cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Compatibility Drive Train Parts di PT Insera Sena Sidoarjo Feldo Natanael
Jurnal Titra Vol 7, No 2 (2019): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (545.698 KB)

Abstract

PT Insera Sena is a bicycle assembly company, which has been established since 1989. PT Insera Sena covers local as well as international markets for more than fifty countries across five continents. The company capacity is approximately 750,000 units bicycles per year that can be categorized as road bike, mountain bike, urban, and E-bike. Each type of bicycle has different types of component. Therefore, the variety of bicycle's components is huge. One of the major issues in the PT. Insera Sena is dead-stock. The dead-stock can occur due to uncontrolled variety of bicycle's components, incompatibility specification in bicycle construction due to human error, or other cases. In this research, we propose tools to prevent human error. The proposed tools are an Excel program for checking the parts compatibility for each bicycle specifications and components grouping maps. Those tools are applied by Insera Sena, and indeed they can reduce the dead-stock due to the human error.
Perancangan Workshop FFWD dan Catalyst Development Program di PT.X. Kevin Widjaja; Felecia Felecia
Jurnal Titra Vol 6, No 2 (2018): Jurnal Titra vol. 6 No. 2, Juli 2018
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (369.576 KB)

Abstract

Human Resources (HR) in PT. X has started to implement FFWD method (a new way of working) less than 1 year, since the third quarter in 2017. That is why PT.X needs to execute the training for their employees so they know what is Fastforward and make some system that is called Catalyst Development Program for doing tracking and appreciate the Catalyst. Before this, there is already a workshop for a high level employee, now PT.X needs the workshop for middle level employee. The result of the workshop design that can be use for middle level employee is the result from modification and improvement from the last workshop. Catalyst Development Program that has been created is transactional where Catalyst will get the reward in a form of material.
Penurunan Persentase Rework di PT X dengan Metode DMAIC Hervy Monica Aransa; Debora Anne Yang Aysia
Jurnal Titra Vol 3, No 1 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (270.908 KB)

Abstract

PT X is a company which is focused on bag and plastic production. The high percentage of rework which is about 25.5% is one of the problems in this company. The purpose of this research is to decrease the rework percentage in PT X Company by using DMAIC method (Define, Measure, Analysis, Improve and Control). There are three types of defects that often happen based on Pareto Diagram, which are not proportional shapes, less of needlework and over-needlework.  Fishbone Diagram is used to find the cause of defects which are human factors, method and machine. There are six ways to decrease the higher percentage of reworks such as, making operator evaluation form, making sewing pattern using chalk, making a layer to measure the shape of product, rechecking the product at the end of production process, making a list of working instructions  and changing the needle regularly. By implementing four ways, it can reduce the number of defects which are 6 % on not proportional form and 2.27% on less of needlework. It also increases the percentage of over-needlework detects which is 1.33%. In general, there is a decreasing percentage of the number of defects which is about 6.9% after implementation. Control steps using quality plan, is made as a standard that aims to describe the production process, its name, material and characteristics quality which including types of defects, acceptance, measurement method, inspection period, inspection method, person in charge, and the actions based on quality characteristic.
Pengaruh Kebijakan Keselamatan dan Kesehatan Kerja Terhadap Tenaga Kerja Konstruksi PT Wijaya Karya (Persero) Tbk. di Proyek Tol Surabaya Mojokerto Radhitya Wisnu Satriawan; Togar Wiliater Soaloon Panjaitan
Jurnal Titra Vol 4, No 2 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (494.956 KB)

Abstract

Occupational health and safety are one of important factor which can affect employees’ performance. The risk of accidents will rise if the company does not supervise the regulation of occupational safety and health policy. PT Wijaya Karya (Persero) Tbk. is pretty concern about this policy with the result of increased employees’ productivity. High employees’ performance will achieve high quality project target. This study uses questionnaire method that filled by construction employees to find the effect of occupational safety and health policy to construction employees performance. The data will be tested with double linear regression and hypothesis test. In addition, the author use simultaneous test (F test) and partial test (T test) for the hypothesis test. The double linear regression test result is occupational health variable has a bigger effect to employees performance that occupational safety. The simultaneously result is F has bigger value than Ftable, that means both of independent variables have a positive significant effect to construction employees performance. Furthermore, the partial test gives bigger T value than Ttable, which describes every independent variable have a positive significant effect to construction employees’ productivity.
Perancangan Sistem Planned Maintenance dan Man Power Planning di PT X David Soebiantoro; Siana Halim
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (193.784 KB)

Abstract

The purposes of this thesis are designing a planned maintenance and man power planning in the maintenance department of PT X Previously, the PT X used breakdown and cor­rec­tive maintenance. The maintenance procedures will be revised into corrective main­tenance and when continuous pro­duction system is executed, corrective & preventive maintenance will be applied. For defining those procedures, first we identified the machines’ failure and redesign­ed the production system. Additionally, we propose four level of man power planning based on their skill and company management want it divide into four level.
Analisa Optimasi Rute Pengiriman Pre Order (PO) di Jakarta Zone pada PT. X Felix Valentino; I Gede Agus Widyadana
Jurnal Titra Vol 6, No 2 (2018): Jurnal Titra vol. 6 No. 2, Juli 2018
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (367.252 KB)

Abstract

PT.X is a company that working on Fast Moving Consumer Goods (FMCG) section. This company has more than 100 selling area that located in all over Indonesia. There are various selling system or distribution system in this company and one of them is Pre Order system (PO). The vehicle types that used for delivery on this system are blind van, Colt Diesel Engkel (CDE), and Cold Diesel Double (CDD). The purpose of this research is to discovered route optimitation so it can shows how many vehicles are needed for the delivery. It also can decrease the operational cost for the delivery. This route optimitation simulation is based on the existing route but it had been optimized with arranging the delivery using the Nearest Neighbor Insertion (NNI) concept where the delivery route will be using the shortest route. This PO delivery system also using the combination of Vehicle Routing Problem with Time Windows (VRPTW), Vehicle Routing Problem with Heterogenouse Fleet of Vehicle (VRPHFV), and Vehicle Routing Problme with Multiple Trips (VRPMT).The result of this simulation is the total number of vehicles that can be decreased in one week are 34 unit. In Bogor, Ciracas and Pulo Gadung, 1 unit of vehicle can be removed for Senin until Thursday (1*4*3=12). In Sunter, there are 3 unit of vehicles that can be removed for Monday until Thursday (3*4) and lastly in Tangerang there are 2 unit of vehicles that can be removed for Monday untul Friday (2*5=10). The distances that should be taken are decreased from 9,604 km to 8,028 km with total duration 1372,01 hours when it actually should be taking 1484,3 hours. The reducing of distance and time become a great additional benefit for the company because the company can save more fuel that can also reduce the polution of CO2. For the saving of the cost in this simulation is from Rp. 948,017,052.66 become Rp.797,589,503.62.
Standar Kerja dan Perencanaan Kualitas Potongan Daging Sapi dari RPH Sampai Display Pasar Tradisional Kelvin Siswanto; I Nyoman Sutapa
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (201.229 KB)

Abstract

Rumah Potong Hewan (RPH) is a place where do slaughter animals for food. Consumer demand for quality piece of meat made RPH must pay attention to the production process. Standardized work and quality plan is needed for the resulting product had a high quality, especially piece of meat. Standardized work and quality plan is not end until RPH, but also transportation and display at traditional market. Improvement methods used in this research is the method of Standardized work, quality plan, and fishbone diagram. This improvement will be supported by the establishment of some standardization work in order to maintain sustainable improvements in the future.
Sentralisasi Proses Heat Treatment di PT. XYZ Genesius Wilfred Tanzil; Prayonne Adi
Jurnal Titra Vol 5, No 2 (2017): vol 5 no 2, Juli 2017
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (998.314 KB)

Abstract

This research focuses on centralization of heat treatment process at PT. XYZ. The process of centralization of heat treatment aims to maximize the function of the existing sanyung furnace machine in plant 3, where the sanyung furnace machine has a capacity three times larger than other furnace machines. This centralization process requires stock chain components and layout in accordance with the calculation of stock components.The stock components required to carry out this centralized heat treatment process are 290 AHD containers at plant 1, 81 AHD containers at plant 3, and 189 BHD containers in plant 3. The area required to hold the AHD component in plant 1 is 398 M² , While the area required to accommodate the AHD and BHD components in Plant 3 is 115 m² and 283 M². Centralized heat treatment process can generate profit per month as much as Rp. 84,377,043, while the investment cost required to run the centralization of this heat treatment process is as much as Rp. 135,000,000.
Peningkatan Kemampuan Analisa Root-Cause Staf Produksi PT E-T-A Indonesia Dalam Upaya Penurunan Kecacatan Steven Irawan; Indriati Bisono
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (503.148 KB)

Abstract

PT E-T-A Indonesia is a manufactur company that produce electricity component such as circuit breaker and switch. As a electricity component maker that trusted by well-known brand all over the world such as Mercedes-Benz, Audi, and also Airbus, quality is a must-have key in every single production activitiy. There are some defect problem that occurs in every production segment frequently. In order to reduce defect number, root-cause analysis skill is needed whereas most of production staff doesn’t have enough skill to analyze the root-cause problem. The improvement of root-cause analysis skill is using DMAIC methods. Its begin with Define phase where all of the problem that happens are defined including quality characteristic of their products itself. The next phase is measure phase, the defect problem that happens in 1170 and 1180 from January until March 2014 are measured and counted into as a data in this phase. Analyze phase is a next-step phase where the main cause of the main problem are analyzed conscientiously, in this case, the main cause is founded, that is incapability skill of analyzing the root-cause of a problem in 1170 and 1180 worker. The next phase is improvement phase, the worker of 1170 and 1180 are trained with the right quality tools in order to make an root-cause analyze in case another problem happen. Evaluation of these improvement is monitoring the worker skill to do root-cause analyze correctly. Evaluation is a final phase that called control phase in this final project.
Human Resources Continuous Improvement Performance Model dan Recognition & Reward Scheme: A Case Study Derried Anwar; Siana Halim
Jurnal Titra Vol 4, No 2 (2016): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (449.287 KB)

Abstract

Continuous Improvement (CI) in PT. X’s Human Resources (HR) department has already been started for almost 2 years. However, HR didn’t have any mechanism to measure how good a department in doing CI. Moreover, a new way to increase employees’ spirit to contribute in CI by creating improvement ideas is also needed. HR CI Performance Model and Recognition & Reward Scheme are created as a measurement mechanism and to boost up CI spirit in HR. HR CI Performance Model is developed until two times to describe the current condition more appropriately. Recognition & Reward Scheme is created by Balance Scorecard theory. Both of these measurements can increase the amount of created improvement ideas by 25.3% and department participation by 22%. Additionally, some of managers and staffs also acknowledge the positive impacts of both of those measurements.