Claim Missing Document
Check
Articles

Found 34 Documents
Search

Usulan Perbaikan Sistem Perencanaan Produksi dan Pengendalian Inventory untuk Memenuhi Permintaan Produk Mukena (Studi Kasus: CV. Asri Collection) Agusti Setia Ningsih; Chaznin R. Muhammad
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 1 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i1.6280

Abstract

Abstract. CV. Asri Collection is a company that produces mukenas. The resulting mukena products are grouped into 1 family and 3 items consisting of dop mukena, catalia mukena, and armany mukena. This company has a strategy to respond to the make to stock (MTS) market, namely a strategy to respond to the market carried out by the company by absorbing production first, then the product is made into stock by the company. The business relationship carried out by the company is business to business (B2B), namely business relations that sell products to distributors. The problem faced by the company is ordering raw materials that do not meet requirements which causes the quantity of products produced to often experience overproduction or backorders. This research focuses on production planning and inventory control with the aim of proposing an appropriate production planning and inventory control system in order to meet the demand for mukena products. The stages carried out in this research are forecasting, aggregate planning, disaggregation which results in a master production schedule to find out when production is carried out, conducting feasibility tests with Rough Cut Capacity Planning, controlling raw material inventory with Material Requirement Planning. The results of this study are that the company's production planning proposal must produce 4,300 units of mukena every month based on the main production schedule. And it is difficult to control inventory by ordering 7 times in 10 periods. Thus the company can save expenses on the purchase of raw materials of IDR 20,771,590 based on the difference in the total cost of drawing inventories of IDR 2,772,420,000 with the total cost of current inventories of IDR 2,793,191,590. Abstrak. CV. Asri Collection merupakan perusahaan yang memproduksi mukena. Produk mukena yang dihasilkan dikelompokan menjadi 1 familly dan 3 item yang terdiri dari mukena dop, mukena catalia, dan mukena armany. Perusahaan ini memiliki strategi merespon pasar make to stock (MTS), yaitu strategi merespon pasar yang dilakukan oleh perusahaan dengan mengedepankan produksi terlebih dahulu kemudian produk tersebut dijadikan stok produk oleh perusahaan. Hubungan bisnis yang dilakukan perusahaan yaitu business to business (B2B) yaitu hubungan bisnis yang menjual produk kepada distributor permasalahan yang dihadapi perusahaan adalah pemesanan bahan baku yang tidak sesuai kebutuhan yang menyebabkan kuantitas produk yang dihasilkan sering mengalami overproduction atau backorder. Penelitian ini berfokus terhadap perencanaan produksi dan pengendalian inventoryyang memiliki tujuan mengusulkan sistem perencanaan produksi dan pengendalian inventory yang tepat agar dapat memenuhi permintaan produk mukena. Tahapan yang dilakukan dalam penelitian ini yaitu dengan melakukan peramalan, perencanaan agregat, disagregasi yang menghasilkan jadwal induk produksi untuk mengetahui kapan waktu produksi dilakukan, melakukan uji kelayakan dengan Rough Cut Capacity Planning, melakukan pengendalian persediaan bahan baku dengan Material Requirement Planning . Hasil dari penelitian ini yaitu usulan perencanaan produksi perusahaan harus menghasilkan 4.300 unit mukena setiap bulannya berdasarkan jadwal induk produksi. Dan usulan pengendalian inventory dengan melakukan pemesanan sebanyak 7 kali dalam 10 periode. Dengan demikian perusahaan dapat menghemat pengeluaran untuk pembelian bahan baku sebesar Rp20.771.590 berdasarkan selisih total inventory cost usulan sebesar Rp2.772.420.000 dengan total inventory cost saat ini sebesar Rp2.793.191.590.
Perencanaan Jadwal Produksi Induk dengan Pendekatan Time Fences di CV Qanita Fashion Dwinur Rahmah Meidy Putri; Nita Puspita Anugrah Hidayat; Chaznin R Muhammad
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 1 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i1.6372

Abstract

Abstract. CV Qanita Fashion is a company engaged in the clothing industry by producing t-shirts, sweaters, shirts and jackets since 2014. The company's strategy in responding to the market is Make to Order (MTO). Based on the results of observations, it was found that problems occurred regarding delays in the form of delays in fulfilling orders beyond the due date agreed in the previous agreement. Therefore, this research was conducted in order to create a good production schedule using the Time Fences approach. The purpose of this calculation is to avoid delays in delivery to consumers continuously. The data needed to conduct research are order data, production cost data, working time data, standard time data. After collecting the data, the research phase was carried out using the Master Production Schedule (JPI), including aggregate planning, disaggregation, master production schedule, and Rough Cut Capacity Planning (RCCP), as well as applying the Time Fences approach. Production scheduling is preceded by identifying additional arrival orders with three Time Fence zones. From the results of the research that has been done, it can be concluded that companies often experience delays because they experience difficulties at work stations 2, the fifth process. Abstrak. CV Qanita Fashion adalah salah satu perusahaan yang bergerak dibidang industri pakaian dengan memproduksi t-shirt, sweater, kemeja, dan jaket sejak tahun 2014. Strategi perusahaan dalam merespon pasar adala Make to Order (MTO). Penelitian ini dilakukan pada lantai produksi dari proses pembuatan keempat jenis produk, kegiatan produksi dilakukan untuk memenuhi pesanan aktual dan tambahan. Berdasarkan dari hasil observasi ditemukan permasalahan yang terjadi mengenai keterlambatan berupa keterlambatan pemenuhan pesanan diluar batas due date yang telah disepakati pada perjanjian sebelumnya. Oleh karena itu, penelitian ini dilakukan agar terciptanya jadwal produksi yang baik dengan menggunakan pendekatan Time Fences. Tujuan perhitungan tersebut yaitu agar tidak terjadi keterlambatan pengiriman ke konsumen secara terus menerus. Data yang diperlukan untuk melakukan penelitian yaitu data pesanan, data ongkos produksi, data waktu kerja, data waktu baku. Setelah dilakukan pengumpulan data tersebut, melakukan tahapan penelitian menggunakan Jadwal Produksi Induk (JPI), meliputi perencanaan agregrat, disagregrasi, jadwal produksi induk, dan Rough Cut Capacity Planning (RCCP), serta menerapkan pendekatan Time Fences. Penjadwalan produksi diawali dengan mengidentifikasi kedatangan pesanan tambahan dengan tiga zona Time Fences. Hasil penelitian yang telah dilakukan maka dapat ditarik kesimpulan bahwa perusahan sering mengalami keterlambatan karena terjadinya penumpukan pada stasiun kerja 2 proses kelima.
Upaya Mengurangi Biaya Persediaan Bahan Baku Pada Strategi Hybrid (Make to Stock dan Make to Order) di PT T Sarah Citrawati; Chaznin R Muhammad; Reni Amaranti
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 1 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i1.7056

Abstract

Abstract. PT. T is a company in Bandung engaged in the food sector. PT. T produces bread, pastries, sauces, tarts, cakes, and processed meats. PT. T sells production in stores (MTS strategy) and accepts consumer orders (MTO strategy). PT. T orders the same number of raw materials for each order—meanwhile, the raw materials used by PT. T is food raw materials that have characteristics with a certain shelf life. Based on the problems in PT. T, a procedure is proposed to determine the number of raw materials that must be prepared to reduce the Total Inventory Cost by considering the expiration date of raw materials in companies implementing a hybrid strategy. The procedure is to determine the Decoupling Point, calculate forecasting, prepare a Master Production Schedule (MPS), and calculate Material Requirement Planning (MRP). After calculating the proposed procedure, the Total Inventory Cost for the EOQ method is IDR. 224.225.833, and the Total Inventory Cost on the EOQ method, which considers expiration is IDR. 213.412.375. This shows that by using the proposed EOQ procedure and considering the expiration date, the company can reduce the Total Inventory Cost by IDR. 95.724.293. Abstrak. PT T merupakan perusahaan di Bandung yang bergerak di bidang makanan. PT T memproduksi roti, kue kering, soes, tart, bolu, dan daging olahan. PT T menjual hasil produksi di toko (strategi MTS) dan menerima pesanan dari konsumen (strategi MTO). PT T memesan bahan baku dalam jumlah yang sama untuk setiap pemesanan. Sedangkan bahan baku yang digunakan oleh PT T adalah bahan baku makanan yang memiliki karakteristik dengan umur simpan tertentu.Berdasarkan permasalahan di PT T, diusulkan prosedur untuk menentukan jumlah bahan baku yang harus disiapkan untuk menekan Total Inventory Cost dengan memperhatikan tanggal kadaluwarsa bahan baku di perusahaan yang menerapkan strategi hybrid. Prosedurnya adalah menentukan Decoupling Point, menghitung forecasting, menyusun Master Production Schedule (MPS), dan menghitung Material Requirement Planning (MRP). , dan Total Inventory Cost pada metode EOQ yang mempertimbangkan kadaluarsa adalah Rp 213.412.375 Hal ini menunjukkan bahwa dengan menggunakan prosedur EOQ yang diusulkan dan mempertimbangkan tanggal kadaluwarsa, perusahaan dapat menurunkan Total Inventory Cost sebesar Rp. 95.724.293.
Upaya Mengurangi Biaya Persediaan Bahan Baku pada Strategi Hybriddi PT. T Sarah Citrawati; Chaznin R. Muhammad; Reni Amaranti
Jurnal Riset Teknik Industri Volume 3, No. 1, Juli 2023, Jurnal Riset Teknik Industri (JRTI)
Publisher : UPT Publikasi Ilmiah Unisba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/jrti.v3i1.1976

Abstract

Abstract. PT. T is a company in Bandung engaged in the food sector. PT. T produces bread, pastries, sauces, tarts, cakes, and processed meats. PT. T sells production in stores (MTS strategy) and accepts consumer orders (MTO strategy). PT. T orders the same number of raw materials for each order—meanwhile, the raw materials used by PT. T is food raw materials that have characteristics with a certain shelf life. Based on the problems in PT. T, a procedure is proposed to determine the number of raw materials that must be prepared to reduce the Total Inventory Cost by considering the expiration date of raw materials in companies implementing a hybrid strategy. The procedure is to determine the Decoupling Point, calculate forecasting, prepare a Master Production Schedule (MPS), and calculate Material Requirement Planning (MRP). After calculating the proposed procedure, the Total Inventory Cost for the EOQ method is IDR. 224.225.833, and the Total Inventory Cost on the EOQ method, which considers expiration is IDR. 213.412.375. This shows that by using the proposed EOQ procedure and considering the expiration date, the company can reduce the Total Inventory Cost by IDR. 95.724.293. Abstrak. PT T merupakan perusahaan di Bandung yang bergerak di bidang makanan. PT T memproduksi roti, kue kering, soes, tart, bolu, dan daging olahan. PT T menjual hasil produksi di toko (strategi MTS) dan menerima pesanan dari konsumen (strategi MTO). PT T memesan bahan baku dalam jumlah yang sama untuk setiap pemesanan. Sedangkan bahan baku yang digunakan oleh PT T adalah bahan baku makanan yang memiliki karakteristik dengan umur simpan tertentu.Berdasarkan permasalahan di PT T, diusulkan prosedur untuk menentukan jumlah bahan baku yang harus disiapkan untuk menekan Total Inventory Cost dengan memperhatikan tanggal kadaluwarsa bahan baku di perusahaan yang menerapkan strategi hybrid. Prosedurnya adalah menentukan Decoupling Point, menghitung forecasting, menyusun Master Production Schedule (MPS), dan menghitung Material Requirement Planning (MRP). , dan Total Inventory Cost pada metode EOQ yang mempertimbangkan kadaluarsa adalah Rp 213.412.375 Hal ini menunjukkan bahwa dengan menggunakan prosedur EOQ yang diusulkan dan mempertimbangkan tanggal kadaluwarsa, perusahaan dapat menurunkan Total Inventory Cost sebesar Rp. 95.724.293.
Peningkatan Throughput Garmen melalui Perbaikan Stasiun Kerja Bottleneck dengan Theory of Constraint Aji Saeful Rohman; Chaznin R. Muhammad
Jurnal Riset Teknik Industri Volume 2, No. 2, Desember 2022, Jurnal Riset Teknik Industri (JRTI)
Publisher : UPT Publikasi Ilmiah Unisba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/jrti.v2i2.1138

Abstract

Abstract. PT. L is a company engaged in the garment sector. The obstacle encountered in this company is work in process at the Sewing Work Station and the Finishing Work Station and there are work stations are idle at the Embroidery Work Station. These constraints are caused by an unbalanced capacity occurs due to differences in the operating process time at each work station. Therefore, capacity must be increased so that demand can be met and the resulting throughput is maximized. This increase can be done by implementing the Theory of Constraint steps starting from the identification of constraints, exploitation of constraints, subordination of other sources and elevation of constraints.The final result of the application of the theory of constraint is the application of overtime at the constraint work station, namely Sewing 1, an additional overtime is added for one hour and for Finishing 1,2 3 and Packaging 1, two hours each. The increase that occurs is in the utility of work stations for Sewing 1 from 104.70% to 91.96% while for Finishing 1, 2, 3 and Packaging 1, respectively from 123.18%, 127.87%, 116.73% and 124.12% to 95.81%, 99.45%, 90.79% and 96.54%, respectively. With the increase in capacity, the Throughput obtained has increased from Rp. 1,033,868,000 to Rp 1,274,504,000. Abstrak. L merupakan suatu perusahaan yang bergerak dalam bidang garmen. Gejala yang ditemui pada perusahaan ini yaitu terjadi penumpukkan barang setengah jadi pada Stasiun Kerja Sewing dan Stasiun Kerja Finishing serta terdapat stasiun kerja yang mengalami idle pada Stasiun Kerja Embroidery yang disebabkan oleh kapasitas yang tidak seimbang karena perbedaan waktu proses operasi pada setiap stasiun kerja. Oleh karena itu, kapasitas harus ditingkatkan agar permintaan dapat dipenuhi dan throughput yang dihasilkan menjadi maksimal. Peningkatan tersebut dapat dilakukan dengan penerapan langkah – langkah Theory of Constraint mulai dari identifikasi constraint, eksploitasi constraint, subordinasi sumber lain serta elevasi constraint. Hasil akhir dari penerapan theory of constraint yaitu berupa penerapan overtime pada Stasiun Kerja constraint yaitu Stasiun Kerja Sewing 1 dilakukan penambahan waktu overtime sebanyak satu jam dan untuk Stasiun Kerja Finishing 1,2 3 dan Packaging 1 masing – masing sebanyak dua jam. Peningkatan yang terjadi yaitu terdapat pada utilitas stasiun kerja untuk Stasiun Kerja Sewing 1 dari 104,70% menjadi 91,96% sedangkan untuk stasiun kerja Finishing 1, 2, 3 dan Packaging 1 masing – masing dari 123,18%, 127,87%, 116,73% dan 124,12% menjadi 95,81%, 99,45%, 90,79% dan 96,54%. Adanya peningkatan kapasitas tersebut, maka throughput yang didapatkan mengalami peningkatan dari Rp. 1.033.868.000 menjadi Rp 1.274.504.000
Reduksi Total Inventory Cost Bahan Baku Box Panel dengan Pendekatan Material Requirement Planning (MRP) Wafiq, Rafa Auliya; R. Muhammad, Chaznin
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 2 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i2.8833

Abstract

Abstract. PT. Bintang Cemerlang Presisindo is a company engaged in metal fabrication and manufacturing of electrical panel boxes which was founded in 2013 PT. Bintang Cemerlang Presisindo implements a Make To Order market response strategy. Currently the company is experiencing a stockpile of raw materials at the end of 2022. The cause of this stockpile is that the purchase of raw materials has not been planned properly and the quantity ordered for raw materials has not been calculated correctly so that inventory exceeds the amount needed in the production process. Raw materials that accumulate in warehouses have an impact on increasing storage costs. This of course results in an increase in total inventory costs and total production costs that must be incurred. In addition, unused raw materials will be stored in warehouses and if stored for too long can cause these raw materials to become defective and damaged. Based on this phenomenon, the formulation of the problem in this study is "How to propose a policy for planning raw material supply for panel boxes using the Material Requirement Planning (MRP) approach?" Because the demand for panel boxes is fluctuating, forecasting is carried out in this study to determine the number of requests for panel boxes outside the target or the company's fixed orders each month. Forecasting is also carried out as a basis for planning in calculating the amount of raw material inventory that must be prepared as a purchasing strategy before the production process is carried out. 4,120,004,115. Abstrak. PT. Bintang Cemerlang Presisindo adalah perusahaan yang bergerak di bidang fabrikasi logam dan manufaktur box panel listrik yang didirikan pada tahun 2013 PT. Bintang Cemerlang Presisindo menerapkan strategi respon pasar Make To Order. Saat ini perusahaan mengalami penumpukan bahan baku pada akhir tahun 2022. Penyebab dari penumpukan tersebut adalah pembelian bahan baku belum direncanakan dengan baik dan kuantitas pemesanan bahan baku belum dihitung dengan tepat sehingga persediaan melebihi jumlah yang dibutuhkan dalam proses produksi. . Bahan baku yang menumpuk digudang berdampak pada peningkatan biaya penyimpanan seperti biaya listrik, biaya tenaga kerja dan lain lain. Hal tersebut tentu mengakibatkan peningkatan total inventory cost dan total ongkos produksi yang harus dikeluarkan. Selain itu, bahan baku yang tidak terpakai akan disimpan pada gudang dan apabila terlalu lama disimpan dapat mengakibatkan bahan baku tersebut menjadi cacat dan mengalami kerusakan. Berdasarkan fenomena tersebut, rumusan masalah dalam penelitian ini yaitu “Bagaimana usulan kebijakan perencanaan persediaan bahan baku box panel menggunakan pendekatan Material Requirement Planning (MRP)?”Pada penelitian dilakukan pengendalian persediaan bahan baku untuk produksi box panel menggunakan pendekatan Material Requirement Planning. Karena permintaan box panel bersifat fluktuatif, maka dilakukan forecasting pada penelitian ini untuk mengetahui jumlah permintaan box panel diluar target atau pesanan tetap perusahaan tiap bulannya. Forecasting juga dilakukan sebagai dasar untuk perencanaan dalam menghitung jumlah persediaan bahan baku yang harus disiapkan sebagai strategi pembelian sebelum proses produksi dilakukan Berdasarkan hasil perhitungan adapun selisih total biaya persediaan kebijakan usulan dengan kebijakan saat ini adalah Rp. 4.120.004.115.
Perbaikan Pengendalian Persediaan Bahan Baku Pipa Sqr 50/25 X 1.2 X 407 dengan Menggunakan Metode Pendekatan Mrp pada PT. Chitose Internasional Tbk Fitria Zahrannisa; Chaznin R. Muhammad
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 2 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i2.9142

Abstract

Abstract. PT. Chitose Internasional Tbk is a company engaged in the furniture sector which is divided into 5 production lines, namely hotel and restaurant furniture production lines, office and school production lines, residential production lines, hospital mattress and infusion support production lines, chair and piano table production lines . PT. Chitose Internasional Tbk has not been able to control its raw material inventory, so the inventory costs incurred by the company are still relatively large. The problems faced by PT. Chitose Internasional Tbk, sometimes when product demand increases, the company is unable to fulfill it due to a lack of existing raw material supplies. And conversely, when product demand decreases and there is too much inventory, losses will occur because the number of raw materials shrinks. Therefore the company needs to carry out raw material inventory control which is proposed to support and minimize problems that occur in raw material inventory control for SQR 50/25 x 1.2 x 407 pipes, namely by using the MRP approach method, because to find out the amount of product that must be produced in each period and timing of output over a certain period of time (3 months to 1 year) by adjusting the variables of employee production levels, inventory, other controllable variables and to find out how big the relationship is between required capacity and available capacity, is it sufficient or not. Abstrak. PT. Chitose Internasional Tbk merupakan perusahaan yang bergerak pada sektor furnitur yang terbagi pada 5 lini produksi yaitu lini produksi mebel hotel dan restoran, lini produksi kantor dan sekolah, lini produksi rumah tinggal, lini produksi kasur rumah sakit dan penyangga infus, lini produksi kursi dan meja piano. PT. Chitose Internasional Tbk belum mampu mengendalikan persediaan bahan bakunya, sehingga biaya pesediaan yang dikeluarkan oleh perusahaan terbilang masih besar. Adapun masalah yang dihadapi oleh PT. Chitose Internasional Tbk, terkadang saat permintaan produk meningkat, perusahaan tidak mampu untuk memenuhinya karena kurangnya persediaan bahan baku yang ada. Dan sebaliknya, ketika permintaan produk menurun dan terlalu banyaknya persediaan, maka akan terjadi kerugian yang ditimbulkan karena banyaknya bahan baku yang menyusut. Maka dari itu perusahaan perlu melakukan pengendalian persediaan bahan baku yang diusulkan untuk mendukung dan meminimalisir permasalahan yang terjadi dalam pengendalian persediaan bahan baku pipa SQR 50/25 x 1.2 x 407 yaitu dengan menggunakan metode pendekatan MRP, karena untuk mengetahui jumlah produk yang harus diproduksi pada tiap periode dan pengaturan waktu keluaran selama periode waktu tertentu (3 bulan sampai 1 tahun) melalui penyesuaian variabel-variabel tingkat produksi karyawan, persediaan, variabel yang dapat dikendalikan lainnya serta untuk mengetahui seberapa besar hubungan antara kapasitas yang dibutuhkan dengan kapasitas yang tersedia, apakah mencukupi atau tidak.
Penerapan Lean Manufacturing untuk Mereduksi Waste pada Proses Produksi Celana Jeans di PT. X Maulana Muwahid, Irfan; R. Muhammad, Chaznin; Amaranti, Reni
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 2 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i2.9317

Abstract

Abstract. PT. X is a garment company in the city of Bandung that produces various types of clothing. This research focuses on one of the company's products, namely jeans. The results of observations on the jeans production process found some waste (waste) consisting of excessive transportation, repeated inspection processes, lots of unused materials and goods, and waiting employees. This waste has an impact on production lead times that are getting longer. Therefore, this study aims to reduce waste (waste) that occurs in the production process of jeans. Improvements made are by utilizing the concept of Lean Manufacturing, assisted by Value Stream Mapping (VSM) tools, Seven Waste Questionnaire, Value Stream Mapping Analysis Tools (VALSAT), and cause and effect diagrams (Fishbone). The results of weighting waste using the Seven Waste questionnaire, obtained the three most influential types of waste, namely Excess Processing at 31.40%, Transportation at 22.09%, and Unnecessary Inventory at 16.28%, followed by other types of waste namely Waiting by 11.63%, Unnecessary Motion by 9.30%, Defect by 8.14%, and Overproduction by 1.16%. Proposals for improvements were made only for the three most influential reductions in types of waste (waste), namely by designing visual work standards, redesigning layouts, and implementing a 5S work culture. The result of implementing the improvement was a reduction in the total Production Lead Time in the Future State by 108.95 minutes, thereby increasing Process Cycle Efficiency (PCE) by 18.92%, from 57.26% to 76.19%. Keywords: Waste, Lean Manufacturing, Value Stream Mapping (VSM) Abstrak. PT. X merupakan perusahaan garmen di Kota Bandung yang memproduksi berbagai jenis pakaian. Penelitian ini berfokus pada salah satu produk perusahaan yaitu celana jeans. Hasil observasi pada proses produksi celana jeans ditemukan beberapa pemborosan (waste) yang terdiri dari transportasi berlebihan, proses pemeriksaan secara berulang, penumpukan bahan dan barang tidak terpakai, serta karyawan yang menunggu. Pemborosan (waste) tersebut berdampak pada lead time produksi yang semakin panjang. Oleh karena, penelitian ini bertujuan untuk mereduksi pemborosan (waste) yang terjadi pada proses produksi celana jeans. Upaya perbaikan yang dilakukan adalah dengan memanfaatkan konsep Lean Manufacturing, dibantu dengan tools Value Stream Mapping (VSM), Kuesioner Seven Waste, Value Stream Mapping Analysis Tools (VALSAT), serta diagram sebab akibat (Fishbone). Hasil pembobotan pemborosan (waste) menggunakan kuesioner Seven Waste, didapatkan tiga jenis pemborosan (waste) paling berpengaruh yaitu Excess Processing sebesar 31,40%, Transportation sebesar 22,09%, serta Unnecessary Inventory sebesar 16,28%, diikuti oleh jenis pemborosan lain yaitu Waiting sebesar 11,63%, Unecessary Motion sebesar 9,30%, Defect sebesar 8,14%, serta Overproduction sebesar 1,16%. Usulan perbaikan yang dibuat untuk mereduksi tiga jenis pemborosan (waste) paling berpengaruh yaitu dengan perancangan standarisasi kerja visual, perancangan ulang layout, serta penerapan budaya kerja 5S. Hasil penerapan usulan perbaikan adalah berkurangnya total Production Lead Time pada Future State sebesar 108,95 menit, sehingga meningkatkan Process Cycle Efficiency (PCE) sebesar 18,92% yaitu dari 57,26% menjadi 76,19%. Kata Kunci: Waste, Lean Manufacturing, Value Stream Mapping (VSM)
Perbaikan Kinerja Pengadaan Material Perusahaan dengan Mengggunakan Pendekatan Supply Chain Operation Reference (SCOR) dan Lean Supply Chain Alif Abi Hanif; Rakhmat Ceha; Chaznin R. Muhammad
Bandung Conference Series: Industrial Engineering Science Vol. 4 No. 1 (2024): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v4i1.10288

Abstract

Abstract. PT IMP is a company engaged in the production of metal frames located in Cikarang and is committed to producing the best quality products with national standards, in the right amount and time. In fact, there are still some obstacles in the material procurement process such as difficulties in selecting suppliers that match the criteria, delays in the arrival of raw materials which result in obstruction of the production process and product distribution until the ToP cannot be met. An evaluation of the company's ongoing material procurement performance is needed. This research measures the company's performance using the Supply Chain Operation Reference (SCOR) Model, which divides supply chain activities into five core processes, namely plan, source, make, deliver and return. Each process consists of 3 levels. The mapped SCOR model consists of 5 core processes at level 1, 17 performance matrices at level 2, and 25 KPIs at level 3. SCOR model performance weighting is carried out using supporting methods, namely the Analytical Hierarchy Process (AHP) method and normalization. The overall SCOR performance value measurement result is 61.51. Based on the company's performance indicator monitoring system, the performance value currently achieved is in the average category, because it is in the value range of 50-70. Therefore, improvements need to be made to improve the current material procurement performance value. Proposed improvements are made in the form of proposed strategies based on 25 KPIs that affect the achievement of material procurement performance values. The proposed improvement strategy is designed based on Lean Supply Chain principles, through the application of Gemba Kaizen which consists of 14 proposed strategies. Abstrak. PT. IMP merupakan perusahaan yang bergerak di bidang produksi rangka metal yang berada di Cikarang dan berkomitmen untuk menghasilkan produk dengan kualitas terbaik berstandar nasional, dalam jumlah dan waktu yang tepat. Kenyataannya masih terjadi beberapa kendala pada proses pengadaan materialnya seperti kesulitan dalam memilih supplier yang sesuai dengan kriteria, keterlambatan datangnya bahan baku yang berakibat terhambatnya proses produksi dan distribusi produk sampai dengan ToP yang tidak dapat terpenuhi. Diperlukan evaluasi kinerja pengadaan material perusahaan yang sedang berjalan. Penelitian ini mengukur kinerja perusahaan dengan menggunakan Model Supply Chain Operation Reference (SCOR), yang membagi aktivitas rantai pasok kedalam lima proses inti, yaitu plan, source, make, delivery dan return. Masing-masing proses terdiri atas 3 level. Model SCOR yang dipetakan terdiri dari 5 proses inti pada level 1, 17 matriks kinerja pada level 2, dan 25 KPI pada level 3. Pembobotan kinerja model SCOR dilakukan menggunkan metode pendukung, yaitu metode Analytical Hierarchy Process (AHP) dan normalisasi. Hasil pengukuran nilai kinerja SCOR secara keseluruhan adalah 61,51. Berdasarkan sistem monitoring indikator kinerja perusahaan, nilai kinerja yang dicapai saat ini berada pada kategori rata-rata, karena berada pada rentang nilai 50-70. Oleh karena itu, perlu dilakukan perbaikan untuk meningkatkan nilai kinerja pengadaan material saat ini. Usulan perbaikan dibuat dalam bentuk usulan strategi berdasarkan 25 KPI yang berpengaruh terhadap pencapaian nilai kinerja pengadaan material. Usulan strategi perbaikan dirancang berdasarkan prinsip Lean Supply Chain, melalui penerapan Gemba Kaizen yang terdiri dari 14 usulan strategi.
Usulan Perbaikan Stasiun Kerja Bottleneck pada Pembuatan Stay Side Cover dengan menggunakan Pendekatan Theory Of Constraint (TOC) Iffan, Iffan Arief Andita; Satori, Mohamad; Chaznin R. Muhammad
Bandung Conference Series: Industrial Engineering Science Vol. 4 No. 1 (2024): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v4i1.11126

Abstract

Abstract. CV. Daya Reksa Presindo is a middle-class industrial company that produces motorcycle parts. In an effort to meet production targets, companies often experience constraints in production process activities, namely unbalanced machine capacity, resulting in work in process (WIP) at drilling work stations. Based on observations, the occurrence of stacking due to the speed of piercing and bending work station is not able to keep up with the drilling workstation. (1) Therefore, with these problems can be done using the Theory Of Constraint (TOC) approach, the TOC steps used are constraint identification, constraint exploitation using linear programming, then scheduling using Campbell Dudek and Smith (CDS). (2) Coordinate constraint using Drum Buffer Rope (DBR), then alternative final proposals are carried out elevation constraints. (3) It was found that there was a constraint in the form of a capacity constraint that occurred at the drilling workstation. This workstation has a load of 136.40%. (4) The problem is solved by using Drum Buffer Rope (DBR). (5) The final stage of TOC is elevation constraint, the proposal given is to increase the capacity of drilling work station with an increase in working hours to 10.4 hours. With the implementation of the proposal, the company was able to meet production needs and increase throughput by Rp. 80.292.000 with overtime cost that must be incurred of Rp. 4.864.958. Abstrak. CV. Daya Reksa Presindo merupakan perusahaan industri kelas menengah yang memproduksi part motor. Dalam usaha untuk memenuhi target produksi, perusahaan sering mengalami kendala pada kegiatan proses produksi, yaitu tidak seimbangnya kapasitas mesin, sehingga mengakibatkan timbulnya work in process (WIP) pada stasiun kerja drilling (pengeboran). Berdasarkan observasi, terjadinya penumpukan dikarenakan kecepatan stasiun kerja piercing dan bending tidak mampu mengimbangi stasiun kerja drilling. (1) Maka dari itu, dengan adanya permasalahan tersebut dapat dilakukan dengan menggunakan pendekatan Theory Of Constraint (TOC), langkah-langkah TOC yang digunakan ialah identifikasi constraint, eskploitasi constraint menggunakan liniear programing, kemudian penjadwalan dengan menggunakan Campbell Dudek and Smith (CDS). (2) Suboordinasi constraint dengan menggunakan Drum Buffer Rope (DBR), kemudian alternatif usulan akhir dilakukan elevasi constraint. (3) Ditemukan adanya constraint yang berupa capacity constraint yang terjadi pada stasiun kerja drilling. Stasiun kerja ini memiliki beban sebesar 136,40%. (4) Permasalahan tersebut diatasi dengan menggunakan Drum Buffer Rope (DBR). (5) Tahapan akhir TOC ialah elevasi constraint, usulan yang diberikan ialah penambahan kapasitas stasiun kerja drilling dengan penambahan jam kerja menjadi 10,4 jam. Dengan diterapkannya usulan tersebut, perusahaan mampu memenuhi kebutuhan produksi serta meningkatkan throughput sebesar Rp.80.292.000 dengan biaya over time yang harus dikeluarkan sebesar Rp. 4.864.958.