cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 343 Documents
ANALISIS PERHITUNGAN KOEFISIEN REAKTIVITAS DOPPLER PARTIKEL TRISO REAKTOR TEMPERATUR TINGGI Zuhair Zuhair; Suwoto Suwoto; Ign. Djoko Irianto
Jurnal Pengembangan Energi Nuklir Vol 13, No 1 (2011): Juni 2011
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2011.13.1.1456

Abstract

ABSTRAKANALISIS PERHITUNGAN KOEFISIEN REAKTIVITAS DOPPLER PARTIKEL TRISO REAKTOR TEMPERATUR TINGGI. Salah satu aspek keselamatan melekat HTR didasarkan pada koefisien reaktivitas temperatur bahan bakar dan moderator yang negatif. Koefisien temperatur bahan bakar dikenal dengan sebutan koefisien reaktivitas Doppler. Makalah ini mendiskusikan perhitungan koefisien reaktivitas Doppler partikel TRISO dalam matriks grafit dengan program transport Monte Carlo MCNP5 dan pustaka tampang lintang energi kontinu ENDF/B-VII. Partikel TRISO dimodelkan dengan kisi BCC dimana kernel dan keempat lapisan coating disimulasikan secara eksplisit. Serangkaian perhitungan dikerjakan dengan fraksi packing TRISO yang berbeda dan temperatur kernel, TF, yang berbeda pula. Temperatur matriks grafit, TM, dijaga konstan pada 1200K. Hasil perhitungan memperlihatkan semakin tinggi temperatur bahan bakar, semakin rendah nilai kritikalitas (k) partikel TRISO. Dengan bertambahnya temperatur bahan bakar, reaktivitas partikel TRISO menurun untuk seluruh fraksi packing TRISO yang dipertimbangkan. Hasil perhitungan juga memperlihatkan koefisien reaktivitas Doppler menurun dengan naiknya temperatur bahan bakar dan meningkat dengan bertambahnya fraksi packing TRISO. Dapat disimpulkan bahwa, pemilihan fraksi packing TRISO dan temperatur operasi merupakan opsi penting dalam analisis desain keselamatan melekat reaktor temperatur tinggi.Kata kunci: koefisien reaktivitas Doppler, partikel TRISO, BCC, MCNP5, ENDF/B-VII ABSTRACTANALYSIS ON THE CALCULATION OF DOPPLER REACTIVITY COEFFISIENT FOR TRISO PARTICLE OF HIGH TEMPERATURE REACTOR. One of HTR inherent safety aspects is based on the negative fuel and moderator temperature reactivity coefficients. Fuel temperature coefficient is known as the Doppler reactivity coefficient. This paper discusses the calculation of the Doppler reactivity coefficient for TRISO particles in graphite matrix with MCNP5 Monte Carlo transport code and ENDF/B-VII continuous energy cross section library. TRISO particles are modeled as BCC lattice where the kernel and four coating layers are simulated explicitly. A series of calculations were done with different TRISO packing fraction and different temperature of the kernel, TF. Temperature graphite matrix, TM, is kept constant at 1200K. The calculation results show the higher the fuel temperature, the lower value of TRISO particles criticality (k). The increasing temperature of fuel, TRISO particle reactivity decreases for all considered TRISO packing fraction. The calculation results show also the Doppler reactivity coefficient decreases with rising of fuel temperature and increases with increasing of TRISO packing fraction. It can be concluded that the choice of TRISO packing fraction and operational temperature are important option in inherent safety design analysis of high temperature reactor.Keywords: Doppler reactivity coefficient, TRISO particle, BCC, MCNP5, ENDF/B-VI
PERHITUNGAN ONGKOS BAHAN BAKAR NUKLIR DAUR TERBUKA DAN TERTUTUP MENGGUNAKAN METODE LEGECOST Moch. Djoko Birmano
Jurnal Pengembangan Energi Nuklir Vol 4, No 1 (2002): Juni 2002
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2002.4.1.2039

Abstract

ABSTRAK PERHITUNGAN ONGKOS BAHAN BAKAR NUKLIR DAUR TERBUKA DAN TERTUTUP MENGGUNAKAN METODE LEGECOST. Disajikan hasil perhitungan ongkos bahan bakar nuklir daur terbuka dan tertutup untuk PLTN jenis LWR (Light Water Reactor) dengan daya netto 600 MWe. Perhitungan ini menggunakan metode LEGECOST (LEvelized GEneration COST) yang dikembangkan IAEA yang mempunyai ciri-ciri, yaitu uang dinyatakan dalam nilai tetap (tanpa inflasi), laju diskon (discount rate) disamakan dengan suku bunga pinjaman (interest rate) dan belum memperhitungkan pajak dan depresiasi. Sebagai kesimpulan adalah bahwa ongkos bahan bakar nukiir daur terbuka lebih menguntungkan karena lebih murah jika dibandingkan dengan ongkos bahan bakar nuklir daur tertutup. Hal ini disebabkan proses olah ulang untuk saat ini kurang menguntungkan karena belum ditemukan cara yang lebih efisien dan murah, disamping itu harga uranium segar masih murah. Pada masa mendatang ongkos bahan bakar daur tertutup akan lebih kompetitif terhadap ongkos bahan bakar daur terbuka apabila ditemukan teknologi proses olah-ulang yang semakin maju, efisien dan murah. Peningkatan penggunaan plutonium (Pu) untuk bahan bakar reaktor khususnya jenis MOX akan mampu menaikkan harga Pu yang akhimya akan menurunkan ongkos bahan bakar daur tertutup. ABSTRACT CALCULATION OF RECYCLE AND OPEN CYCLE NUCLEAR FUEL COST USING LEGECOST METHOD. To be presented the calculation of recycle and open cycle nuclear fuel cost for LWR type that have net power of 600 MWe. This calculation using LEGECOST method developed by IAEA which have characteristics, where i.e. money is stated in constant money (no inflation), discount rate is equalized with interest rate and not consider tax and depreciation. As a conclusion is that open cycle nuclear fuel cost more advantage because it is cheaper than recycle nuclear fuel cost. This is caused that at present, reprocessing process disadvantage because it has not found yet more efficient and cheaper method, besides price of fresh uranium is still cheap. In future, the cost of recycle nuclear fuel cycle will be more competitive towards the cost of open nuclear fuel cycle if is found technology of reprocessing process that more advance, efficient and cheap. Increase of Pu use for reactor fuel especially MOX type will rise Pu price that finally will decrease the cost of recycle nuclear fuel cycle.
Hal Muka JPEN 2018 Volume 20 Nomor 1 Juni JPEN JPEN
Jurnal Pengembangan Energi Nuklir Vol 20, No 1 (2018): Juni 2018
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2018.20.1.4522

Abstract

ANALISIS ALTERNATIF TIPE PONDASI DAN EKSKAVASI-DALAM PADA LOKASI CALON TAPAK PULAU PANJANG, SERANG Heri Syaeful; June Mellawati
Jurnal Pengembangan Energi Nuklir Vol 15, No 2 (2013): Desember 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.2.1499

Abstract

ABSTRAKANALISIS ALTERNATIF TIPE PONDASI DAN EKSKAVASI-DALAM PADA LOKASI CALON TAPAK PULAU PANJANG, SERANG. Pulau Panjang merupakan salah satu lokasi alternatif yang sedang dikaji sebagai calon tapak PLTN. Tanah permukaannya didominasi oleh endapan pasir dan cangkang hingga kedalaman belasan meter, selain itu juga perselingan pasir dan lempung hingga kedalaman sekitar 120 m. Tujuan penelitian adalah menganalisis alternatif tipe pondasi dan simulasi pembuatan ekskavasi-dalam pada saat konstruksi pondasi khususnya terkait aspek kestabilan lereng. Metode yang digunakan meliputi pengumpulan data hasil analisis laboratorium mekanika tanah/batuan, pengukuran kecepatan gelombang geser dengan metode PS logging, dan analisis alternatif tipe pondasi dan ekskavasi-dalam. Hasil analisis tipe pondasi yang dapat diterapkan pada calon tapak Pulau Panjang adalah kombinasi dari pondasi rakit dan pile. Batuan dengan Vs > 400 m/s pada kedalaman 44 m dapat dijadikan sebagai dasar konstruksi pondasi rakit. Di bagian bawahnya disambung dengan pondasi pile yang dikonstruksi sampai batuan dasar dikedalaman 120 m pada Vs > 900 m/s. Hasil analisis kestabilan lereng pada ekskavasi dalam dengan ketinggian lereng 44 m, sudut vertikal, pada kondisi normal menghasilkan nilai faktor keselamatan 0,184 dan pada kondisi beban gempa sebesar 0,138. Simulasi pemasangan angkur dengan spasi 1,25 m sebanyak 15 buah menghasilkan faktor keamanan di atas 1,0.Kata kunci: Pondasi PLTN, ekskavasi-dalam, kestabilan lereng ABSTRACTANALYSIS OF FOUNDATION TYPE ALTERNATIVE AND DEEP-EXCAVATION ON CANDIDATE SITE LOCATION OF PANJANG ISLAND, SERANG. Panjang Island is one of the alternatives location which is being studied as NPP site candidate. Its soil surface dominated by sand and eggshell deposit to the depth of tens of meter, beside that also the interlayer of sand and clay to the depth of 120 m. Purpose of the research is to analyze the alternative of foundation type and simulation of deep-excavation during foundation construction especially related to the slope stability aspect. The methods includes data collection of the analysis result of soil/rock mechanical laboratory, measurement of shear wave velocity by PS logging method, and analysis of alternative foundation type and deep-excavation. The analysis result of foundation type that can be applied on Panjang Island candidate site is combination of raft and pile foundation. Rock with Vs > 400 m/s in depth of 44 meter could be made as base of raft foundation construction. In the bottom it connected to pile foundation which is constructed to base rock in the depth of 120 m in Vs > 900 m/s. The result of slope stability analysis on deep-excavation with slope height of 44 m, vertical angle, on normal condition yield safety factor of 0,184 and on the condition of seismic load 0,138. Simulation of anchor installation with spacing 1,25 m as much as 15 pieces yield safety factor higher than 1,0.Keywords: NPP foundation, deep-excavation, slope stability
ANALISIS KELAYAKAN FINANSIAL PROYEK PLTN SMR DI INDONESIA DENGAN MEMPERTIMBANGKAN VARIABEL KETIDAKPASTIAN Nuryanti Nuryanti; Suparman Suparman; Mochamad Nasrullah; Elok S. Amitayani; Wiku Lulus Widodo
Jurnal Pengembangan Energi Nuklir Vol 17, No 2 (2015): Desember 2015
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2015.17.2.2609

Abstract

ABSTRAK ANALISIS KELAYAKAN FINANSIAL PROYEK PLTN SMR DI INDONESIA DENGAN MEMPERTIMBANGKAN VARIABEL KETIDAKPASTIAN. SMR merupakan salah satu alternatif mengatasi ketergantungan wilayah Luar Jawa Bali terhadap PLTD. Masalah yang sangat krusial dalam proyek PLTN (termasuk SMR) adalah finansial, terkait dengan sifat padat modal pada proyek ini. Selain itu, pada proyek PLTN SMR juga dimungkinkan terjadinya beberapa variabel ketidakpastian. Penelitian ini bertujuan untuk melakukan analisis kelayakan finansial proyek PLTN SMR dengan mengakomodasi kemungkinan terjadinya variabel ketidakpastian tersebut. Metodologi yang digunakan adalah analisis probabilistik yang dilakukan dengan teknik Monte Carlo. Teknik ini mensimulasikan keterkaitan antara variabel-variabel ketidakpastian dengan indikator kelayakan finansial proyek. Hasil penelitian menunjukkan bahwa pada pendekatan probabilistik proyek PLTN SMR dinilai layak pada “most probable value” harga jual listrik sebesar 15 cents/kWh, ditunjukkan dengan rata-rata NPV yang positif (US$ 135.324.004) dan rata-rata kedua nilai IRR yang lebih dari MARR (IRR proyek = 10,65%, IRR Equity = 14,29%, sementara MARR = 10%). Probabilitas ditolaknya proyek PLTN SMR adalah sekitar 20%. Tiga variabel utama yang paling berpengaruh dalam proyek adalah: harga jual listrik, biaya investasi dan tingkat inflasi. Kata kunci: kelayakan finansial, PLTN SMR, variabel ketidakpastian, NPV, IRR ABSTRACT FINANCIAL FEASIBILITY ANALYSIS ON SMALL MEDIUM REACTOR NUCLEAR POWER PLANT (SMR NPP) PROJECT IN INDONESIA UNDER UNCERTAINTY. NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accomadating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the "most probable value" of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65%, IRR Equity = 14.29%, while MARR = 10%). The probability of rejection of the SMR project was about 20%. The three main variables that are most influential in the project were: selling price of electricity, invesment cost and inflation rate. Keywords: financial feasibility, SMR  NPP, uncertainties, NPV, IRR
Sediment Thickness Estimation in Serpong Experimental Power Reactor Site Using HVSR Method Theo Alvin Ryanto; Eko Rudi Iswanto; Yuni Indrawati; Abimanyu BW Setiaji; Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 22, No 1 (2020): Juni 2020
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2020.22.1.5949

Abstract

A study about sediment thickness mapping was conducted in Serpong Experimental Power Reactor Site. This reactor is planned to be built in a high seismic activity area. Sediment thickness is one of many factors that could affect the site response. A high sediment deposit could amplify and prolong the earthquake waves. This condition could make the reactor building more vulnerable to seismic hazard. The sediment thickness was estimated using the microtremor HVSR method. The parameter used for sediment thickness calculation was obtained from the borehole and cross-hole seismic survey and was tested to ensure that the chosen parameter and the method were accurate. The deviation found in the borehole data was also calculated to determine the accuracy level of the calculation. The current planned location for the reactor is in a relatively low sediment deposit area with 8.8 m of thickness, however there is an area, west of the current location that might be a better location for the reactor based on the result of this study.
KAJIAN TEKNO-EKONOMI REAKTOR INOVATIF IRIS-350 Sahala Maruli Lumbanraja; Arum Puni Rijanti; Imam Bastori
Jurnal Pengembangan Energi Nuklir Vol 7, No 1 (2005): Juni 2005
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2005.7.1.1937

Abstract

ABSTRAK KAJIAN TEKNO-EKONOMI REAKTOR INOVATIF IRIS-350. Gangguan keamanan suplai listrik di Indonesia, khususnya sistem jaringan listrik Jawa-Madura-Bali harus diatasi secara bijak. Gangguan suplai listrik ini mungkin diakibatkan oleh kenaikkan harga bahan bakar hidrokarbon juga jumlah pembangkit listrik yang beroperasi masih sedikit. Masalah ini dapat mengakibatkan efek negatif pada sistem sosio-ekonomi nasional. PLTN merupakan salah satu opsi tepat untuk mendukung keamanan suplai listrik sampai saat ini. Beberapa studi mengenai studi kelayakan pengoperasian PLTN di Indonesia harus dilakukan. Studi tekno-ekonomi reaktor inovatif IRIS-350 bertujuan untuk mengkaji aspek teknologi dan ekonomi dari reaktor ini. IRIS-350 (International Reactor Innovative and Secure) merupakan reaktor modular berpendingin air ringan yang dikembangkan oieh konsorsium intemasionai yang dipimpin oleh Westinghouse. Reaktor ini didasarkan pada prinsip-prinsip operasi dan perbaikan yang sangat sederhana, keselamatan tinggi, mudah diinspeksi, waktu pembangunan relatif pendek, biaya investasi kecil, biaya pembangkitan sangat kompetitif, dan mudah disesuaikan dengan infrastruktur yang ada. Karakteristik utama IRIS adalah konsep reaktor integral, dimana semua komponen-komponen utama sistem pendingin reaktor berada di dalam bejana tekan. Reaktor IRIS-350 cukup menarik jika dioperasikan di Indonesia karena biaya investasi lebih kecil dibandingkan dengan jenis PLTN daya besar, tetapi porsi partisipasi nasional menjadi lebih kecil.   ABSTRACT THE TECHNO-ECONOMIC STUDY OF INNOVATIVE REACTOR IRIS-350. Disturbance of security of electricity supply in Indonesia, especially in Jawa-Madura-Bali grid system should be addressed wisely. The disturbance in electricity supply maybe resulted from the rise of hydrocarbon fuel prices as well as only a few of power plants in operation. This problem may impose negative effect to the national socio economic system. NPP may become one of viable options to support the security of electricity supply, and therefore. Some studies regarding the feasibility of NPP operation in Indonesia should be done. This study on techno-economic of an innovative reactor IRIS- 350 is aimed to access technical and economical aspects of the reactor. IRIS-350 (International Reactor Innovative and Secure) is an advanced light water cooled modular reactor being developed by an international consortium led by Westinghouse. This reactor is based on simplified operation & maintenance, enhanced safety, easy to inspect, short construction time, small investment cost, competitive generating cost, and easily suited to the infrastructures. IRIS main characteristic is integral reactor concept, being all the major reactor coolant system components located inside the pressure vessel. IRIS-350 reactor is very interesting if operated in Indonesia because investment cost less than the large NPP type, but the national participation is very small.
STUDI UNJUK KERJA SISTEM PROTEKSI PADA PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE APR 1400 Nafi Feridian; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 10, No 2 (2008): Desember 2008
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2008.10.2.1424

Abstract

ABSTRAKSTUDI UNJUK KERJA SISTEM PROTEKSI PADA PEMBANGKIT LISTRIK TENAGA NUKLIR TIPE APR 1400. Telah dilakukan studi sistem proteksi pembangkit (PPS) pada Pembangkit Listrik Tenaga Nuklir (PLTN) tipe Advanced Power Reactor (APR) 1400 yang merupakan salah satu sistem yang menjaga agar operasi PLTN APR 1400 tetap aman dan terkendali. Aspek pengendalian operasi PLTN merupakan aspek yang penting dalam menjamin beroperasinya PLTN dengan aman dan selamat. Untuk itu lingkup studi ini dibatasi pada unjuk kerja sistem PPS. Tujuan dilakukannya studi ini adalah untuk mengetahui kinerja PPS pada PLTN. Metodologi yang digunakan pada studi ini adalah studi literatur, pengumpulan data, serta melakukan review dan analisis. Studi ini menyimpulkan bahwa ada beberapa parameter pengukuran yang memicu sistem PPS untuk melakukan trip (pemadaman) reaktor, yaitu antara lain: tekanan pada komponen pressurizer terlalu tinggi atau terlalu rendah, volume air pada komponen pembangkit uap terlalu tinggi atau terlalu rendah, tekanan pada pengungkung reaktor terlalu tinggi, aliran pendingin reaktor yang rendah. Namun begitu trip juga bisa dilakukan secara manual. Beberapa parameter tersebut diukur oleh beberapa sensor yang disusun secara paralel dan ditetapkan dengan nilai nominal tertentu sesuai dengan standar PLTN tipe APR 1400.Kata kunci: Sistem Proteksi Pembangkit, APR 1400, sensor, penggerak batang kendali ABSTRACTNUCLEAR POWER PROTECTION SYSTEMS PERFORMANCE STUDY FOR APR 1400. A study on plant protection system (PPS) of advanced power reactor (APR) 1400 which is one of the system to maintain nuclear power plant (NPP) operation safe and controllable has been conducted. The controllability aspect of NPP operation is an important aspect to assure the NPP operation safe and reliable. Accordingly, the study is limited in the performance of PPS. The method used in the study includes literature study, data collection, as well as review and analysis. The purpose of this study is to recognize that PPS performance can assure the NPP operation safely and controllable. The study concludes that there are several measurement parameters that actuate PPS systems to trip the reactor such as high pressurizer pressure, low pressurizer pressure, high containment building pressure and also manual trip. These parameters are measured by parallel sensor with parallel arrangement set on set point suitable with APR 1400 safety standard.Keywords: Plant Protection System (PPS), APR 1400, sensor, control element drive mechanism
STUDI AWAL PLTN DI SUMATERA Edwaren Liun
Jurnal Pengembangan Energi Nuklir Vol 8, No 2 (2006): Desember 2006
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2006.8.2.1968

Abstract

ABSTRAK STUDI AWAL PLTN DI SUMATERA. Saat ini pertumbuhan permintaan kapasitas daya listrik di wilayah Sumatera sekitar 11.3% per tahun. Dengan kondisi sistem kelistrikan saat ini menyebabkan pemadaman listrik secara bergilir yang hampir teijadi setiap hari di seluruh wilayah. Penambahan kapasitas dengan pembangkit berskala kecil, pertumbuhan permintaan di wilayah ini sulit terpenuhi. Sedangkan fasilitas pembangkitan yang selama ini menggunakan bahan bakar minyak sudah tidak layak dioperasikan karena menimbulkan beban subsidi yang sangat tinggi. Dengan kondisi demikian di masa mendatang Pulau Sumatra membutuhkan kapasitas tambahan dalam unit-unit berskala besar yang peluang terbesar dimungkin dengan PLTN. Kata kunci: Kondisi kelistrikan Sumatera, defisit daya, PLTN di Sumatera.   ABSTRACT In this time demand growth of electricity generation capacities on Sumatra region is about 11.3% per year. That condition cause power off by have innings which almost happened every day in all region. Addition of capacities with small scale generating, the demand growth in this region is difficult to meet. While generating facilities which until now use oil fuel have is not feasible to operate because the generating cause very high subsidy burden. With that way condition of Sumatra Island additional demand of capacities in large scale units which is possible biggest opportunity by Nuclear Power Plants (NPP) in the next period. Keywords: Electricity condition of Sumatra, power deficit, NPP in Sumatra.
Hal Belakang JPEN 2013 Volume 15 Nomor 1 Juni Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.3429

Abstract

Page 4 of 35 | Total Record : 343


Filter by Year

1999 2021


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue