cover
Contact Name
Putu Aryastana
Contact Email
aryastanaputu@warmadewa.ac.id
Phone
+6281222788222
Journal Mail Official
paduraksa.sipil@gmail.com
Editorial Address
Jl. Terompong 24 Tanjung Bungkak Denpasar Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Paduraksa : Jurnal Teknik Sipil Universitas Warmadewa
Published by Universitas Warmadewa
Core Subject : Social, Engineering,
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 2303-2693 (Print ISSN), 2581-2939 (Electronic ISSN) is a journal of civil engineering provides a forum for publishing research articles or review articles which published by Warmadewa University Press jointly with Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa. This journal is also dedicated to provide an intellectual space of scholarly discussion how journal of civil engineering able to create the new global formation of civil engineering and similar issues. This journal has been distributed by Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa started from Volume 1 Number 1 Year 2012 for Print and Oline from Volume 3 Number 1 Year 2014 to present. This journal encompasses original research articles, review articles, and short communications, including: Civil Engineering; Water Resources; Construction Management; Transportation; Structure; Geotechnics; Environment; Others Engineering
Articles 1 Documents
Search results for , issue "260-273" : 1 Documents clear
Analisa risiko pembangunan dermaga untuk pembangkit listrik terapung (Barge Mounted Power Plant/BMPP) di Kolaka, Sulawesi Tenggara Esbe, Yani; Citra Budi, Savitri; Prihaswan, Irawadi
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 260-273
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.14.2.13019.260-273

Abstract

Electricity utilization in the provinces of South Sulawesi, Southeast and West Sulawesi is rapidly growing at a high rate. In Southeast Sulawesi Province, between the years of 2020 and 2024, it significantly grew by 12.66% per year. To meet with this high demand, for such a reason, PT Perusahaan Listrik Negara Indonesia Power/Electricity State Owned Company Info (PLN) ordered Nusantara II Barge Mounted Power Plant (BMPP) to PT PAL Surabaya and built a new jetty to mount the 60 MW plant in Wolo, Kolaka, Southeast Sulawesi. It is important to conduct risk management to ensure the success of the project by identifying and mitigating impact the risks that could be an obstacle smoothing delivery of the BMPP and the construction of its mounting dock. This study aims to analyze and manage risks for the construction of the BMPP Jetty. A risk analysis of the project was made to oversee what risks could interfere during the procurement stage, delivery the plant, implementation/construction stage up to the completion of the project. The research in this paper uses a descriptive qualitative approach and survey to examine the consequences of risks collected based on purposive sampling from Users, Contractors, Project Owners, and Project workers. The identified risks are then calculated and mitigated as necessary to control them. There were 47 risks identified, and after thorough analysis using the HIRADC method, 17 (36%) risks were low, 29 (62%) risks were moderate and 1 (2%) risk was high risk, which was related to the delivery of the BMPP itself. This research can help users, project owners, or other stakeholders in identifying, understanding, and responding to risks more effectively so that projects can be completed on time, without work accidents, but good quality, and within the planned budget. Good risk control and mitigation have made the project completed on time without accidents, delays, and with good quality delivered. The pattern of project implementation and management are be able to serve as reference to similar project in the future.

Page 1 of 1 | Total Record : 1