu, dan dampak lingkungan pada pekerjaan lapis pondasi atas menggunakan material recycle dan cut and fill (studi kasus: proyek pembangunan jalur lintas selatan Tulungagung -Trenggalek) Fahmi Firdaus Alrizal; Diah Listyaningsih; Ihsan Galang Saputra
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 195-202
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.2.6698.195-202

Abstract

Nowadays, environmental issues in construction project activities that were previously ignored have become major problems as they trigger global warming. Consequently, green construction as a concept of sustainable development has begun to be implemented. It is sort of an effort to minimize the impact of damage to the environment. The construction project of the Tulungagung-Trenggalek southern route carried out material recycling from construction waste to top foundation layer material. The material processing will have an impact on the construction implementation. Therefore, it is necessary to have a study on a comparative analysis of costs, time, and environmental impacts on the work of the top layer using recycled materials and the cut-and-fill method. After using recycled materials, the cost was IDR 2,637,312,551.00, while the cut-and-fill method cost was IDR 2,535,283,401.00. The recycling method took 20 days, whereas the cut-and-fill method took 37 days. Material waste reached 5729.27 tons by the recycle method and 46586.82 tons by the cut-and-fill method. The recycling method caused emissions of 52774.4 kgCO2/liter, while the cut-and-fill method brought in 59935.34 kgCO2/liter. In conclusion, the recycling method can be categorized as a green construction method because it produces fewer emissions and waste than the cut-and-fill method. The recycling method can reduce the impact of environmental damage.