cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 343 Documents
Hal Muka JPEN 2017 Volume 19 Nomor 1 Juni Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 19, No 1 (2017): Juni 2017
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2017.19.1.3587

Abstract

OPTIMALISASI PENYALURAN DAYA PLTN DI PULAU BANGKA UNTUK SISTEM KELISTRIKAN SUMATERA Citra Candranurani; Iwa Garniwa
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.1471

Abstract

ABSTRAKANALISA PENYALURAN DAYA PLTN DI PULAU BANGKA UNTUK SISTEM KELISTRIKAN SUMATERA. Target bauran energi yang tertuang dalam perpres No. 5 Tahun 2006 mentargetkan sebesar 2 % dari total kebutuhan energi nasional di tahun 2025 akan bersumber dari energi nuklir. Badan Tenaga Nuklir Nasional (BATAN) selaku promotor untuk persiapan pembangunan Pembangkit Listrik Tenaga Nuklir (PLTN) telah membuat roadmap jangka panjang, dimana pada tahun 2024 di rencanakan PLTN dari pulau Bangka sudah masuk ke dalam sistem kelistrikan Sumatera. Untuk menunjang hal tersebut maka dilakukan persiapan perencanaan sistem dan jaringan di Sumatera. Perencanaan ini dibuat dengan bantuan perangkat lunak Electrical Transient Analyzer Program (ETAP). Asumsi pada penelitian ini ada tiga, yaitu pertumbuhan beban sebesar 10,2% pertahun hingga tahun 2024, penambahan PLTN dengan kapasitas 2x1000 MW di pulau Bangka, serta pembuatan sistem dan jaringan transmisi untuk penyaluran daya PLTN pada sistem interkoneksi Sumatera. Dari hasil penelitian diperoleh optimalisasi penyaluran daya PLTN pada sistem Sumatera yang terbaik adalah melalui sub sistem Sumatera Utara yaitu melalui IBT Seirotan atau Paya geli. Nilai losses keseluruhan sistem pada penyaluran ini adalah 157 MW atau 1,646 %. Penyaluran daya PLTN pada IBT ini memberikan perbaikan kondisi tegangan IBT yang terbaik yaitu sejumlah 43,4%.Kata kunci: optimalisasi, losses, sistem tenaga listrik, PLTN ABSTRACTANALYSIS OF NPP POWER DISTRIBUTION IN BANGKA ISLAND FOR ELECTRICITY SYSTEM OF SUMATERA. Energy diffusion target on the regulation No. 5, 2006, says that 2 % of total national energy need is come from nuclear energy. National Nuclear Energy Agency (BATAN) as the promoter of the development Nuclear Power Plant(NPP), has made a long term roadmap, whereas in the year of 2024, Nuclear Power Plant from Bangka Island will be injected to the Sumatera interconnection system. For the system and transmission planning preparation, the simulation has been made with Electrical Transient Analyzer Program (ETAP) Software. The are three assumption in this research, 10,2 % annual load growth until 2024, enhancement of NPP with 2 x 1000 MW capacity at Bangka island, and improvement of the system and transmission line to deliver the power from NPP to Sumatera interconection system. The research result gives that the optimum power distribution by north sumatera sub system through IBT Seirotan or Paya Geli. Total losses whole systemof this distribution is 157 MW or 1,646%, and improvement total IBT condition voltage as many as 43,4 %.Keywords: optimization, losses, electrical power system, nuclear power plant
PERBANDINGAN HARGA ENERGI DARI SUMBER ENERGI BARU TERBARUKAN DAN FOSIL Edwaren Liun; Sunardi Sunardi
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.2521

Abstract

ABSTRAK PERBANDINGAN HARGA ENERGI DARI SUMBER ENERGI BARU TERBARUKAN DAN FOSIL. Transportasi biaya rendah untuk orang dan barang sangat penting untuk kesejahteraan ekonomi bangsa. Hingga kini jika harga minyak naik, biaya transportasi otomatis akan mengikuti dan sebagian rakyat menderita akibat melambungnya harga makanan dan barang-barang lainnya. Hampir 100 persen kebutuhan energi transportasi negara Indonesia didukung oleh minyak. Sementara biaya di sektor energi terutama listrik, di negara maju yang juga berperan signifikan untuk mendukung transportasi, jauh lebih stabil dan dapat diprediksi. Kebutuhan energi yang begitu tinggi di sektor transportasi cenderung memaksa manusia untuk mengupayakan sumber dan sarana energi dalam bentuk  lain seperti listrik atau hydrogen yang dapat menyamai atau melebihi kinerja bahan bakar minyak. Makalah ini bertujuan untuk menganalisis perbandingan keekonomian harga energi dari sumber EBT dan fosil untuk melihat sejauh mana peluang keekonomian beberapa jenis energi dapat memainkan peran signifikan di sektor transportasi dan dampak selanjutnya di dalam sistem energi. Metodologi yang digunakan adalah penelusuran pustaka dan perhitungan langsung pada bahan atau sumber energi terkait. Dari hasil analisis diperoleh bahwa akan semakin dibutuhkan peran energi nuklir dan energi tertentu lainnya sebagai sumber energi listrik menimbang aspek keekonomiannya yang relatif lebih baik. Kata kunci: perbandingan, harga energi, bahan bakar, transportasi   ABSTRACT ENERGY PRICE COMPARISON OF NEW, RENEWABLE AND FOSSIL ENERGY SOURCES. Low cost transportation for people and goods is essential to the economic well-being of the nation. Until now, if the oil prices rise, the cost of transportation will automatically follow and most of the people suffering due to soaring prices of food and other items. Almost 100 percent of Indonesian transportation energy demand is supported by oil. Supply disruption - or even the threat of disruption - in the Middle East or elsewhere may lead to a shift in consumer prices and the cost of the industry in significant numbers. While costs in the energy sector, especially electricity in developed countries that also contribute significantly to support the transport sector, is much more stable and predictable. Energy requirements are so high in the transport sector tends to force people to seek the source and means of energy in other forms such as electricity or hydrogen that can match or exceed the performance of fuel oil. This paper aims to analyze the economics of energy price comparison to see the extent of the economic opportunities some kind of energy to play a significant role in the transport sector and the subsequent impact on the energy system. From the results obtained by the analysis that will be increasingly necessary role of nuclear energy and other specific energy as a source of electrical energy considering its economical aspects are relatively better. Keywords: comparison, price of energy, fuel, transportation
Analisis Morfotektonik dan Pemetaan Geologi pada Identifikasi Sesar Permukaan di daerah Plampang, Pulau Ngali dan Pulau Rakit, Provinsi Nusa Tenggara Barat Supartoyo Supartoyo
Jurnal Pengembangan Energi Nuklir Vol 21, No 1 (2019): Juni 2019
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2019.21.1.5461

Abstract

Kebutuhan listrik di Indonesia semakin meningkat terutama di Indonesia bagian tengah dan timur, maka diperlukan pembangkit listrik untuk memasok kebutuhan tersebut, dan wacananya adalah Pembangkit Listrik Tenaga Nuklir (PLTN). Provinsi Nusa Tenggara Barat (NTB) merupakan salah satu kawasan strategis yang memerlukan listrik terutama untuk industri pariwisata, namun demikian, daerah NTB rawan terhadap bahaya gempabumi, yaitu guncangan dan bahaya ikutan, seperti retakan tanah, likuifaksi dan gerakan tanah atau longsor. Sesar permukaan yang termasuk sesar aktif adalah salah satu jenis bahaya gempabumi yang harus dihindari. Penyelidikan ini bertujuan untuk mengidentifikasi adanya sesar permukaan di daerah NTB, yaitu di Plampang, Pulau Ngali, Pulau Rakit. Metodologi yang digunakan meliputi pengamatan morfologi, morfotektonik, singkapan batuan, dan unsur-unsur pensesaran permukaan, dan pemetaan geologi. Hasil penyelidikan menunjukkan tidak terindikasi adanya sesar permukaan di daerah Plampang, Pulau Ngali, Pulau Rakit, namun hanya didapatkan beberapa kelurusan dan kekar dan indikasi sesar minor saja. Berdasarkan hasil analisis dapat disimpulkan bahwa tidak ditemukan adanya pensesaran permukaan di NTB khususnya di daerah Plampang, Pulau Ngali, dan Pulau Rakit.
SURVEI POTENSI PARTISIPASI MASYARAKAT TERHADAP RENCANA PEMBANGUNAN PLTN MURIA Yarianto Sugeng Budi Susilo; Sri Hariani Sjarief; Heni Susiati; Imam Hamzah; Fepriadi Fepriadi
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1919

Abstract

ABSTRAK SURVEI POTENSI PARTISIPASI MASYARAKAT TERHADAP RENCANA PEMBANGUNAN PLTN MURIA. Salah satu kelayakan program pembangunan PLTN adalah kelayakan sosial budaya. Semakin terbukanya masyarakat dalam kerangka negara demokrasi telah membawa perubahan dalam paradigma pembangunan. Masyarakat menjadi bagian penting dalam pengambilan keputusan setiap proyek di daerahnya. Bahkan faktor sosial-budaya seperti “social riot dapat menjadi "exclusion factor" seperti yang terjadi pada PT Inti Indorayon beberapa tahun yang lalu. Oleh karena itu faktor sosial budaya harus mendapat pertimbangan yang matang dalam perencanaan pembangunan PLTN. Salah satunya adalah membuat peta potensi partisipasi masyarakat terhadap rencana pembangunan PLTN. Metode penelitian yang digunakan adalah pendekatan kuantitatif dengan melakukan survei yang dipandu dengan kuesioner, tanpa memberi perlakuan apapun pada obyek yang diteliti (ekspose fakto). Selain itu juga dilakukan pendekatan kualitatif dengan uindepth interview untuk menggali informasi secara mendalam. Sampel yang diambil adalah masyarakat umum di sekitar tapak PLTN, sampai radius 10 km. Teknik sampling yang digunakan adalah acak sempurna. Hasil survei menunjukkan bahwa sebagian besar masyarakat di sekitar tapak cukup berpotensi untuk berpartisipasi menghadapi pembangunan PLTN. Suasana yang cukup kondusif ini perlu dibina secara terus menerus agar tidak kehilangan momen, dengan melakukan social setting.   ABSTRACT SURVEY OF PUBLIC PARTICIPATION POTENTIAL REGARDING THE MURIA NPP PROGRAM. Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP) program. Indonesia is undergoing democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development. Even the socio-culture, such as social riot, can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study, mapping of public participation potential should be conducted by field survey. The method used in the research is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by indepth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost.
Hal Belakang JPEN 2015 Volume 17 Nomor 2 Desember Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 17, No 2 (2015): Desember 2015
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2015.17.2.3235

Abstract

INVENTARISASI TAPAK POTENSIAL PLTN DI WILAYAH PROPINSI BANTEN Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1959

Abstract

ABSTRAK WILAYAH BARAT DAN UTARA BANTEN MERUPAKAN LOKASI STRATEGIS UNTUK PENGEMBANGAN KAWASAN INDUSTRI. Perkembangan industri perlu diikuti peningkatan pasokan listrik nasional yang semakin krisis di masa mendatang, sehingga dipertimbangkan energi alternatif seperti Pembangkit Listrik Tenaga Nuklir (PLTN) menjadi pilihan terbaik guna memenuhi pasokan iistrik. Untuk mencari lokasi potensial akan dianalisis berdasarkan 6 parameter aspek penelitian melalui persiapan, perencanaan, penelitian, dan pemantauan sesuai Safety Standard Series IAEA, NS-R-3 (2003) tentang siting dan evaluasi tapak. Tujuan survei pendahuluan ini adalah melakukan inventarisasi lokasi, dalam rangka memperoleh data calon tapak di wilayah Banten. Metode yang digunakan adalah pengumpulan data, pemeringkatan, dan konfirmasi lapangan terhadap aspek kegunungapian, patahan permukaan, kecocokan pondasi, kegempaan, kepadatan penduduk, dan tsunami. Ke enam aspek tersebut dengan mempertimbangkan faktor external events. Hasil analisis survei menunjukan bahwa tapak potensial PLTN di Propinsi Banten adalah daerah Tanjung Pasir (Muara Balong), Tanjung Kait, dan Tanjung Pontang. Kata kunci: Lokasi strategis, tapak potensial, siting, pemeringkatan, external events.   ABSTRACT BANTEN REGION FOR WEST AND NORTH IS STRATEGIC LOCATION FOR THE DEVELOPMENT OF INDUSTRIAL AREA. The Growing of industry need the make-up of national electrics addition which progressively period to crisis in the future, so that it was considered by alternative energy like Power Station Of Nuclear Energy (NPPs) is best choice to fulfill electrics. It will be analyzed to looking for potential site about 6 parameters recording preparing, planing, and observating based on There by prepare of planology in the strategic area require to be done. To determine potential site need preparation, planning, research, and monitoring relating at Safety Standard Series IAEA, NS-R-3 (2003). Based on consideration of safety factor, feasibility factor, and refuse factor, it will obtain the best site. Investigation survey of location is to get candidate site, and to collect data in the Banten region to identificate of potential site of safety aspect, according to national/international standard. Method survey is used the leveling, consideration with data collecting, and field confirmation. Election of this special potential site consider by external factor events. The resulting of survey have been analysed and conclude potential site is Tanjung Pasir (Muara Balong), Tanjung Kait, and Tanjung Pontang. Keywords: Strategy site. Potential site, siting, Ranking, external events.
Hal Muka JPEN 2012 Volume 14 No 1 Juni Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 14, No 1 (2012): Juni 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.1.3419

Abstract

STUDI OPSI DAUR BAHAN BAKAR NUKLIR BERBASIS REAKTOR PWR DAN CANDU Djati Hoesen Salimy; Ida Nuryatin Finahari
Jurnal Pengembangan Energi Nuklir Vol 11, No 1 (2009): Juni 2009
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2009.11.1.1429

Abstract

ABSTRAKSTUDI OPSI DAUR BAHAN BAKAR NUKLIR BERBASIS REAKTOR PWR DAN CANDU. Telah dilakukan studi opsi daur bahan nuklir berbasis reaktor PWR dan CANDU. Ada 5 jenis opsi daur berbasis PWR dan CANDU, yaitu: opsi PWR-OT, PWR-MOX, CANDU-OT, DUPIC, dan PWR-CANDU-OT. Sedang parameter yang ditinjau dalam studi ini adalah kebutuhan bahan bakar, volume limbah dan total plutonium yang dihasilkan. Dari hasil studi diperoleh bahwa opsi DUPIC membutuhkan bahan bakar yang paling sedikit untuk membangkitkan listrik dalam jumlah yang sama. Untuk volume limbah, opsi PWR-MOX menghasilkan limbah yang paling sedikit, namun jumlah limbah level tinggi yang dihasilkan dua kali lebih banyak dibanding opsi DUPIC. Sedang untuk total plutonium, opsi PWR-MOX menghasilkan total plutonium yang paling sedikit, tetapi opsi DUPIC menghasilkan plutonium fisil yang paling sedikit. Dengan kata lain efektivitas pemanfaatan plutonium pada daur DUPIC lebih baik dibanding opsi yang lain.Kata Kunci: opsi daur, PWR, CANDU, DUPIC, plutonium, limbah ABSTRACTTHE STUDY OF NUCLEAR FUEL CYCLE OPTIONS BASED ON PWR AND CANDU REACTORS. The study of nuclear fuel cycle options based on PWR and CANDU type reactors have been carried out. There are 5 cycle options based on PWR and CANDU reactors, i.e.: PWR-OT, PWR-OT, PWR-MOX, CANDU-OT, DUPIC, and PWR-CANDU-OT options. While parameters which assessed in this study are fuel requirement, generating waste and plutonium from each cycle options. From the study found that the amount of fuel in the DUPIC option needs relatively small compared the other options. From the view of total radioactive waste generated from the cycles, PWR-MOX generate the smallest amount of waste, but produce twice of high level waste than DUPIC option. For total plutonium generated from the cycle, PWR-MOX option generates smallest quantity, but for fissile plutonium, DUPIC options produce the smallest one. It means that the DUPIC option has some benefits in plutonium consumption aspects.Keywords: cycle option, PWR, CANDU, DUPIC, plutonium, waste
PERAN MOX SEBAGAI BAHAN BAKAR NUKLIR DI MASA DEPAN Sriyana Sriyana; Suparman Suparman
Jurnal Pengembangan Energi Nuklir Vol 1, No 3 (1999): September 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.3.2003

Abstract

ABSTRAK PERAN MOX SEBAGAI BAHAN BAKAR NUKLIR DI MASA DEPAN. Berdasarkan studi estimasi pasokan bahan bakar nuklir, diperkirakan bahwa mulai tahun 2000 akan terjadi kesenjangan antara produksi dan permintaan uranium di dunia. Kekurangan ini akan berpengaruh terhadap pasokan bahan bakar nuklir untuk PLTN dan terhadap harga bahan bakar nuklir. Hal ini akan memberi peluang pada bahan-bakar MOX (Mixed OXide) untuk lebih banyak berperan. Kecenderungan ini terlihat dengan kenaikan pemanfaatan bahan bakar MOX sebagai substitusi bahan bakar uranium untuk reaktor air ringan (Light Water Reactor, LWR).   ABSTRACT THE ROLE OF MOX FOR NUCLEAR FUEL IN THE FUTURE. Based on nuclear fuel supply estimation study, it's predicted that starting in the year 2000 there will be a worldwide lack of uranium supply. The lack of supply will influence the nuclear fuel supply for Nuclear Power Plants and nuclear fuel costs. This will give opportunity to Mixed Oxide (MOX) fuel to have more important role. The trend is seen by the increasing usage of MOX as the substitute nuclear fuel in the Light Water Reactor (LWR).

Page 6 of 35 | Total Record : 343


Filter by Year

1999 2021


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue