cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota samarinda,
Kalimantan timur
INDONESIA
KURVA S JURNAL MAHASISWA
ISSN : -     EISSN : -     DOI : -
Core Subject : Education,
Arjuna Subject : -
Articles 1,106 Documents
ANALISA KINERJA RUAS PADA JEMBATAN MAHKOTA II KOTA SAMARINDA BUDIANTO, ARIF SETYO
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (846.382 KB)

Abstract

he bridge is a construction structure that allows transportation routes through rivers, lakes, times, highways, railroads and others. As the population increases, the movement of transportation in the Mahkota II Bridge area increases and influences the segment performance and service level at the Mahkota II Bridge through the community to carry out daily activities to the destination through the Crown Bridge II section. The existence of the Mahkota II Bridge which is the connecting bridge of many activities to mobilize the movement of traffic flow must calculate the current capacity of the bridge to measure the performance and level of service for the Crown Bridge II section. Analysis carried out manually in accordance with the conditions of traffic flow in Indonesia. In this case an analysis was carried out using the 1997 Indonesian Road Capacity Manual (MKJI 1997) to take into account traffic performance. Traffic data obtained from a field survey conducted for 4 days is Monday, Wednesday, Saturday and Sunday, date (July 2, July 4, July 7 and July 8 2018) during rush hour which is presented in the form of a vehicle data table . Based on the results of the performance analysis on the Mahkota II Samarinda bridge using the MKJI 1997 method, the highest volume of Mahkota II Samarinda on Saturday is 1003.25 smp / hour with the highest Level Of Service (LOS) occurring on Saturday at 0.33, with a level service category "B".
ANALISA RISIKO PEKERJAAN REHABILITASI JARINGAN IRIGASI DI.WARU KABUPATEN PENAJAM PASER UTARA PROVINSI KALIMANTAN TIMUR ALI, AKHIRUDDIN
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (933.194 KB)

Abstract

The risk is one of the things that can not be separated in daily live as well as the implementation of construkctions projeck did not separated with the risk. Irrigation canal is the unity of the cannals and the building which needed for the irrigation water settings, that starting from provision, water taking, division,water giving and water using of the problem the research with tittle “the risk analysis of rehabilitation of canals irrigation construction in DI. Waru panajam pasir utara district, east Borneo” Construction and what are how to identify the risk of rehabilitation the most influenced to the rehabilitation construction. The purpose of this study was to identifyed the risk in the rehabilitation construction and to analysied the risk that gives the most negative effect while the rehabilitation construction. Method of this study was quantitative and the souses of this study was quitioner and interview. The data would be analysed by peartson product moment and probability impact matrix method, and likert scale was the theoritical basis of this study. Based on data analysis, the research found that from 27 variables there was 23 variables was valid and 4 variable was not valid. the presentation from 4 variables that have high category was 17.5%.
STUDI PERBANDINGAN HASIL GAYA DALAM DARI SISTEM RANGKA PEMIKUL MOMEN KHUSUS KONDISI ELASTIS DAN KONDISI PLASTIS PADA TANAH SEDANG DI KOTA SANGATTA IRJALI, RAHMAT SIDIK
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (475.008 KB)

Abstract

Indonesia terletak didaerah rawan gempa, sehingga perlu direncanakan struktur bangunan tahan gempa. Penelitian ini dilakukan untuk membandingkan hasil gaya dalam dari Sistem Rangka Pemikul Momen Khusus (SRPMK) kondisi elastis dan kondisi plastis. Penelitian ini mengacu pada ATC-40 dan SNI-1726:2012. Beban gempa kondisi elastis meliputi statik ekivalen dan respons spektrum dengan program ETABS, sedangkan untuk kondisi plastis meliputi analisa pushover dengan program ETABS. Peneletian ini bertujuan untuk mengetahui distribusi sendi plastis, perbandingan hasil gaya dalam dan mengetahui pola keruntuhan. Hasil penelitian menunjukkan sendi-sendi plastis terjadi pada elemen balok baru kemudian elemen kolom, nilai gaya dalam dengan perbedaan tidak signifkan pada nilai momen, gaya geser dan torsi, sedangkan untuk gaya aksial perbedaan nilai terlihat signifikan. Level kinerja struktur masuk kriteria Immediate Occupancy yang berarti terjadi kerusakan kecil pada struktural dan bangunan dapat segera digunakan kembali
ALTERNATIVE STUDY PRESTRESSED BEAMS ON THE SEI BURUNG BRIDGE IN BERAU TA, NI
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2016)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (148.629 KB)

Abstract

Capability and reliability for a bridge is really effected by a type and a power of beam girder. Sei Burung bridge with a iron girder which spread over a brackish water is very susceptible to corrosion where it can decrease the strength and resilience of the bridge.By doing an alternative study for planning back the structure of a bridge, especially for a main girder by using Prestress Concrete’s profile and got the best bridge design structure, so hopefully it can solved that problem.This alternative study is using a reference standard of American Association of State Highway and Transportation Officials (AASTHO) for deciding dimension and the number of tendon, layout of placement cables and calculation of loss of voltage which are based on the book TY.LinThe result of calculation and discussion we got tendon dimension type ES- 46 using a single tendon uncoated 7 wire super stands ASTMA-416 grade type with LOP about 17,75& and first prestress style 572747,548 Kg has loss prestress by 20% so that there is 470 tons of effective stress left with a last stress produced is about  - 165,670 to press and 16,133 to pull
PENATAAN PEMUKIMAN TERAPUNG DESA JANTUR, KECAMATAN MUARA MUNTAI KUTAI KARTANEGARA DENGAN PENEKANAN ECO-ARCHITECTURE ZULHAMDANI, FAHREZA
KURVA S JURNAL MAHASISWA Vol 4, No 1 (2014)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Fahreza Zulhamdani, Penataan Pemukiman Terapung Desa Jantur, Kecamatan Muara Muntai Kutai Kartanegara dengan Penekanan Arsitektur Ekologi (Eco-Architecture), di bawah bimbingan Hj. Mahdalena Risnawaty, S.T,.M.T  dan Ir. Prasetyo, M.T.Perencanaan ini bertujuan untuk mengetahui, menjelaskan serta memberikan solusi dengan pemecahan masalah pada penataan pemukiman Desa Jantur, dalam upaya meningkatkan kualitas kehidupan yang berwawasan lingkungan. Klasifikasi pada pola penelitian ini menggunakan salah satu metode penelitian deskriptif kualitatif adalah metode fenomenalogi, yang artinya adalah suatutradisi untuk mengekplorasi pengalaman pada manusia. Dalam kontek metode ini manusia aktif memahami dunia sekelilingnya sebagai sebuah pengalaman hidup dan aktif menginterpretasikan pengalaman tersebut. Data yang akan disajukan dalam penelitian ini adalah data primer, dimana penulis melakukan observasi lapangan dan melakukan wawancara langsung, serta data sekunder yang diperoleh melalui telaah pustaka, baik melalui buku-buku, jurnal, majalah, tulisan ilmiah, serta data yang diperoleh melalui internet juga dinilai relevan dengan tema yang diangkat pada perencanaan penataan pemukiman ini.Hasil dari perencanaan penataan pemukiman terapung desa Jantur ini menunjukkan bahwa pentingnya sarana prasaran penunjang kehidupan masyarakat desa Jantur serta konsep pada bangunan yang mampu menjadi nilai ukur termal pada masyarakat yang menggunakannya. Dalam perencanaan penataan pemukiman terapung desa Jantur ini tentunya penulis mengharapkan bahwa dengan sarana prasarana yang masih sangat minim, ide dan konsep penataan tersebut mampu menjadi sebuah kontribusi pada perkembangan kehidupan masyarakat desa Jantur.Kesimpulan dari tema tugas akhir yang berjudul Penataan Pemukiman Terapung Desa Jantur, Muara Muntai Kutai Kartanegara dengan Penekanan Ekologi Arsitektur (Eco-architecture) ini adalah sebuah upaya untuk meningkatkan kualitas hidup warga desa Jantur melalui sebuah perencanaan bangunan yang mengusung konsep Ekologi Arsitektur dengan tujuan memberikan daya tarik baik secara termal maupun visual pada pola perencanaannya.
ANALISA JARAK TEMPUH DAN BIAYA OPERASIONAL BUS KOTA SAMARINDA - BALIKPAPAN AFIANTARA, HAVIZ RAHMAT
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1126.107 KB)

Abstract

serving Samarinda - Balikpapan route as well as medium buses that serve Samarinda route to several sub-districts in Kutai Kartanegara upstream. According to Bappeda data and the master plan of Samarinda City Kunjang River Terminal has an area of about 906 m2 and ± 193.876 / year number of passengers departing from this terminalIncreased ownership of four-wheeled vehicles impact on the lack of public interest in traveling by bus as mass transit, this is evident from the number of passengers who departed at the Kunjang River Terminal by bus Inter City Inside Province from Samarinda to Balikpapan and vice versaThe assessment of the performance standards of the bus assessments serving routes from the Kamarang Samarinda River Terminal to Batu Ampar Terminal based on the Department of Land Transportation (1996) and the results of the survey and analysis, were obtained;a. The service time provided by 20 bus companies commences departure from the Kunjang River Terminal at 5:51 am until 20:06 pm (05:51 - 20:06) for 14 hours 15 minutes (14:15) then this figure is in accordance with the established standard > (larger) 13 hours per day this is eligible.b. Average travel time for 3 hours 40 minutes > (greater) than the standard performance of public transport services that ranges from 60 minutes to 90 minutes because the Bus serves out-of-town transportation within the province of East Kalimantan.
PERENCANAAN CAMPURAN ASPAL BETON AC-BC DENGAN FILLER ABU SEKAM PADI, PASIR ANGGANA, DAN SPLIT PALU BASUKI, AHMAD
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2016)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (490.752 KB)

Abstract

Dalam masa pembangunan sekarang ini merupakan kewajiban kita semua untuk berusaha meningkatkan pembangunan terutama prasarana jalan raya khususnya kota Samarinda agar lebih berkembang lagi dengan memperhatikan kualitas dan mutu jalan yang ada diatasnya agar keamanan dan kenyamanan dapat dirasakan oleh pengguna jalan tanpa mengalami hambatan. Hambatan-hambatan yang dihadapi oleh pengguna jalan di kota Samarinda biasanya berupa kerusakan atau cacat yang terjadi pada konstruksi perkerasan jalan tersebut seperti lepasnya agregat pada ikatan aspal sehingga agregat berserakan dimana-mana dan jalan menjadi berlubang.Jalan yang rusak sebelum masa pelayanannya habis juga didapatkan masihbanyak yang rusak. Hal ini ditinjau dari sebagian macam faktor antara lain beban-beban kendaraan yang berlebih, iklim tropis di Indonesia, pengawasan yang kurang baik saat penghamparan lapis perkerasan dilapangan, ataupun tidak terkontrolnya pelaksanaan job mix formula pada saat melaksanakan campuran perkerasan.Didalam penulisan ini kombinasi yang digunakan adalah hasil pembakaran gabah padi menjadi abu sekam padi sebagai penambah filler. Di Indonesia umumnya jenis lapisan perkerasan permukaan jalan digunakan adalah aspal beton. Oleh sebab itu penulis tertarik untuk melakukan penelitian tentang penggunaan variasi butiran maksimum pada campuran asphalt concrete binder course tersebut.Adapun batasan masalah dalam penelitian ini antara lain adalah Campuran aspal yang ditinjau adalah aspal AC – BC, material menggunakan Split Ex. Palu, Pasir Anggana, aspal yang digunakan yaitu aspal pertamina penetrasi 60/70, pengujian menggunakan alat marshall, yang ditinjau adalah rongga dalam campuran (VIM), rongga dalam agregat (VMA), rongga terisi aspal (VFA), stabilitas dan kelelehan (flow), tidak melakukan pengujian aspal .Maksud dari penelitian ini adalah  mengadakan pengujian langsung di laboraturium tentang perencanaan campuran beton Asphalt Concrete-Binder Course (AC-BC)dengan filler Abu Sekam Padi, Pasir Anggana, dan split Palu.Adapun tujuannya adalah untuk Mengetahui pengaruh kadar aspal terhadap campuran aspal beton AC-BC dengan filler abu sekam padi, pasir anggana, dan split palu.
EVALUASI KAPASITAS DAYA TAMPUNG SALURAN DRAINASE JALAN DAMANHURI PADA KOTA SAMARINDA ISNAINI, FAULIA
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (879.15 KB)

Abstract

Banjir adalah aliran air yang relatif tinggi, dan tidak tertampung oleh alur sungai atau saluran. Bencana alam di suatu wilayah memiliki implikasi secara langsung terhadap masyarakat di wilayah tersebut. Partisipasi masyarakat untuk mengurangi dan menghindari risiko bencana penting dilakukan dengan cara meningkatkan kesadaran dan kapasitas masyarakat seiring berjalannya waktu pembangunan perumahan dan ruko-ruko terjadi sangat pesat di jalan Damanhuri. Untuk menangani permasalahan banjir di jalan Damanhuri ini perlu ditinjau kondisi eksisting saluran dengan menghitung hujan rancangan dengan metode Log Person III, kemudian menghitung debit banjir rancangan Existing dengan mengunakan metode rasional . Dari Hasil penelitian di lapangan didapat panjang lintasan terjauh yang dilalui air yaitu (5,200 km),Intensitas hujan rencana menunjukkan dalam jangka waktu 2, 5, 10 dan 25 tahun (2043 tahun).Saluran Q2, Q4 dan Q5 tidak mampu menampung debit air. Salah satu solusinya yaitu saluran diperlukan perubahan dimensi dengan kala periode ulang 2043 tahun, dengan dimensi yang sudah mencukupi atau dimensi sebelumnya yaitu lebar bawah (b) 0,8 m dan tinggi saluran penampang basah (h) 0,5 m dengan nilai debit rancangan Q2 = 0,806 m 3 /dt, Q4 =0,834 m 3 /dt dan Q5 = 0,756 m 3 /dt.
ANALISIS STABILITAS SHEET PILE SEBAGAI PERKUATAN TEBING SUNGAI ALAM STADION SEMPAJA SAMARINDA ANSYAH, ARLI
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (181.739 KB)

Abstract

Analisis dalam skripsi ini bertujuan untuk merencanakan dimensi dan stabilitas sheet pile dengan perhitungan manual serta mengetahui angka keamanan lereng dan displacement pada sheet pile dengan program Plaxis di sungai alam stadion sempaja Samarinda yang berada di jalan M. Yamin Kec. Samarinda Ulu Kota Samarinda, perhitungan tekanan tanah dengan menggunakan teori Rankine. Hasil yang didapatkan berdasarkan analisis yang dilakukan adalah sebagai berikut: dari perhitungan manual, diperoleh total panjang sheet pile 4,3 m dan nilai momen maksimum sebesar 3,2 Ton.m. Digunakan turap/sheet pile wika CPC (Corrugated Prestressed Concrete) tipe W-325 A 1000 dengan cracking moment sebesar 11,4 Ton.m, nilai cracking moment turap lebih besar dari nilai momen maksimum jadi dianggap dapat dipakai sebagai perkuatan pada tebing sungai alam dan dari perhitungan dengan menggunakan program Plaxis, dengan perkuatan sheet pile beton pada panjang 4,3 m diperoleh nilai SF (angka keamanan) 2,2 ≥ 2 (aman) dengan displacement sheet pile sebesar 6,05 cm.
PERENCANAAN SEKOLAH TINGGI FASHION TENGGARONG DENGAN PENDEKATAN FUTURISTIK HARDIANTA, RENDY
KURVA S JURNAL MAHASISWA Vol 1, No 1 (2018)
Publisher : KURVA S JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (730.946 KB)

Abstract

Masyarakat Kutai Kartanegara/Tenggarong  terjun di dunia Fashion baik Pemuda-pemudi yang ingin menyalurkan hobi dan bakat mereka sehingga menjadikan sebagai suatu bidang fashion  baik desaianer busana maupun Tata Kecantikan  dan yang paling banyak diminati oleh orang yaitu menjadi seorang model yang Profesional. Setiap tahun di Kota Tenggarong. Banyak dari kalangan komunitas di tenggarong selalu mengadakan Carnival, dan komunitas fashion tenggarong atau komunitas fashion Art carnival tenggarong selalu ditunggu-tunggu masyarakat  karena setiap tahun selalu menampilkan busana adat tenggarong dan beberapa busana karya komunitas fashion sehingga masyarakat tenggarong tertarik untuk menjadi seorang desainer lebih dari 143 orang pemuda dan pemudi. Namun Di Kalimantan timur lebih tepatnya di tenggarong belum adanya Sekolah tinggi Fashion sehingga pemuda pemudi yang setelah lulus dari Sma/Smk yang berkeinginan Menjadi Seorang Profesional Dalam Bidang Fashion harus Kuliah Diluar dari Kalimantan.penulis telah melakukan survey ke lokasi yang di ajukan dan penulis memilih lokasi yang bertempat di jalan Usaha Tani, kota Tenggarong karna memiliki kriteria yang cocok untuk perencanaan Sekolah tinggi. Konsep Judul Mengambil dari beberapa bentuk dasar dan di jadikan sebuah konsep bentuk bangunan, untuk gedung sekolah tinggi mengambil dari konsep sebuah mahkota raja kutai kartanegara, Gedung Perpustakaan dan Gedung serbaguna Mengambil Dari Sebuah Konsep potong setengah bundaran,. Konsep ini akan Diaplikasikan pada bentuk bangunan yang menarik secara arsitektural

Page 92 of 111 | Total Record : 1106