cover
Contact Name
Putu Aryastana
Contact Email
aryastanaputu@warmadewa.ac.id
Phone
+6281222788222
Journal Mail Official
paduraksa.sipil@gmail.com
Editorial Address
Jl. Terompong 24 Tanjung Bungkak Denpasar Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Paduraksa : Jurnal Teknik Sipil Universitas Warmadewa
Published by Universitas Warmadewa
Core Subject : Social, Engineering,
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 2303-2693 (Print ISSN), 2581-2939 (Electronic ISSN) is a journal of civil engineering provides a forum for publishing research articles or review articles which published by Warmadewa University Press jointly with Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa. This journal is also dedicated to provide an intellectual space of scholarly discussion how journal of civil engineering able to create the new global formation of civil engineering and similar issues. This journal has been distributed by Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa started from Volume 1 Number 1 Year 2012 for Print and Oline from Volume 3 Number 1 Year 2014 to present. This journal encompasses original research articles, review articles, and short communications, including: Civil Engineering; Water Resources; Construction Management; Transportation; Structure; Geotechnics; Environment; Others Engineering
Articles 1 Documents
Search results for , issue "142-151" : 1 Documents clear
Implementasi BIM dengan Autodesk Revit 2025 pada quantity take-off material struktur Gedung Plaza Airlangga (Unair) tahap 1 terhadap volume Dwi Nur Wahyudi; Masca Indra Triana
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 142-151
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.14.1.12449.142-151

Abstract

Rapid development in the construction sector is strongly influenced by its crucial and efficient functions. This drives the construction industry towards better integration. Currently, advances in technology and communication play an important role in overcoming various challenges, one of which is through the implementation of Building Information Modeling (BIM). This approach supports more integrated design and construction processes, resulting in higher efficiency. A primary challenge in construction service provision is the discrepancy in work volume, which can affect project success. By using Autodesk Revit 2025, the implementation of 5D BIM for material Quantity Take-Off can provide higher accuracy in volume estimation. In its implementation, data is processed using Autodesk Revit 2025 BIM software integrated with Microsoft Excel for further analysis. The results show that total volume calculations using Autodesk Revit are more precise compared to conventional methods. The volume of concrete work based on BIM is 2,005.35 m³, which is 83.31 m³ lower than the conventional method at 2,088.66 m³. Meanwhile, the reinforcement volume based on BIM is 354,670.98 kg, which is 29,024.91 kg lower than the conventional method at 383,695.89 kg. The contribution of this research is the demonstration that the implementation of 5D BIM using Autodesk Revit 2025 significantly improves the accuracy of structural work volume calculations compared to conventional methods, thereby helping to reduce volume discrepancies in construction projects and enhancing the reliability of material quantity planning.

Page 1 of 1 | Total Record : 1