cover
Contact Name
Sulha
Contact Email
ojs_mk@uho.ac.id
Phone
+628114097029
Journal Mail Official
ojs_mk@uho.ac.id
Editorial Address
Kampus Hijau Bumi Tridharma, Jl. H.E.A. Mokodompit, Anduonohu, KENDARI 93232
Location
Kota kendari,
Sulawesi tenggara
INDONESIA
Media Konstruksi : Jurnal Ilmiah Teknik Sipil
Published by Universitas Halu Oleo
ISSN : -     EISSN : 25032712     DOI : http://dx.doi.org/10.33772/jmk.v7i2
Adapun bidang-bidang yang tercakup di dalam ruang lingkup Jurnal Media Konstruksi, namun tidak terbatas pada, antara lain: - Teknologi Informasi dan Komunikasi - Pemukiman dan Bencana - Bangunan Berorientasi Lingkungan - Transportasi - Teknologi Proses - Kelautan - Geoteknik - Struktur - Manajemen Konstruksi - Keairan
Articles 7 Documents
Search results for , issue "Vol 5, No 2 (2020): MedKons" : 7 Documents clear
IDENTIFIKASI JENIS KERUSAKAN LAPIS PERKERASAN JALAN RAYA DAN UPAYA PENANGANANNYA MENGGUNAKAN METODE BINA MARGA (Studi Kasus: Jalan Desa Bumi Indah, Kab. Konawe – Sulawesi Tenggara) Karsata Haafi; Siti Nurjanah Ahmad; Sulha Sulha
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (694.54 KB) | DOI: 10.33772/jmk.v5i2.24146

Abstract

Abstract Road is one of the supporting means of transportation in each region because this infrastructure will accelerate the growth and development of an area as well as open relations of social, economic and cultural between regions. The purpose of this study was to find the types of road damage and the alternatives handling of road damage. The research was located on Desa Bumi Indah Street, Konawe Regency- Southeast Sulawesi, with a road length of 1 km, and a width of 4,5 m, the damage type of bending (asphalt), this study used Bina Marga method.From the research results, the types of road damage that occurred on Desa Bumi Indah Street, Konawe Regency - Southeast Sulawesi, there are 6 types. Damage of aligator crack was 26%, damage of potholes was 23%, damage of polished aggregate was 20%, damage of grade depression was 18%, damage of longutudinal crack was 11%, and damage of slippage crack was 2%. And the most dominant damage is alligator crack.The repair of damage can be done by repairing according to the damage that occurred, suitable repair is patching and for the type of polished aggregate damage, namely covering the layer with sand sheet, sprinkled asphalt and NACAS (Non Aggregated Cold Asbuton Sheet) and then routine maintenance is carried out.  Abstrak Jalan raya merupakan salah satu pendukung sarana transportasi disetiap daerah karena prasarana ini yang akan mempercepat pertumbuhan dan perkembangan suatu daerah serta membuka hubungan sosial, ekonomi dan budaya antar daerah. Tujuan penelitian ini untuk mengetahui jenis kerusakan jalan dan alternatif penanganan kerusakan jalan. Tempat penelitian pada ruas Jalan Desa Bumi Indah, Kab. Konawe – Sulawesi Tenggara dengan panjang jalan 1 km, dan lebar 4,5 m, jenis kerusakan lentur (aspal), penelitian ini menggunakan metode Bina Marga.Dari hasil penelitian, jenis kerusakan jalan yang terjadi pada ruas Jalan Desa Bumi Indah, Kab. Konawe – Sulawesi Tenggara yaitu ada 6 jenis. Kerusakan retak kulit buaya 26%, jenis kerusakan lubang 23%, jenis kerusakan pengausan agregat 20%, jenis kerusakan amblas 18%, jenis kerusakan retak memanjang 11%, dan jenis kerusakan patah slip 2%. Dan kerusakan yang paling dominan adalah kerusakan retak kulit buaya. Perbaikan kerusakan dapat dilakukan dengan memperbaiki sesuai kerusakan yang terjadi, perbaikan yang sesuai adalah tambalan (patching) dan untuk jenis kerusakan pengausan agregat yaitu menutup lapisan dengan latasir, buras dan latasbum. dan selanjutnya dilakukan pemeliharaan rutin. 
ANALISIS PARKIR KENDARAAN PADA AREA PARKIR RUMAH SAKIT ALIYAH 3 KOTA KENDARI (Studi kasus : Analisis Karakteristik Parkir Rumah Sakit Aliyah 3 Kota Kendari) Nino Wahyudin; La Welendo; Mappa Nashrun
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (463.945 KB) | DOI: 10.33772/jmk.v5i2.24147

Abstract

Abstract Aliyah Hospital 3 one of the hospitals located in the city of Kendari, southeast Sulawesi is one of the health service centers for the people of kendari city and its surroundings. Hospital is a public service or activity center that is visited by many residents because they want to seek treatment and to know their health, resulting in a growing number of visitors affecting the amount of parking capacity in the parking area of the hospital aliyah 3 cities kendari, motorists and cars are increasing and the need for parking lots is increasing.Parking Space Needs (KRP) in the parking area of Aliyah Hospital Building 3 Kendari 42 m² for cars and 27,3 m² for motorcycles with the total area of parking needs is 69,3 m2.This survey will be recorded at 9 hours for 1 day survey, namely on the day of research At 07.00 – 16.00 Wita, the observation time interval is set 30 minutes and record the number of vehicles that have been parked before observation and the number of vehicles entering and exiting vehicles.  Abstrak Rumah Sakit Aliyah 3 salah satu rumah sakit yang terletak di Kota Kendari, Sulawesi tenggara merupakan salah satu pusat pelayanan kesehatan bagi masyarakat Kota Kendari dan sekitarnya. Rumah sakit adalah suatu pelayanan publik atau pusat kegiatan yang banyak di kunjungi oleh penduduk karena ingin berobat maupun untuk mengetahui kesehatannya, mengakibatkan jumlah pengunjung yang makin meningkat mempengaruhi jumlah kapasitas lahan parkir di area lahan parkir rumah sakit aliyah 3 Kota Kendari, pengendara bermotor dan mobil semakin bertambah dan kebutuhan akan lahan parkir pun semakin meningkat.Kebutuhan Ruang Parkir (KRP) di area parkir Gedung Rumah Sakit Aliyah 3 Kendari 42 m2 untuk mobil dan 27,3 m2 untuk motor dengan jumlah keseluruhan luas kebutuhan parkir adalah 69,3 m2.Ssurvey ini akan dilakukan pencatatan pada waktu 9 jam selama 1 hari survey, yaitu pada hari penelitian Pada Pukul 07.00 – 16.00 Wita, interval waktu pengamatan di tetapkan 30 menitan dan mencatat jumlah kendaraan yang sudah terparkir sebelum pengamatan dan jumlah kendaraan masuk dan kendaraan keluar. 
UJI KELAYAKAN BATU PECAH DESA PARIDA KECAMATAN LASALEPA KABUPATEN MUNA SEBAGAI AGREGAT KASAR CAMPURAN BETON Irvan Jaya; Romy S. E. Tamburaka; Wayan Mustika
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (147.07 KB) | DOI: 10.33772/jmk.v5i2.24143

Abstract

Abstract In Muna Regency, there are some kinds of mountain rocks, including in Parida Village, Lasalepa District. There is a place where local people usually take crushed stone to be used as a material for making concrete. The area of land where the local people used to collect mountain stones was ± 2 hectares. Based on the description, the writer considers it necessary to conduct research in order to complete the final project by taking the title "Feasibility Test for Broken Stone Materials in Parida Village, Lasalepa District, Muna Regency as Coarse Aggregates in Concrete Mixtures" with the formulation of the problem of how coarse aggregate characteristics (crushed stone) ) from Parida Village, Lasalepa District, Muna Regency and what is the feasibility of coarse aggregate (crushed stone) from Parida Village, Lasalepa District, Muna Regency, for concrete mixtures with f'c 20 Mpa. The purpose of this study was to determine the characteristics of coarse aggregate (crushed stone) from Parida Village, Lasalepa District, Muna Regency and also to determine the feasibility of coarse aggregate (crushed stone) from Parida Village, Lasalepa District, Muna Regency, for concrete mixtures with f'c 20 Mpa.Based on laboratory tests, the results obtained moisture content 0.49%, 1.02% sludge content, 2,53 SSD specific gravity, 1,37 gram/cm3 volume weight, 1,95% absorption, 35,90% wear. The results of the concrete compressive strength test that has been carried out reach an average quality of 13,97 MPa at 7 days old, 16,26 MPa at 14 days old, and 21,04 Mpa at 28 days old. So the conclusion from the research that has been done is that the crushed stone of Parida Village, Lasalepa District, Muna Regency is declared suitable for use as coarse aggregate for concrete mixtures with f'c 20 Mpa quality.  Abstrak Di Kabapaten Muna banyak terdapat batu gunung, tidak terkecuali di Desa Parida kecamatan Lasalepa. Di daerah tersebut terdapat tempat dimana masyarakat setempat biasa mengambil batu pecah untuk digunakan sebagai bahan pembuatan beton. Luas lahan dimana para penduduk setempat biasa mengambil batu gunung adalah ± 2 hektare. Maka berdasarkan dari uraian di atas sehingga penulis memandang perlu untuk melakukan penelitian dalam rangka penyelesaian tugas akhir dengan mengambil judul ”Uji Kelayakan Material Batu Pecah Desa Parida Kecamatan Lasalepa Kabupaten Muna Sebagai Agregat Kasar Pada Campuran Beton” dengan rumusan masalah bagaimana karakteristik agregat kasar (batu pecah) asal Desa Parida Kecamatan Lasalepa Kabupaten Muna dan bagaimana kelayakan agregat kasar (batu pecah) asal Desa Parida Kecamatan Lasalepa Kabupaten Muna,  untuk campuran beton dengan f’c 20 Mpa. Tujuan dari penelitian ini adalah untuk mengetahui karakteristik agregat kasar (batu pecah) asal Desa Parida Kecamatan Lasalepa Kabupaten Muna dan juga untuk mengetahui kelayakan agregat kasar (batu pecah) asal Desa Parida Kecamatan Lasalepa Kabupaten Muna, untuk campuran beton dengan f’c 20 Mpa.Berdasarkan pengujian laboratorium yang dilakukan, diperoleh hasil kadar air 0,49 %, kadar lumpur 1,02 %, berat jenis SSD 2,53, berat volume 1,37 gram/cm3, absorbtion 1,95 %, keausan 35,90%. Dan hasil dari pengujian kuat tekan beton yang telah dilakukan mencapai mutu rata-rata 13,97 Mpa diumur 7 hari, 16,26 Mpa diumur 14 hari, dan 21,04 Mpa diumur 28 hari. Maka kesimpulan dari penelitian yang telah dilakukan yaitu batu pecah Desa Parida Kecamatan Lasalepa Kabupaten Muna dinyatakan layak untuk digunakan sebagai agregat kasar untuk campuran beton dengan mutu f’c 20 Mpa. 
METODE PELAKSANAAN PEKERJAAN LAPIS PONDASI ATAS (LPA) STUDI KASUS PEKERJAAN JALAN POROS WUNA-LAFINDE JALUR II KABUPATEN MUNA BARAT La Ode Yasir; La Welendo; Umran Sarita
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (168.629 KB) | DOI: 10.33772/jmk.v5i2.24148

Abstract

Abstract This study aimed at to find out the management problems in material mobilization and time implementation management which were applied to overcoming problems during Top Foundation Layer method implementation for improving Wuna - Lafinde road, line II, in West Muna Regency.  S curve of contract document was used in analyzing the time implementation management. Analysis of costs and heavy equipment productivity used in project enforcement namely blending equipment, Wheel Loaders, barges, Excavators, dump trucks in 3.5, ton loads, dump trucks in 10 ton loads, graders, Vibrator Rollers and Water Tank Truck, refers to Minister of Public Works and Public Housing regulation No. 28 of 2016 in Highways Sector.Analysis result showed that management problems in material mobilization were the delayed of contractors in started their work, lack of dump trucks in capacity of 10 tons and the scarcity of dump trucks in 3.5 tons capacity. Time management in overcoming the problem of material mobilization is the contractor have to provide the ready mix materials before entering the first week of the S curve in contract document, add a dump truck in 10 tons capacity and augment a dump truck in 3.5 tons capacity.  Abstrak Karya ilmiah ini bertujuan untuk mengetahui permasalahan  manajemen dalam mobilisasi material dan manajemen waktu pelaksanaan yang diterapkan dalam mengatasi masalah yang timbul pada saat pelaksanaan pekerjaan lapis pondasi atas pada pekerjaan peningkatan jalan  poros Wuna – Lafinde jalur II  Kabupaten Muna Barat. Analisis manajemen waktu pelaksanaan menggunakan  kurva S dokumen kontrak, Analisis biaya dan produktivitas alat berat yang digunakan dalam pelaksanaan pekerjaan yaitu blending equipment, Wheel Loader, kapal tongkang, Excavator, dump truck 3.5 ton, dump truck 10 ton, Motor Grader, Vibrator Roller dan Water Tank Truck, dengan mengacu pada Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 28 Tahun 2016 Bidang Binamarga. Hasil analisa menunjukan bahwa permasalahan manajemen pada mobilisasi material yaitu keterlambatan kontraktor pelaksana memulai pekerjaan, kurangnya dump truck kapasitas 10 ton dan kurangnya dump truck kapasitas 3.5 ton. Manajemen waktu dalam mengatasi masalah mobilisasi material yaitu kontraktor pelaksana harus menyediakan ready mix material sebelum masuk minggu pertama kurva S dokumen kontrak, penambahan dump truck kapasitas 10 ton dan penambahan dump truck kapasitas 3.5 ton. 
TINJAUAN PERENCANAAN PLAMBING PADA GEDUNG LAYANAN DAN LABORATORIUM STASIUN KARANTINA IKAN PENGENDALIAN MUTU RANOMEETO Idul Fitra; Romy Talanipa; Ranno Marlany Rachman; Fathur Rahman Rustan
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (169.41 KB) | DOI: 10.33772/jmk.v5i2.24144

Abstract

Abstract Building Services Laboratory Of The Quarantine Station Fish Quality Control Ranomeeto. Have extensive building 396 m2 on each floor. in order to support capacity and function of the laboratory building it. Techniques in data collection in field studies include: (1) observation field, (2) interview, (3) documentation.This field study aims to knowing methods Planning Review Plumbing In The Building Services and Laboratory Quarantine Station Fish Quality Control Ranomeeto. The results of the discussion this report reviews the planning of the plumbing in the building services and laboratory quarantine station fish this is : (1) using the method of the floor area effective at building laboratry, (2) calculate the water needs based on the type and number of tools plabing, (3) water demand calculations based on unit equipment plumbing, (4) calculate the volume capacity of the recervoir on building the lab, (5) determine the amount and types of equipment plumbing on the laboratory building. The conclusion obtained from the results of the calculation are the needs of clean water in the laboratory building 4,40 m3/day/person or 4.400 L/day/person. Volume capacity recervoir on building 2.467 litre. And has a number of tools as much as 24 pieces , water closed 6 pieces, urinal 3 pieces, lavatory 4 pieces, faucent 11 pieces.  Abstrak Gedung layanan laboratorium stasiun karantina ikan pengendalian Mutu Ranomeeto Memiliki luas gedung 396 m2 di setiap lantainya. demi mendukung kapasitas serta fungsi dari gedung laboratorium itu. Teknik dalam pengumpulan data pada studi lapangan meliputi: (1) obsevasi lapangan, (2) wawancara, (3) dokumentasi. Studi lapangan ini bertujuan untuk mengetahui metode Tinjauan Perencanaan Plambing Pada Gedung Layanan Laboratorium Stasiun Karantina Ikan Pengendalian Mutu Ranomeeto. Hasil pembahasan laporan ini Tinjauan Perencanaan Plambing Pada Gedung Layanan dan Laboratorium Stasiun Karantina Ikan ini adalah : (1) menggunakan metode luas lantai efektif pada gedung laboratorium, (2) menghitung kebutuhan air bersih berdasarkan jenis dan jumlah alat plambing, (3) perhitungan kebutuhan air bersih berdasarkan unit alat plambing, (4) menghitung kapasitas volume recervoir pada gedung lab, (5) mengetahui jumlah dan jenis alat plambing pada gedung laboratorium. Adapun kesimpulan yang didapat dari hasil perhitungan adalah kebutuhan air bersih pada gedung laboratorium 4,40 m³/hari/orang atau 4.400 L/hari/orang. Volume kapasitas recervoir pada gedung 2.467 liter. Dan memiliki jumlah alat sebanyak 24 buah , water closed 6 buah, urinal 3 buah, lavatory 4 buah, faucent 11 buah. 
SURVEY PEMETAAN BIDANG TANAH DALAM PELAKSANAAN PEMBANGUNAN RUANG JAMUAN MAKAN BENDUNGAN LADONGI KOLAKA TIMUR Diki Darmawan; La Ode Muhamad Nurrakhmad Arsyad; Asraf Asraf; Try Sugiyarto Soeparyanto; Ainussalbi Al Ikhsan
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (251.512 KB) | DOI: 10.33772/jmk.v5i2.24149

Abstract

Abstract This research is a research study conducted at Ladongi Kolaka Dam east of Southeast Sulawesi that aims to know the procedures or methods of measuring mapping surveys conducted in the Banquet Room of Ladongi Dam.From the results of the research at Ladongi Dam East Kolaka that based on the results and conclusions drawn, the survey and mapping method to determine the location of the starting point of the construction of the banquet hall using bm2 point as the initial benchmark in the work of the banquet room Ladongi dam. Related to the above conclusions in the measurement of stake out using the nearest points namely BM1 and BM2. The working method of measuring stakeout with coordinates (X, Y, Z) uses COORDINATES BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 and coordinates BM2 X = 376501.725, Y = 9541066.163, Z = 80.539.  Abstrak Penelitian ini merupakan studi penelitian yang dilakukan di Bendungan Ladongi Kolaka Timur Sulawesi Tenggara yang bertujuan untuk mengetahui tata cara atau metode pengukuruan survey pemetaan yang dilakukan pada Ruang Jamuan Makan Bendungan Ladongi.Dari hasil penelitian di Bendungan Ladongi Kolaka Timur bahwa berdasarkan hasil dan kesimpulan yang ditarik yaitu, metode survey dan pemetaan untuk menentukan lokasi titik awal pembangunan ruang jamuan makan dengan menggunakan titik BM2 sebagai patokan awal dalam pekerjaan ruang jamuan makan bendungan Ladongi. Terkait kesimpulan di atas dalam pengukuran stake out dengan menggunakan titik terdekat yakni BM1 dan BM2. Metode kerja pengukuran stakeout  dengan koordinat (X, Y, Z) menggunakan koordinat BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 dan koordinat BM2 X = 376501.725, Y = 9541066.163, Z = 80.539. 
METODE PELAKSANAAN PEKERJAAN DINDING PENAHAN TANAH (Studi Kasus Pekerjaan Talud Jl. Dewi Sartika Kota Kendari Paket 4 PHJD Sultra Tahun 2020) Evy Yusuf; Umran Sarita; Anafi Minmahddun; Sulha Sulha; Sultan Machmud Hasan Masikki
Media Konstruksi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2020): MedKons
Publisher : PRODI D3 TEKNIK SIPIL

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (173.394 KB) | DOI: 10.33772/jmk.v5i2.24145

Abstract

Abstract Indonesia is a country that is very prone to landslides, especially during the rainy ‎season, one of the methods used in controlling soil stability so that it does not ‎experience landslides is to build a DPT to hold land that has a slope where the ‎carrying capacity of the soil cannot be guaranteed. by the land itself. This study ‎aims to determine the method of carrying out talud work in accordance with ‎topographic and geotechnical conditions in the field and to estimate the cost of ‎carrying out talud work. This research only leads to the method of implementing ‎the work of retaining walls and the analysis of the stability of the excavation is ‎carried out using the 2018 Geo Slope.From the results of the calculation of the ‎Safety Factor for straight excavation 0,860, 1,353 sloping excavation, and SF ‎using talud, namely 1,342. The name of this article was originally published in ‎Indonesian language.‎  Abstrak Indonesia merupakan suatu negara yang sangat rawan terahadap longsor terutama ‎saat musim penghujan salah satu cara yang digunakan dalam pengendalian ‎kestabilan tanah agar tidak mengalami kelongsoran adalah dengan membangun ‎DPT untuk menahan tanah yang mempunyai kemiringan lereng dimana daya ‎dukung tanah tersebut tidak dapat dijamin oleh tanah itu sendiri. Penelitian ini ‎bertujuan untuk mengetahui metode pelaksanaan pekerjaan talud yang sesuai ‎dengan kondisi topografi dan geoteknik di lapangan dan mengestimasi biaya ‎pelaksanaan pekerjaan talud. Penelitian ini hanya mengarah pada metode ‎pelaksanaan pekerjaan dinding penahan tanah dan analisa perhitungan stabilitas ‎galian dilakukan dengan menggunakan Geo Slope 2018. Dari hasil perhitungan ‎Safety Factor untuk untuk galian lurus 0,860, galian miring 1,353, dan SF dengan ‎menggunakan talud yaitu 1,342. 